Prioritized deployment of database artifacts

US10521310B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10521310-B2
Application numberUS-201615221998-A
CountryUS
Kind codeB2
Filing dateJul 28, 2016
Priority dateMay 9, 2016
Publication dateDec 31, 2019
Grant dateDec 31, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Systems and techniques for ordering deployment of artifacts to a database include collecting predecessor node information for nodes in a dependency graph. The dependency graph includes available edges connecting the nodes of the dependency graph, where each node in the dependency graph represents at least one artifact. A data structure contained within each of the nodes is populated with the predecessor node information. Successor node information is determined using the predecessor node information and an updated dependency graph is created by adding additional edges to the dependency graph using the predecessor node information in the data structure within each of the nodes and the successor node information. The artifacts are ordered for deployment to the database using the updated dependency graph.

First claim

Opening claim text (preview).

What is claimed is: 1. A computer-implemented method for ordering deployment of artifacts to a database, the method comprising: identifying a dependency graph, wherein the dependency graph comprises available edges connecting nodes of the dependency graph, wherein each node in the dependency graph represents at least one artifact, wherein each edge connecting the nodes represents a dependency between nodes; collecting predecessor node information for nodes that meet a predetermined criterion in the dependency graph; populating, in each particular node that meets the predetermined criterion, a data structure that is stored within each of the nodes of the dependency graph, wherein the data structure is populated with data identifying a predecessor node corresponding to the particular node; determining successor node information using the predecessor node information, wherein a successor node is a node that is dependent on the predecessor node and does not contain the data identifying the predecessor node; creating an updated dependency graph by adding additional edges to the dependency graph using the predecessor node information in the data structure within each of the particular nodes and the determined successor node information, wherein the additional edges are drawn from each particular node populated with the predecessor node information to successor nodes of the particular node's predecessor node; and ordering deployment of the artifacts to the database using the updated dependency graph. 2. The method as in claim 1 , further comprising deploying the ordered artifacts to the database. 3. The method as in claim 1 , wherein the data structure populated with the predecessor node information uniquely identifies the predecessor node in the dependency graph. 4. The method as in claim 1 , wherein the predetermined criterion includes a type of artifact represented by a node. 5. The method as in claim 1 , wherein the data structure within a node is empty if there is no predecessor node information related to the node. 6. The method as in claim 1 , wherein ordering deployment of the artifacts comprises using a backward edge count including the available edges and the additional edges in the updated dependency graph to order deployment of the artifacts. 7. The method as in claim 1 , wherein the predecessor node information and the additional edges are used to prioritize deployment of one node over other equally ranked nodes. 8. The method as in claim 1 , further comprising: prior to creating the updated dependency graph, determining whether any of the additional edges will duplicate any of the available edges; and not adding any additional edge to the dependency graph if the additional edge duplicates any of the available edges. 9. A computer program product for ordering deployment of artifacts to a database, the computer program product being tangibly embodied on a non-transitory computer-readable storage medium and comprising instructions that, when executed, are configured to cause at least one computing device to: identify a dependency graph, wherein the dependency graph comprises available edges connecting nodes of the dependency graph, wherein each node in the dependency graph represents at least one artifact, wherein each edge connecting the nodes represents a dependency between nodes; collect predecessor node information for nodes that meet a predetermined criterion in the dependency graph; populate, in each particular node that meets the predetermined criterion, a data structure that is stored within each of the nodes of the dependency graph, wherein the data structure is populated with data identifying a predecessor node corresponding to the particular node; determine successor node information using the predecessor node information, wherein a successor node is a node that is dependent on the predecessor node and does not contain the data identifying the predecessor node; prioritize deployment of one node over equally ranked nodes by drawing additional edges in the dependency graph to update the dependency graph using the predecessor node information, wherein the additional edges are drawn from a current node populated with the predecessor node information to successor nodes of the predecessor node; at a time of drawing the additional edges, exclude drawing an additional edge from the current node populated with predecessor node information to any successor node of the predecessor node where an available edge currently connects the current node to the successor node; and order deployment of the artifacts to the database using the updated dependency graph. 10. The computer program product of claim 9 , further comprising instructions that, when executed, are configured to cause at least one computing device to deploy the ordered artifacts to the database. 11. The computer program product of claim 9 , wherein the data structure populated with the predecessor node information uniquely identifies the predecessor node in the dependency graph. 12. The computer program product of claim 9 , wherein the instructions that, when executed, are configured to cause at least one computing device to order deployment of the artifacts comprises instructions that, when executed, are configured to cause the at least one computing device to use a backward edge count including the available edges and the additional edges in the updated dependency graph to order deployment of the artifacts. 13. A system for ordering deployment of artifacts to a database, the system comprising: at least one memory including instructions on a computing device; and at least one processor on the computing device, wherein the processor is operably coupled to the at least one memory and is arranged and configured to execute the instructions that, when executed, cause the processor to implement: a dependency engine capable of: identifying a dependency graph, wherein the dependency graph comprises available edges connecting nodes of the dependency graph, wherein each node in the dependency graph represents at least one artifact, wherein each edge connecting the nodes represents a dependency between nodes; collecting predecessor node information for nodes that meet a predetermined criterion in the dependency graph, populating a data structure that is stored within each of the nodes of the dependency graph, wherein the data structure stored within a particular node contains data identifying a predecessor node corresponding to the particular node, and determining successor node information using the predecessor node information, wherein a successor node is a node that is dependent on the predecessor node and does not contain the data identifying the predecessor node; an artifact conversion engine capable of creating an updated dependency graph by adding additional edges to the dependency graph using the predecessor node information in the data structure within each of the particular nodes and the determined successor node information, wherein the additional edges are drawn from each particular node populated with the predecessor node information to successor nodes of the particular node's predecessor node; and a deployment engine capable of ordering deployment of the artifacts to the database using the updated dependency graph. 14. The system of claim 13 , wherein the deployment engine is capable of deploying the ordered artifacts to the database. 15. The system of claim 13 , wherein the data structure populated with the predecessor node information uniquely identifies the predecessor node in the dependency graph. 16. The

Assignees

Inventors

Classifications

  • involving logging of persistent data for recovery · CPC title

  • Database-specific techniques · CPC title

  • G06F16/21Primary

    Design, administration or maintenance of databases · CPC title

  • Management of the backup or restore process · CPC title

  • Physics · mapped topic

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10521310B2 cover?
Systems and techniques for ordering deployment of artifacts to a database include collecting predecessor node information for nodes in a dependency graph. The dependency graph includes available edges connecting the nodes of the dependency graph, where each node in the dependency graph represents at least one artifact. A data structure contained within each of the nodes is populated with the pr…
Who is the assignee on this patent?
Sap Se
What technology area does this patent fall under?
Primary CPC classification G06F16/21. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Dec 31 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).