Production sub including a fluid flow assembly having a pair of radial burst discs
US-12163401-B2 · Dec 10, 2024 · US
US10557341B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10557341-B2 |
| Application number | US-201615358891-A |
| Country | US |
| Kind code | B2 |
| Filing date | Nov 22, 2016 |
| Priority date | Nov 22, 2016 |
| Publication date | Feb 11, 2020 |
| Grant date | Feb 11, 2020 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method may include preparing a map of cement quality for one or more intervals of a wellbore; determining anticipated regions of fluid communication and anticipated regions of zonal isolation from the map of cement quality; and designing a stimulating treatment based on the presence of regions of fluid communication.
Opening claim text (preview).
What is claimed is: 1. A method comprising: preparing a map of cement quality for one or more intervals of a wellbore; determining anticipated regions of fluid communication and anticipated regions of zonal isolation from the map of cement quality; designing a stimulating treatment based on the presence of regions of fluid communication based on the map of cement quality created from one or more cement logs, wherein the designing the stimulating treatment comprises using diversion techniques at anticipated regions of fluid communication; and performing the stimulation treatment. 2. The method of claim 1 , further comprising: characterizing a cementing job within one or more intervals in a wellbore. 3. The method of claim 1 , wherein the designed stimulating treatment places stimulation stages at anticipated regions of zonal isolation. 4. The method of claim 1 , wherein the designed stimulating treatment avoids placing stimulation stages at anticipated regions of fluid communication. 5. The method of claim 1 , wherein the one or more cement logs are selected from a group consisting of cement bonding logs, variable cement density logs, and ultrasonic cement logs. 6. The method of claim 1 , wherein preparing the map of cement quality comprises simulating mud displacement. 7. The method of claim 1 , further comprising: importing the map of cement quality into a software configured to design stimulating operations. 8. The method of claim 1 , wherein the map of cement quality is based on presence or absence of hydraulic isolation, reservoir quality, or completion quality. 9. A method, comprising: preparing a map of cement quality for one or more intervals of a wellbore; comparing the map of cement quality to a map of completion quality and a map of reservoir quality; designing a stimulating treatment based on the maps of cement quality, completion quality, and reservoir quality; and performing the stimulation treatment. 10. The method of claim 9 , wherein the designed stimulating treatment comprises stimulation stages placed at regions of having at least two of good cement quality, good completion quality and good reservoir quality. 11. The method of claim 9 , wherein the designed stimulating treatment comprises stimulation stages placed at regions having good reservoir quality and poor cement quality with the use of diversion techniques where there is poor cement quality. 12. The method of claim 9 , wherein the map of cement quality comprises a simulated map based on cement displacement. 13. The method of claim 9 , wherein the map of cement quality comprises one or more cement logs selected from a group consisting of cement bonding logs, variable cement density logs, and ultrasonic cement logs.
for cementing casings into boreholes · CPC title
Monitoring or checking of cementation quality or level · CPC title
Design optimisation, verification or simulation (optimisation, verification or simulation of circuit designs G06F30/30) · CPC title
Methods for stimulating production {(by vibrating earth formations E21B43/003)} · CPC title
Fixed Constructions · mapped topic
Related publications grouped by family.
Answers are generated from the same data shown on this page.