Method for controlling storage battery system

US10566795B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10566795-B2
Application numberUS-201815901262-A
CountryUS
Kind codeB2
Filing dateFeb 21, 2018
Priority dateAug 26, 2015
Publication dateFeb 18, 2020
Grant dateFeb 18, 2020

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A storage battery system control method includes at least the following steps. Respective current SOC (state of charge) values of the large capacity storage battery system and the high power storage battery system are acquired. Electrical power, which is required to operate the frequency control service for the purpose of suppressing frequency fluctuations, to the large capacity storage battery system and the high power storage battery system, in accordance with the respective SOC values. The respectively allocated electrical power is charged or discharged by driving the large capacity storage battery system, or alternatively, the high power storage battery system, or alternatively, the large capacity storage battery system and the high power storage battery system.

First claim

Opening claim text (preview).

What is claimed is: 1. A storage battery system control method including operation utilized in implementing a frequency control service for the purpose of suppressing frequency fluctuations in an AC electrical power system, by combining a large capacity storage battery system which is capable of storing a large amount of electrical power, and a high power storage battery system which is capable of outputting high power; wherein the operation utilized in implementing the frequency control service includes at least: an SOC acquiring step of acquiring respective current state of charge values of the large capacity storage battery system and the high power storage battery system; an electrical power allocating step of allocating electrical power, which is required to operate the frequency control service for suppressing frequency fluctuations, to the large capacity storage battery system and the high power storage battery system, in accordance with the respective SOC values acquired in the SOC acquiring step; and a storage battery driving step of charging or discharging the respectively allocated electrical power by driving the large capacity storage battery system, or alternatively, the high power storage battery system, or alternatively, the large capacity storage battery system and the high power storage battery system, and wherein: if the electrical power required to operate the frequency control service is an electrical power in a discharging direction, then in the electrical power allocating step, the electrical power in the discharging direction is preferentially allocated to the large capacity storage battery system; and if the electrical power required to operate the frequency control service is an electrical power in a charging direction, then in the electrical power allocating step, the electrical power in the charging direction is preferentially allocated to the high power storage battery system. 2. The storage battery system control method according to claim 1 , wherein, in the electrical power allocating step, the electrical power required to operate the frequency control service is divided in accordance with the respective SOC values acquired in the SOC acquiring step, and allocated to the large capacity storage battery system and the high power storage battery system. 3. The storage battery system control method according to claim 1 , wherein, if the electrical power required to operate the frequency control service is insufficient to serve as the electrical power allocated to the large capacity storage battery system, a logic is provided for increasing an allocation of the high power storage battery system in order to compensate for the insufficiency. 4. The storage battery system control method according to claim 1 , wherein: if the electrical power required to operate the frequency control service is an electrical power in a discharging direction, then in the electrical power allocating step, the electrical power in the discharging direction is allocated to the storage battery system having a higher SOC value from among the large capacity storage battery system and the high power storage battery system; and if the electrical power required to operate the frequency control service is an electrical power in a charging direction, then in the electrical power allocating step, the electrical power in the charging direction is allocated to the storage battery system having a lower SOC value from among the large capacity storage battery system and the high power storage battery system. 5. The storage battery system control method according to claim 1 , further including a depth management step of transferring stored energy of the large capacity storage battery system to the high power storage battery system, and maintaining a depth of the high power storage battery system within an appropriate range. 6. The storage battery system control method according to claim 1 , wherein a plurality of units in which the large capacity storage battery system and the high power storage battery system are combined are provided, the method further comprises a distributed control step of distributing and allocating the electrical power required to operate the frequency control service to two or more of the units, and in the electrical power allocating step of the respective units, the electrical power allocated in the distributed control step is allocated to the large capacity storage battery system and the high power storage battery system in accordance with the respective SOC values acquired in the SOC acquiring step. 7. The storage battery system control method according to claim 6 , wherein, if the electrical power required to operate the frequency control services is an electrical power in a discharging direction, the electrical power required for the frequency control is distributed and allocated to two or more units for which the SOC value of at least the large capacity storage battery system is within an appropriate range, from among the plurality of units. 8. The storage battery system control method according to claim 7 , wherein, in the distributed control step, during a period in which at least one unit from among the plurality of units performs a maintenance operation on the large capacity storage battery system, the at least one unit is excluded from being an electrical power allocation target of the electrical power required to operate the frequency control service. 9. The storage battery system control method according to claim 6 , wherein, if the electrical power required to operate the frequency control service is an electrical power in a charging direction, the electrical power required to operate the frequency control service is distributed and allocated to two or more units for which the SOC value of the high power storage battery system is low, from among the plurality of units. 10. The storage battery system control method according to claim 9 , wherein, in the distributed control step, during a period in which at least one unit from among the plurality of units performs a maintenance operation on the high power storage battery system, the at least one unit is excluded from being an electrical power allocation target of the electrical power required to operate the frequency control service. 11. The storage battery system control method according to claim 6 , wherein, as a method for realizing a total power adjustment that compensates for maintenance operation periods of the respective units, in allocating electrical power to the two or more units by the distributed control step, at least one of time during which the electrical power is allocated to the respective units and an amplification rate of the electrical power to be allocated is changed. 12. The storage battery system control method according to claim 1 , wherein a plurality of units in which the large capacity storage battery system and the high power storage battery system are combined are provided, and the method further comprises a depth management step of transferring, to a unit in which the SOC value of the large capacity storage battery system is not within an appropriate range from among the plurality of units, stored energy of the large capacity storage battery system in another of the units, to thereby maintain the SOC values of the large capacity storage battery systems of all of the units within an appropriate range. 13. A storage battery system control method including operation utilized in implementing a frequency control service for the purpose of suppressing frequency fluctuations in an AC electrical power system, by combining a large capacity storage battery system which i

Assignees

Inventors

Classifications

  • with circuits adapted for supplying loads from the battery · CPC title

  • in response to battery voltage · CPC title

  • Control of state of charge [SOC] · CPC title

  • acting upon multiple batteries simultaneously or sequentially · CPC title

  • H02J3/32Primary

    using batteries or super capacitors with converting means · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10566795B2 cover?
A storage battery system control method includes at least the following steps. Respective current SOC (state of charge) values of the large capacity storage battery system and the high power storage battery system are acquired. Electrical power, which is required to operate the frequency control service for the purpose of suppressing frequency fluctuations, to the large capacity storage battery…
Who is the assignee on this patent?
Tokyo Electric Power Co Holdings Inc, Ngk Insulators Ltd
What technology area does this patent fall under?
Primary CPC classification H02J3/32. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Feb 18 2020 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).