Control system for construction machinery and control method for construction machinery

US10519628B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10519628-B2
Application numberUS-201715723360-A
CountryUS
Kind codeB2
Filing dateOct 3, 2017
Priority dateOct 4, 2016
Publication dateDec 31, 2019
Grant dateDec 31, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A control system for construction machinery includes a first hydraulic pump, first and second actuators connected to the first hydraulic pump through first and second hydraulic lines respectively, first and second control valves installed in the first and second hydraulic lines respectively and configured to control operations of the first and second actuators, and a controller configured to adjust a spool displacement amount of the first control valve according to an amount of working oil to be supplied to the first actuator when the first actuator performs a single or multiple operation by self-load.

First claim

Opening claim text (preview).

What is claimed is: 1. A control system for construction machinery, the control system comprising: a first hydraulic pump; first and second actuators connected to the first hydraulic pump through first and second hydraulic lines respectively and operable by a working oil discharged from the first hydraulic pump; first and second control valves installed in the first and second hydraulic lines respectively and configured to control operations of the first and second actuators; first spool displacement adjusting valves supplying a pilot signal pressure to a spool of the first control valve in proportion to an inputted control signal to control a displacement amount of the spool of the first control valve; and a controller configured to output the control signal to the first spool displacement adjusting valves corresponding to a manipulation signal of an operator, and configured to adjust a spool displacement amount of the first control valve according to an amount of the working oil to be supplied to the first actuator when the first actuator performs a single or multiple operation by self-load, wherein the first actuator includes an arm cylinder and the second actuator includes a boom cylinder, wherein the controller is configured to adjust the spool displacement amount of the first control valve such that a first amount of the working oil is supplied to the arm cylinder through the first control valve when only an arm joystick is manipulated such that the arm cylinder performs an arm crowd operation in a direction of weight of an arm, wherein the controller is configured to adjust the spool displacement amount of the first control valve such that a second amount of the working oil less than the first amount of the working oil is supplied to the arm cylinder through the first control valve when the arm joystick and a boom joystick are manipulated at the same time such that the arm cylinder performs the arm crowd operation in the direction of weight of the arm and the boom cylinder performs a boom up operation, wherein when the arm joystick is manipulated such that the arm cylinder performs the arm crowd operation, the spool displacement amount of the first control valve is adjusted to have a first maximum allowable amount with respect to an arm joystick displacement amount, and wherein when the arm joystick and the boom joystick are manipulated at the same time such that the arm cylinder performs the arm crowd operation and the boom cylinder performs the boom up operation, the spool displacement amount of the first control valve is adjusted to have a second maximum allowable amount with respect to the arm joystick displacement amount which is less than the first maximum allowable amount. 2. The control system for construction machinery of claim 1 , wherein the controller outputs the control signal to the first spool displacement adjusting valves to perform a meter-out opening area control of the first control valve. 3. The control system for construction machinery of claim 1 , wherein the first control valve is controlled to have a first orifice area during the single operation of the first actuator, and the first control valve is controlled to have a second orifice area smaller than the first orifice area during the multiple operation of the first actuator. 4. The control system for construction machinery of claim 1 , wherein the controller comprises: a calculator configured to calculate the amount of the working oil to be supplied to the first actuator based on an inputted joystick displacement amount for the first and second actuators and state values in a hydraulic system; a joystick displacement converter configured to convert the inputted joystick displacement amount for the first actuator into a secondary joystick displacement amount corresponding to the calculated working oil amount; and an output portion configured to output the control signal for controlling the pilot signal pressure in proportion to the secondary joystick displacement amount. 5. The control system for construction machinery of claim 1 , further comprising: a second hydraulic pump configured to supply a working oil to the first and second actuators through third and fourth hydraulic lines; and third and fourth control valves installed in the third and fourth hydraulic lines and configured to control operations of the first and second actuators according to a displacement amount of each of spools therein. 6. A control method for construction machinery, the method comprising: providing a hydraulic system including first and second actuators connected to the first hydraulic pump through first and second hydraulic lines respectively, and first and second control valves installed in the first and second hydraulic lines respectively and configured to control operations of the first and second actuators; determining whether a single or multiple operation by self-load of the first actuator is to be performed; calculating an amount of a working oil to be supplied to the first actuator based on the operation of the first actuator; and adjusting a spool displacement amount of the first control valve according to the calculated amount of the working oil, wherein the first actuator includes an arm cylinder and the second actuator includes a boom cylinder, wherein adjusting the spool displacement amount of the first control valve comprises: adjusting the spool displacement amount of the first control valve such that a first amount of the working oil is supplied to the arm cylinder through the first control valve when only an arm joystick is manipulated such that the arm cylinder performs an arm crowd operation in a direction of weight of an arm; and adjusting the spool displacement amount of the first control valve such that a second amount of the working oil less than the first amount of the working oil is supplied to the arm cylinder through the first control valve when the arm joystick and a boom joystick are manipulated at the same time such that the arm cylinder performs the arm crowd operation in the direction of weight of the arm and the boom cylinder performs a boom up operation, wherein when the arm joystick is manipulated such that the arm cylinder performs the arm crowd operation, the spool displacement amount of the first control valve is adjusted to have a first maximum allowable amount with respect to an arm joystick displacement amount, and wherein when the arm joystick and the boom joystick are manipulated at the same time such that the arm cylinder performs the arm crowd operation and the boom cylinder performs the boom up operation, the spool displacement amount of the first control valve is adjusted to have a second maximum allowable amount with respect to the arm joystick displacement amount which is less than the first maximum allowable amount. 7. The method of claim 6 , wherein adjusting the spool displacement amount of the first control valve comprises performing a meter-out opening area control of the first control valve in proportion to the calculated amount of the working oil. 8. The method of claim 6 , wherein calculating the amount of the working oil to be supplied to the first actuator comprises: calculating the first amount of the working oil to be supplied to the first actuator during the single operation of the first actuator; and calculating the second amount of the working oil to be supplied to the first actuator during the multiple operation of the first actuator. 9. The method of claim 8 , wherein adjusting the spool displacement amount of the first control valve comprises: controlling the first control valve to have a first orifice area during the single operation of the first actuator; and controlling the firs

Assignees

Inventors

Classifications

  • Linear output members · CPC title

  • Flow rate control · CPC title

  • for use with two or more servomotors · CPC title

  • Directional control combined with flow control · CPC title

  • representing a state of input means, e.g. joystick position · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10519628B2 cover?
A control system for construction machinery includes a first hydraulic pump, first and second actuators connected to the first hydraulic pump through first and second hydraulic lines respectively, first and second control valves installed in the first and second hydraulic lines respectively and configured to control operations of the first and second actuators, and a controller configured to ad…
Who is the assignee on this patent?
Doosan Infracore Co Ltd
What technology area does this patent fall under?
Primary CPC classification F15B11/17. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Dec 31 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).