Graphical working range diagrams for displaying allowable and projected loads
US-2019062130-A1 · Feb 28, 2019 · US
US10676328B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10676328-B2 |
| Application number | US-201715680971-A |
| Country | US |
| Kind code | B2 |
| Filing date | Aug 18, 2017 |
| Priority date | Aug 24, 2016 |
| Publication date | Jun 9, 2020 |
| Grant date | Jun 9, 2020 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for controlling a boom of a crane includes saving, in a memory, data representing a maximum horizontal working distance for a load on a hook of a boom, saving, in the memory, boom data representing the position of the boom, calculating a minimum vector between the position of the hook and the maximum horizontal working distance, and controlling, by the computing device, movement of the boom to prevent the vector from reaching a zero magnitude.
Opening claim text (preview).
The invention claimed is: 1. A method for controlling a boom of a crane, the method executable by a computing device having a processor and memory, comprising: saving, in the memory, data representing a maximum horizontal working distance for a load on a hook of the boom, wherein the maximum horizontal working distance includes at least a first maximum horizontal working distance for a first angular range represented by a first cylindrical section extending through the first angular range and having a first radius which corresponds to the first maximum horizontal working distance and a second maximum horizontal working distance for a second angular range represented by a second cylindrical section extending through the second angular range and having a second radius which corresponds to the second maximum horizontal working distance; saving, in the memory, boom data representing the position of the boom; calculating a minimum vector between the position of the hook and the nearest of the first and second maximum horizontal working distances; and controlling, by the computing device, movement of the boom to prevent the vector from reaching a zero magnitude. 2. The method of claim 1 , wherein saving data representing the maximum horizontal working distance comprises inputting data representing a load chart. 3. The method of claim 1 , wherein the maximum horizontal working distance varies depending on a swing angle. 4. The method of claim 1 , wherein saving data representing the maximum horizontal working distance comprises detecting a load on the hook and calculating the maximum horizontal working distance based on the detected load. 5. The method of claim 4 , wherein calculating the maximum horizontal working distance comprises detecting a position of at least one outrigger and using the detected position to calculate the maximum horizontal working distance. 6. The method of claim 1 , wherein the method further comprises: saving, in memory, a forbidden zone near the crane; calculating a second, minimum vector between the forbidden zone and the boom; and limiting, by the computing device, movement of the boom to prevent the second vector from reaching a zero magnitude. 7. The method of claim 1 wherein limiting movement of the boom comprises: establishing a threshold vector magnitude; and changing a crane function responsive to the magnitude of the minimum vector between the hook and the maximum horizontal working distance being less than the threshold vector magnitude. 8. The method of claim 7 , wherein changing the crane function comprises slowing down the movement of the boom in at least one direction that moves the hook closer to the maximum horizontal working distance. 9. The method of claim 7 , wherein limiting movement of the boom further comprises: establishing a shutdown threshold vector magnitude; and stopping movement of the boom in response to the magnitude of the shutdown vector between the hook and the maximum horizontal working distance being less than the threshold vector magnitude. 10. The method of claim 7 , wherein the crane function is selected from the group consisting of telescoping in, telescoping out, booming up, booming down, swinging left, and swinging right. 11. A system for controlling a boom of a crane in proximity of obstacles at a worksite, comprising: a crane control system configured to control operation of the crane boom; a processor in operable communication with the crane control system; and memory in operable communication with the processor, the memory storing data comprising: data representing a coordinate system; data representing the crane boom; data representing a maximum horizontal working distance wherein the maximum horizontal working distance includes at least a first maximum horizontal working distance for a first angular range represented by a first cylindrical section extending through the first angular range and having a first radius which corresponds to the first maximum horizontal working distance and a second maximum horizontal working distance for a second angular range represented by a second cylindrical section extending though the second angular range and having a second radius which corresponds to the second maximum horizontal working distance; and computer executable instructions for execution by the processor, the computer executable instruction configured to calculate a minimum vector between the crane boom and the nearest of the first and second maximum horizontal working distances based on the data representing the crane boom and the data representing the maximum horizontal working distance, wherein the minimum vector includes a distance and a direction to the nearest of the first and second maximum horizontal working distances, and to cause the crane control system to limit movement of the boom based on the calculated minimum distance. 12. The system of claim 11 , wherein the data representing the maximum horizontal working distance is dependent on a swing angle. 13. The system of claim 11 further comprising a load sensor configured to measure a load on the crane boom, wherein the data representing a maximum horizontal working distance is dependent on a measured load on the hook. 14. The system of claim 13 , further comprising an outrigger length monitor configured to detect an outrigger length, wherein the detected outrigger length is used to calculate the maximum horizontal working distance. 15. A crane control system of a crane having a boom, the system comprising: a processor; a display operably coupled to the processor; and a memory in operable communication with the processor, the memory storing data comprising: data representing a coordinate system; data representing the crane boom based on one or more sensor measurements of the boom; data representing a maximum horizontal working distance; and computer executable instructions for execution by the processor, the computer executable instructions configured to generate a three-dimensional model comprising: a representation of the coordinate system based on the data representing the coordinate system; a representation of the crane boom based on the data representing the crane boom; and a representation of the maximum horizontal working distance based on the data representing the maximum horizontal working distance, wherein the representation of the maximum horizontal working distance includes at least a representation of a first maximum horizontal working distance for a first angular range and a representation of a second maximum horizontal working distance for a second angular range, wherein the representation of the first maximum horizontal working distance includes a first cylindrical section extending through the first angular range and having a first radius which corresponds to the first maximum horizontal working distance, and the representation of the second maximum horizontal working distance includes a second cylindrical section extending through the second angular range and having a second radius which corresponds to the second maximum horizontal working distance, wherein the three-dimensional model is displayed on the display. 16. The crane control system of claim 15 , wherein the representation of the crane boom is a line segment. 17. The crane control system of claim 15 , wherein the memory further stores data representing a proximity vector between the crane boom and the maximum horizontal working distance and the three-dimensional model comprises a representation of the proximity vector based on the data represen
Position indicators for suspended loads or for crane elements · CPC title
Automatic control of crane drives for producing a single or repeated working cycle; Program control · CPC title
electrical · CPC title
electrical · CPC title
electrical · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.