Gas supply system and hydrogen station

US10634283B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10634283-B2
Application numberUS-201515116382-A
CountryUS
Kind codeB2
Filing dateJan 29, 2015
Priority dateFeb 21, 2014
Publication dateApr 28, 2020
Grant dateApr 28, 2020

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A gas supply system—includes a compressor unit, an accumulator unit, a pre-cooling system and a housing. In the gas supply system, the compressor unit is vertically arranged and the pre-cooling system is arranged above the accumulator unit in the housing. The compressor unit and the accumulator unit are covered by one rectangular parallelepiped housing.

First claim

Opening claim text (preview).

The invention claimed is: 1. A gas supply system which is connectable with filling equipment for filling gas into a tank-mounted apparatus, and a pre-cooling heat exchanger for cooling the gas just before being filled into the tank-mounted apparatus, the gas supply system comprising: a compressor unit including a driver and a compressor configured to compress the gas by being driven by the driver; an accumulator unit connected with the compressor unit, and including a plurality of accumulators and configured to store the gas discharged from the compressor unit, the accumulator unit being connectable with the filling equipment; a refrigerator connectable with the pre-cooling heat exchanger, and configured to provide the pre-cooling heat exchanger with a cooling medium, the refrigerator including: an evaporator configured to cool the cooling medium by evaporating a refrigerant, a refrigerant compressor configured to compress the refrigerant flowing out from the evaporator, a condenser configured to condense the refrigerant having been compressed by the refrigerant compressor by heat dissipation by the flow of air, and an expander configured to expand the refrigerant flowing out from the condenser; a gas cooler fixedly connected to the compressor of the compressor unit, and configured to perform heat exchange of the gas flowing from the compressor of the compressor unit to the plurality of accumulators with cooling fluid to thereby cool the gas, the gas cooler including a laminated body having a plurality of gas flow paths in which the gas flows, and a plurality of cooling flow paths in which the cooling fluid flows, the plurality of gas flow paths and the plurality of cooling flow paths are alternately laminated on one another, the gas cooler having a size smaller than the compressor unit; and a housing configured to house the evaporator, the refrigerant compressor, the expander, the compressor unit, the accumulator unit, and the gas cooler; the compressor being located above the driver of the compressor unit, the accumulator unit being on a side of the compressor unit in the housing, and the condenser being arranged on an outside of the housing. 2. A gas supply system according to claim 1 , wherein: the plurality of accumulators extend along a side portion of the housing having a surface perpendicularly to an arrangement direction in which the compressor unit and the accumulator unit are arranged. 3. A gas supply system according to claim 1 , further comprising a heat exhauster arranged on a top portion of the housing and configured to cool the cooling fluid by the flow of air. 4. A gas supply system according to claim 1 , wherein: the housing includes a top portion; and the condenser is arranged on the top portion of the housing. 5. A gas supply system according to claim 1 , wherein: the housing includes a top portion formed with an opening; and the compressor unit is below the opening. 6. A gas supply system according to claim 1 , wherein: the accumulator unit includes four accumulators, two of which are arranged above the other two. 7. A gas supply system according to claim 6 , wherein: two of the four accumulators are connectable with a low-pressure region of a tank in the tank-mounted apparatus, another one is connectable with a medium-pressure region and the other one is connectable with a high-pressure region when the filling equipment fills the gas into the tank-mounted apparatus. 8. A gas supply system according to claim 1 , wherein: the compressor unit and the accumulator unit are in a first portion of the housing, and the part of the refrigerator is in a second portion of the housing, the first portion is more resistive to explosion than the second portion; further comprising a control unit configured to control the compressor unit, the accumulator unit, and the refrigerator. 9. A hydrogen station, comprising: filling equipment; and a gas supply system according to claim 1 configured to supply hydrogen gas to the filling equipment, the filling equipment filling the hydrogen gas into a tank-mounted apparatus. 10. A hydrogen station according to claim 9 , wherein: the filling equipment is arranged adjacent to a side portion of the housing.

Assignees

Inventors

Classifications

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10634283B2 cover?
A gas supply system—includes a compressor unit, an accumulator unit, a pre-cooling system and a housing. In the gas supply system, the compressor unit is vertically arranged and the pre-cooling system is arranged above the accumulator unit in the housing. The compressor unit and the accumulator unit are covered by one rectangular parallelepiped housing.
Who is the assignee on this patent?
Kobe Steel Ltd
What technology area does this patent fall under?
Primary CPC classification F17C5/06. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Apr 28 2020 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).