Tiling production of packaging materials

US10521741B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10521741-B2
Application numberUS-201414761081-A
CountryUS
Kind codeB2
Filing dateJan 17, 2014
Priority dateJan 18, 2013
Publication dateDec 31, 2019
Grant dateDec 31, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Embodiments described herein generally relate to dynamically assigning product groups to production machines using production groups and producing product groups at a specified ratio using production groups. In one scenario, a computer system dynamically assigns a production entity to a product group based on properties for that production entity. The production entity is to be produced using a production machine. The computer system then dynamically assigns each product group to a production group, where each production group includes production machines that are available to produce production entities for product groups that belong to the assigned production group. The computer system also indicates that a production entity is to be produced using the production machines in the dynamically assigned production group.

First claim

Opening claim text (preview).

We claim: 1. A computer system for controlling production machines comprising the following: one or more processors; system memory; one or more network interface cards integrated within one or more production machines; one or more computer-readable storage media having stored thereon computer-executable instructions that, when executed by the one or more processors, causes the computing system to: dynamically assign, at the computer system, at least one production entity to a first product group based on one or more properties for that production entity, wherein a production entity includes a type of packaging, and wherein the production entity is to be produced using a production machine; dynamically assign, at the computer system, the first product group and a second product group to a particular production group, the dynamic assignment causing production instructions to be communicated through a network communication to the one or more network interface cards, the particular production group including any of a plurality of production machines that are available to produce production entities for product groups that belong to the particular production group, wherein at least one production entity is assigned to more than one production group; indicate, within the production instructions, that the first product group is to be produced at a particular mix level with respect to the second product group, wherein the particular mix level for the production group specifies a specified ratio at which production entities in the first production group are to be produced with respect to production entities in the second production group by the plurality of production machines of the particular production group; receive from a first network interface card associated with a first production machine a measured ratio that indicates that the first production machine in the first product group and a second production machine in the first product group are no longer producing production entities at the specified ratio; in response to detecting the measured ratio, communicate to the first network interface card an assignment comprising a new product group to be produced by the first production machine at the specified ratio; communicate to the first network interface card an assignment comprising a specified production number to the first production machine with respect to the new product group; and realign the specified ratio with respect to new production group based upon the specified production number. 2. The computer system of claim 1 , wherein the computer-executable instructions further comprise instructions that, when executed by the one or more processors, causes the computing system to: determine that the first production machine has finished producing a first specified product group at the specified ratio; and initiate production at the first production machine of the second product group starting at a ratio indicated in the second product group's corresponding production group. 3. The computer system of claim 2 , wherein upon determining that the first production machine has finished producing the product entities of the first product group, a new product group is dynamically generated, the dynamically generated product group including production entities with one or more specified production entity properties. 4. The computer system of claim 3 , wherein the dynamically generated product group is produced at the specified ratio. 5. The computer system of claim 1 , wherein one or more production entity properties are given priority such that production entities that include the prioritized production entity properties are produced at the exclusion of production entities that do not include the prioritized production entity properties, and wherein prioritized production entities belonging to multiple product groups are produced with the specified mix level and wherein production entities that are not prioritized are skipped. 6. The computer system of claim 2 , wherein upon determining that the first production machine has finished producing the production entities of the first product group, performing an act of skipping production for the first product group. 7. The computer system of claim 6 , wherein the first product group that was skipped is still counted in the specified ratio. 8. The computer system of claim 1 , wherein the computer-executable instructions further comprise instructions that, when executed by the one or more processors, causes the computing system to: determine that the first production machine has run out of material that is suited for producing a first product group at the specified ratio; and initiate production at the second production machine at the specified ratio. 9. The computer system of claim 1 , wherein the specified ratio is dynamically changeable during production entity production at at least one production machine. 10. A computer-implemented method for controlling production machines comprising: dynamically assigning, at a computer system at least one production entity to a first product group based on one or more properties for that production entity, wherein the production entity is to be produced using a production machine; dynamically assigning, at the computer system, the first product group and a second product group to a particular production group, the dynamic assignment causing production instructions to be communicated through a network communication to the one or more network interface cards, the particular production group including any of a plurality of production machines that are available to produce production entities for product groups that belong to the particular production group, wherein the at least one production entity is assigned to more than one production group; and indicating, within the production instructions, that the first production group is to be produced at a particular mix level with respect to the second product group, wherein the particular mix level for the production group specifies a specified ratio at which production entities in the first production group are to be produced with respect to production entities in the second production group by the plurality of production machines of the particular production group; receiving from a first network interface card associated with a first production machine a measured ratio that indicates that the first production machine in the first product group and a second production machine in the first product group are no longer producing production entities at the specified ratio; in response to detecting the measured ratio, communicating to the first network interface card an assignment comprising a new product group to be produced by the first production machine at the specified ratio; communicating to the first network interface card an assignment comprising a specified production number to the first production machine with respect to the new product group; and realigning the specified ratio with respect to new production group based upon the specified production number. 11. The computer-implemented method of claim 10 , further comprising: determining that the second production machine within the particular production group is better equipped to produce a specified product group based on the properties of production entities assigned to the specified product group; and indicating that the production entities for the specified product group are to be produced at the second production machine. 12. The computer-implemented method of claim 11 , further comprising: determining that the particular mix level is no longer being met for the specifi

Assignees

Inventors

Classifications

  • Minimising material used in manufacturing processes · CPC title

  • Manufacturing · CPC title

  • Computing systems specially adapted for manufacturing · CPC title

  • Resource planning, allocation, distributing or scheduling for enterprises or organisations · CPC title

  • G16Z99/00Primary

    Subject matter not provided for in other main groups of this subclass · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10521741B2 cover?
Embodiments described herein generally relate to dynamically assigning product groups to production machines using production groups and producing product groups at a specified ratio using production groups. In one scenario, a computer system dynamically assigns a production entity to a product group based on properties for that production entity. The production entity is to be produced using a…
Who is the assignee on this patent?
Packsize Llc
What technology area does this patent fall under?
Primary CPC classification G06Q10/0631. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Dec 31 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 3 related publications on this page (citations in our corpus or others sharing the same primary CPC).