Method and system for the maintenance of a wind energy installation from a group of wind energy installations

US10711767B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10711767-B2
Application numberUS-201916293821-A
CountryUS
Kind codeB2
Filing dateMar 6, 2019
Priority dateMar 6, 2018
Publication dateJul 14, 2020
Grant dateJul 14, 2020

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method for the maintenance of a first wind energy installation from a group of wind energy installations. In the method, a future maintenance time period is identified in which a boost power of the group of wind energy installations is greater than a prescribed threshold value, wherein the boost power results from a wind speed predicted for the future maintenance time period, said wind speed being greater than a rated wind speed. The power of the first wind energy installation is reduced after the start of the maintenance time period and a boost power is drawn from a plurality of wind energy installations from the group of wind energy installations. A maintenance process is carried out at the first wind energy installation. The invention furthermore relates to a control unit suitable for carrying out the method.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method for the maintenance of a first wind energy installation ( 15 ) from a group of wind energy installations ( 14 , 15 ) comprising the following steps: a. identifying a future maintenance time period ( 26 ) in which a boost power of the group of wind energy installations ( 14 , 15 ) is greater than a prescribed threshold value, wherein the boost power results from a wind speed ( 23 ) predicted for the future maintenance time period ( 26 ), said wind speed being greater than a rated wind speed ( 24 ); b. reducing the power of the first wind energy installation ( 15 ) after the start of the maintenance time period and drawing a boost power from a plurality of wind energy installations ( 14 ) from the group of wind energy installations ( 14 , 15 ); c. carrying out a maintenance process at the first wind energy installation ( 15 ). 2. The method of claim 1 , wherein a future maintenance time period ( 26 ) is identified in which the predicted environmental conditions at at least one wind energy installation ( 15 ) are more favorable than the standard conditions assumed in the design of the wind energy installation ( 15 ) and in that the boost power is drawn from the wind energy installation ( 15 ) within a measurement range of the design. 3. The method of claim 1 , wherein a future maintenance time period ( 26 ) is identified in which the predicted wind turbulence, a vertical and/or horizontal wind gradient, an upflow, a wake condition in the group of wind energy installations and/or an air density are low. 4. The method of claim 1 , wherein the first wind energy installation ( 15 ) is brought to a standstill after the start of the maintenance time period ( 26 ). 5. The method of claim 1 , wherein between a time (T 0 ) at which the future maintenance time period ( 26 ) is identified and the start of the maintenance time period ( 26 ), a maintenance plan is created, which determines a maintenance process to be carried out in the future maintenance time period ( 26 ) for the first wind energy installation ( 15 ). 6. The method of claim 1 , wherein the prescribed threshold value for the boost power is related to the power loss to be expected in the first wind energy installation ( 15 ) during the maintenance time period ( 26 ). 7. The method of claim 6 , wherein the prescribed threshold value is selected so that it corresponds to at least 40%, preferably at least 80%, further preferably at least 100% of the power loss to be expected at the first wind energy installation ( 15 ). 8. The method of claim 1 , wherein the future maintenance time period ( 26 ) is identified in which the power loss of the first wind energy installation ( 15 ) to be expected is lower than the rated power of the first wind energy installation ( 15 ). 9. The method of claim 1 , wherein the future maintenance time period ( 26 ) is selected so that the boost power is greater than the prescribed threshold value over at least 40%, preferably over at least 60%, further preferably over at least 80% of the duration of the maintenance process. 10. The method of claim 1 , wherein the first wind energy installation ( 15 ) is connected to a transmission network ( 18 ) via a first network infeed point ( 17 ) and in that the group comprises wind energy installations ( 14 ) that are connected to a transmission network ( 18 ) via a second network infeed point ( 28 , 29 ). 11. The method of claim 10 , wherein the permissible power that can be fed in via the second network infeed point ( 28 , 29 ) is greater by an excess power than the sum of the rated powers of the wind energy installations ( 14 ) connected to the second network infeed point ( 28 , 29 ). 12. A control unit for carrying out a maintenance process at a first wind energy installation ( 15 ) from a group of wind energy installations ( 14 , 15 ), wherein the control unit ( 19 ) identifies, based on a wind prediction, a future maintenance time period ( 26 ) in which a boost power of the group of wind energy installations ( 14 , 15 ) is greater than a prescribed threshold value, wherein the control unit ( 19 ) is designed to generate a control signal after the start of the maintenance time period ( 26 ) in order to reduce the power of the first wind energy installation ( 15 ) and to draw a boost power from a plurality of wind energy installations ( 14 ) from the group of wind energy installations ( 14 , 15 ).

Assignees

Inventors

Classifications

  • Wind turbines with rotation axis in wind direction · CPC title

  • F03D17/00Primary

    Monitoring or testing of wind motors, e.g. diagnostics (testing during commissioning of wind motors F03D13/30) · CPC title

  • F03D7/048Primary

    controlling wind farms · CPC title

  • F03D80/50Primary

    Maintenance or repair · CPC title

  • Manufacturing or production processes characterised by the final manufactured product · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10711767B2 cover?
A method for the maintenance of a first wind energy installation from a group of wind energy installations. In the method, a future maintenance time period is identified in which a boost power of the group of wind energy installations is greater than a prescribed threshold value, wherein the boost power results from a wind speed predicted for the future maintenance time period, said wind speed …
Who is the assignee on this patent?
Senvion Gmbh
What technology area does this patent fall under?
Primary CPC classification F03D17/00. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Jul 14 2020 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 12 related publications on this page (citations in our corpus or others sharing the same primary CPC).