Head Mountable Display System
US-2015199847-A1 · Jul 16, 2015 · US
US10503249B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10503249-B2 |
| Application number | US-201514789493-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jul 1, 2015 |
| Priority date | Jul 3, 2014 |
| Publication date | Dec 10, 2019 |
| Grant date | Dec 10, 2019 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A system for displaying information to an operator of a machine comprises a head tracking system and a projection system. One system for displaying information uses a projection system and a see-through display to present two-dimensional images to an operator. One system uses a projection system and a see-through display to present three-dimensional images to an operator. One system uses a pair of smart glasses to display information to a user based a direction a user is looking.
Opening claim text (preview).
The invention claimed is: 1. A method comprising: determining a head position of a user with respect to a windshield of a construction machine; determining a direction of a gaze of the user based on the head position of the user with respect to the windshield; generating a representation of a construction site based on data received at a first time from sensors located on a construction machine; determining a difference between the representation of the construction site and a desired site plan; determining an operation to be performed based on the difference, the operation comprising movement of an implement of the construction machine based on a current position of the implement and a desired position of the implement; determining an image to be displayed to the user based on the head position of the user with respect to the windshield, the direction of the gaze of the user, the representation of the construction site, the desired site plan, and the operation to be performed, the image comprising an excavation area overlay, a volume overlay, and a completion overlay; displaying the image to the user; determining that the construction site has changed; updating the representation of the construction site in response to the determining that the construction site has changed, the updating based on data received at a second time from the sensors located on the construction machine to generate an updated representation; determining an updated image to be displayed to the user based on the direction of the user's gaze, the updated representation of the construction site, the desired site plan, and an additional operation to be performed based on a difference between the updated representation and the desired site plan; and displaying the updated image to the user. 2. The method of claim 1 , wherein the direction of the gaze of the user is determined further based on a position of the user's eyes and a direction the user's eyes are looking. 3. The method of claim 1 , the determining the image to be displayed to the user comprising: determining a difference between the representation of the construction site and a desired site plan; and generating a value pertaining to a percent of completion of the construction site based on the determining the difference between the representation of the construction site and the desired site plan, wherein the image comprises the percent of completion of the construction site. 4. The method of claim 1 , further comprising: determining that the direction of the gaze of the user has changed; determining a new image to be displayed to the user based on the determining that the direction of the gaze of the user has changed; and displaying the new image to the user. 5. The method of claim 1 , wherein the displaying the image to the user comprises: transmitting the image to be displayed to the user to a projection system. 6. The method of claim 1 , wherein the image displayed to the user comprises an overlay pertaining to the current position of the implement and the desired position of the implement. 7. An apparatus comprising: a processor; and a memory to store computer program instructions, the computer program instructions when executed on the processor, cause the processor to perform operations comprising: determining a head position of a user with respect to a windshield of a construction machine; determining a direction of a gaze of the user based on the head position of the user with respect to the windshield; generating a representation of a construction site based on data received at a first time from sensors located on a construction machine; determining a difference between the representation of the construction site and a desired site plan; determining an operation to be performed based on the difference, the operation comprising movement of an implement of the construction machine based on a current position of the implement and a desired position of the implement; determining an image to be displayed to the user based on the head position of the user with respect to the windshield, the direction of the gaze of the user, the representation of the construction site, the desired site plan, and the operation to be performed, the image comprising an excavation area overlay, a volume overlay, and a completion overlay; displaying the image to the user; determining that the construction site has changed; updating the representation of the construction site in response to the determining that the construction site has changed, the updating based on data received at a second time from the sensors located on the construction machine to generate an updated representation; determining an updated image to be displayed to the user based on the direction of the user's gaze, the updated representation of the construction site, the desired site plan, and an additional operation to be performed based on a difference between the updated representation and the desired site plan; and displaying the updated image to the user. 8. The apparatus of claim 7 , wherein the direction of the gaze of the user is determined further based on a position of the user's eyes and a direction the user's eyes are looking. 9. The apparatus of claim 7 , the determining the image to be displayed to the user comprising: determining a difference between the representation of the construction site and a desired site plan; and generating a value pertaining to a percent of completion of the construction site based on the determining the difference between the representation of the construction site and the desired site plan, wherein the image comprises the percent of completion of the construction site. 10. The apparatus of claim 7 , the operations further comprising: determining that the direction of the a gaze of the user has changed; determining a new image to be displayed to the user based on the determining that the direction of the gaze of the user has changed; and displaying the new image to the user. 11. The apparatus of claim 7 , wherein the image displayed to the user comprises an overlay pertaining to the current position of the implement and the desired position of the implement. 12. A non-transitory computer readable medium storing computer program instructions, which, when executed on a processor, cause the processor to perform operations comprising: determining a head position of a user with respect to a windshield of a construction machine; determining a direction of a gaze of the user based on the head position of the user with respect to the windshield; generating a representation of a construction site based on data received at a first time from sensors located on a construction machine; determining a difference between the representation of the construction site and a desired site plan; determining an operation to be performed based on the difference, the operation comprising movement of an implement of the construction machine based on a current position of the implement and a desired position of the implement; determining an image to be displayed to the user based on the head position of the user with respect to the windshield, the direction of the gaze of the user, the representation of the construction site, the desired site plan, and the operation to be performed, the image comprising an excavation area overlay, a volume overlay, and a completion overlay; displaying the image to the user; determining that the construction site has changed; updating the representation of the construction site in response to the determining that the construction site has changed, the updating based on data received a
Projection devices for colour picture display {, e.g. using electronic spatial light modulators [ESLM]} · CPC title
Eye tracking input arrangements (G06F3/015 takes precedence) · CPC title
Status monitoring or status determination for a person or group · CPC title
Head mounted · CPC title
Construction · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.