Adaptive sync control in radar level sensors

US10634542B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10634542-B2
Application numberUS-201715592331-A
CountryUS
Kind codeB2
Filing dateMay 11, 2017
Priority dateJun 22, 2016
Publication dateApr 28, 2020
Grant dateApr 28, 2020

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method includes generating first and second timing signals for a level sensor, where the timing signals have a timing difference. The method also includes determining whether the level sensor is able to generate the timing signals so that the timing difference obtains a target value while a control value in a control loop of the level sensor is within defined margins. The method further includes, in response to determining that the level sensor is not able to generate the timing signals so that the timing difference obtains the target value while the control value is within the defined margins, modifying the target value. In addition, the method includes determining whether the level sensor is able to generate the timing signals so that the timing difference obtains the modified target value while the control value is within the defined margins.

First claim

Opening claim text (preview).

What is claimed is: 1. A method comprising: generating first and second timing signals for a level sensor, the timing signals having a timing difference; determining whether the level sensor is able to generate the timing signals so that the timing difference obtains a target value while a control value in a control loop of the level sensor is within defined margins, wherein the level sensor conducts an operation when the target value is reached; in response to determining that the level sensor is not able to generate the timing signals so that the timing difference obtains the target value while the control value is within the defined margins, modifying the target value, wherein the modifying the target value comprises: decreasing the target value if the target value cannot be reached because the control value has reached an upper margin, increasing the target value if the target value cannot be reached because the control value has reached a lower margin; and determining whether the level sensor is able to generate the timing signals so that the timing difference obtains the modified target value while the control value is within the defined margins, wherein the level sensor conducts operation based on the modified target value is reached. 2. The method of claim 1 , further comprising: in response to modifying the target value, modifying a level calculation algorithm to account for an achieved timing difference. 3. The method of claim 1 , wherein: the first timing signal is used by the level sensor to generate a signal containing pulses that is transmitted towards material in a tank; and the second timing signal is used by the level sensor to sample a signal containing reflected pulses that is received from the tank. 4. The method of claim 1 , wherein the control value in the control loop comprises a frequency control value used to control at least one of first and second signal generators that generate the first and second timing signals, respectively. 5. The method of claim 1 , wherein: the timing difference comprises a frequency difference between the first and second timing signals; and the method further comprises generating a sync signal identifying the frequency difference between the first and second timing signals. 6. The method of claim 1 , wherein the determining, modifying, and determining operations occur prior to each measurement of the level sensor. 7. An apparatus comprising: a controller configured to control first and second signal generators of a level sensor; wherein the controller is also configured to: determine whether the signal generators are able to generate first and second timing signals so that a timing difference between the timing signals obtains a target value while a control value in a control loop of the level sensor is within defined margins, wherein the level sensor conducts an operation when the target value is reached; in response to determining that the signal generators are not able to generate the timing signals so that the timing difference obtains the target value while the control value is within the defined margins, modify the target value, wherein the modifying the target value comprises: decreasing the target value if the target value cannot be reached because the control value has reached an upper margin, increasing the target value if the target value cannot be reached because the control value has reached a lower margin; and determine whether the signal generators are able to generate the timing signals so that the timing difference obtains the modified target value while the control value is within the defined margins, the level sensor conducts operation based on the modified target value is reached. 8. The apparatus of claim 7 , wherein the controller is further configured, in response to modifying the target value, to modify a level calculation algorithm to account for an achieved timing difference. 9. The apparatus of claim 7 , wherein: the first timing signal is used by the level sensor to generate a signal containing pulses that is transmitted towards material in a tank; and the second timing signal is used by the level sensor to sample a signal containing reflected pulses that is received from the tank. 10. The apparatus of claim 7 , wherein the control value in the control loop comprises a frequency control value used to control one or more of the first and second signal generators. 11. The apparatus of claim 7 , wherein: the timing difference comprises a frequency difference between the first and second timing signals; and the controller is further configured to receive a sync signal identifying the frequency difference between the first and second timing signals. 12. The apparatus of claim 11 , wherein the controller is further configured to use the sync signal to generate measurements associated with material in a tank. 13. A system comprising: a transceiver configured to transmit signals toward material in a tank and to receive reflected signals from the material in the tank; a controller configured to generate measurements for the material in the tank based on the reflected signals; first and second signal generators configured to generate first and second timing signals for the transceiver; and a detector configured to generate a sync signal identifying a timing difference between the timing signals; wherein the controller is further configured to: use the sync signal to determine whether the signal generators are able to generate the timing signals so that the timing difference obtains a target value while a control value in a control loop is within defined margins, wherein the level sensor conducts operation an operation when the target value is reached; in response to determining that the signal generators are not able to generate the timing signals so that the timing difference obtains the target value while the control value is within the defined margins, modify the target value, wherein the modifying the target value comprises: decreasing the target value if the target value cannot be reached because the control value has reached an upper margin, increasing the target value if the target value cannot be reached because the control value has reached a lower margin; and determine whether the signal generators are able to generate the timing signals so that the timing difference obtains the modified target value while the control value is within the defined margins, the level sensor conducts operation based on the modified target value is reached. 14. The system of claim 13 , wherein the transceiver is further configured to: use the first timing signal to generate pulses in the transmitted signals; and use the second timing signal to sample the reflected signals. 15. The system of claim 13 , wherein the control value in the control loop comprises a frequency control value used to control one or more of the first and second signal generators. 16. The system of claim 13 , wherein: the timing difference comprises a frequency difference between the first and second timing signals; and the sync signal identifies the frequency difference between the first and second timing signals. 17. A non-transitory computer readable medium containing instructions that, when executed by one or more processing devices, cause the one or more processing devices to: determine whether signal generators are able to generate first and second timing signals for a level sensor so that a timing difference between the timing signals obtains a target value while a control value in a co

Assignees

Inventors

Classifications

  • G01F23/284Primary

    Electromagnetic waves · CPC title

  • of parts of a radar system · CPC title

  • Radar or analogous systems specially adapted for specific applications (electromagnetic prospecting or detecting of objects, e.g. near-field detection, G01V3/00) · CPC title

  • of transmitters · CPC title

  • using transmission of interrupted, pulse modulated waves (determination of distance by phase measurement G01S13/32) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10634542B2 cover?
A method includes generating first and second timing signals for a level sensor, where the timing signals have a timing difference. The method also includes determining whether the level sensor is able to generate the timing signals so that the timing difference obtains a target value while a control value in a control loop of the level sensor is within defined margins. The method further inclu…
Who is the assignee on this patent?
Honeywell Int Inc
What technology area does this patent fall under?
Primary CPC classification G01F23/284. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Apr 28 2020 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 9 related publications on this page (citations in our corpus or others sharing the same primary CPC).