Monitoring condition of elongated ferrous object having a longitudinal axis
US-10155645-B2 · Dec 18, 2018 · US
US10752473B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10752473-B2 |
| Application number | US-201515539000-A |
| Country | US |
| Kind code | B2 |
| Filing date | Dec 9, 2015 |
| Priority date | Dec 23, 2014 |
| Publication date | Aug 25, 2020 |
| Grant date | Aug 25, 2020 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The invention relates to a method of monitoring the safety of a crane, in particular of a revolving tower crane having a revolving deck, wherein the crane has a sensor system and a crane control, and wherein furthermore at least one tilt sensor is provided. In accordance with the invention, the at least one tilt sensor is attached to the revolving deck of the revolving tower crane, with the monitoring of the crane safety taking place at least during the putting up and/or taking down of the revolving tower crane.
Opening claim text (preview).
The invention claimed is: 1. A system for monitoring safety of a revolving tower crane having a revolving deck, a substructure and a tower, wherein the system has a sensor system, a crane control, and at least one tilt sensor attached and installed at the revolving deck for monitoring the safety during raising and lowering of the revolving tower crane, after the revolving deck is installed on the crane and as the revolving deck is raised up the tower. 2. A system in accordance with claim 1 , wherein said at least one tilt sensor also monitors the safety during operation of the erected crane. 3. A method of monitoring safety of a revolving tower crane having a revolving deck, a sensor system, a crane control, and at least one tilt sensor, comprising the steps of attaching and installing the at least one tilt sensor at the revolving deck, monitoring crane safety during raising and lowering of the revolving tower crane, raising of the crane starts with assembly of a tower on a substructure, then placing the revolving deck having the installed at least one tilt sensor on the substructure, starting the monitoring after the placing on of the revolving deck, and continuing the monitoring as the revolving deck is raised toward a top of, the tower. 4. A method in accordance with claim 3 , wherein position of the revolving deck is determined via the at least one tilt sensor and received measured values are transmitted to the crane control for evaluation, with an action being triggered on exceeding a predefined limit value. 5. A method in accordance with claim 3 , wherein inclination of the revolving deck determined by the at least one tilt sensor is compared with inclination values provided for the respective setup, with a warning signal being output on exceeding of a permitted tilt or angle of inclination, and the determined data being logged. 6. A method in accordance with claim 3 , wherein a correction of the data determined by the at least one tilt sensor is carried out in conjunction with values determined via a provided wind gauge. 7. A method in accordance with claim 3 , wherein inclination results from a torque generated by a counter-boom and a hoist winch and in dependence on the height of the tower of the revolving tower crane after the assembly of the counter-boom, with the resulting inclination being determined by the at least one tilt sensor and being compared with data stored in the crane control. 8. A method in accordance with claim 3 , wherein an angle of rotation sensor is provided in addition to the at least one tilt sensor to determine position-dependent inclination of the tower, for placing of counter-ballast on the assembly. 9. A method in accordance with claim 3 , wherein an angle of inclination a(x) is determined after the assembly of the boom and is noted to log an intermediate step. 10. A method in accordance with claim 3 , wherein counter-ballast is added in a further method step, with the correctness of permitted inclinations for a fixed configuration of the crane being confirmed by a full rotation of the crane thus set up by 360°, and the rotation being able to take place with an installed trolley at the tower and/or with a trolley at the boom tip. 11. A method in accordance with claim 3 , wherein the crane is rotated by 360° after adding counter-ballast to confirm the correctness of inclinations for a fixed configuration. 12. A method in accordance with claim 3 , wherein monitoring also takes place during lowering of the boom and/or a counter-boom such that a warning signal is output on an exceeding of permitted inclination values. 13. A method in accordance with claim 3 , wherein inclinations are recorded in the crane control and compared in the form of a load curve with current load torques, with any deviations being logged. 14. A method in accordance with claim 3 , wherein an angle of inclination in dependence on load torque/static torque and an angle of rotation of the crane, are constantly monitored during operation, with deviations from permitted stored values being displayed. 15. A method in accordance with claim 3 , wherein inclination is monitored during the raising and lowering of the revolving tower crane.
electrical · CPC title
Luffing gear · CPC title
electrical · CPC title
and movable to take account of variations of load or of variations of length of jib · CPC title
for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail (with supporting couples provided by walls or buildings B66C23/20; mounted on vehicles B66C23/36; jib constructions B66C23/64) · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.