Method for controlling a process plant using a redundant local supervisory controller

US10503155B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10503155-B2
Application numberUS-201515321188-A
CountryUS
Kind codeB2
Filing dateJun 25, 2015
Priority dateJun 26, 2014
Publication dateDec 10, 2019
Grant dateDec 10, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The present invention discloses a method for controlling a process using a plurality of regulatory controllers ( 160 ) connected to a remote supervisory controller ( 120 ) over a communication link ( 155 ) and to a local supervisory controller ( 130 ) over a process bus ( 170 ). The remote supervisory controller ( 120 ) controls the regulatory controllers ( 160 ) over the communication link ( 155 ) with the use of a remote process model. During operation of the plant a local process model is configured in the local supervisory controller ( 130 ) with control data send on the communication link ( 155 ). Upon failure of the communication link ( 155 ) the local supervisory controller ( 130 ) takes over the control through the process bus ( 170 ), acting as a redundant or a backup controller. The method comprises: monitoring transmission of control data between the remote supervisory controller ( 120 ) and the plurality of controllers ( 160 ) over the communication link ( 155 ); determining functional correlations between measured process variables and control process variables, based on the control data and a predetermined correlation function; configuring local process model based on the determined functional correlations; and providing intermediate set points using the configured local process model, upon an intermediate failure of the communication link ( 155 ), where the communication link recovers from the intermediate failure within a predetermined time period.

First claim

Opening claim text (preview).

What is claimed is: 1. A method for controlling a process with a plurality of field devices in a process plant using a plurality of regulatory controllers, wherein the plurality of regulatory controllers are connected to a remote supervisory controller over a communication link and to a local supervisory controller over a process bus for receiving set points, the method comprising: monitoring transmission of control data between the remote supervisory controller and the plurality of regulatory controllers over the communication link, wherein the control data includes (i) information associated with one or more measured process variables and (ii) one or more set points in relation to one or more control process variables generated using a remote process model based on the information associated with the one or more measured process variables; determining one or more functional correlations between the one or more measured process variables and the one or more control process variables, based on the control data and a predetermined correlation function for configuring a local process model of the local supervisory controller; configuring the local process model based on the determined one or more functional correlations; and providing one or more intermediate set points in relation to the one or more control process variables using the configured local process model, to the plurality of controllers for regulating the one or more field devices, upon an intermediate failure of the communication link, wherein the communication link recovers from the intermediate failure within a predetermined time period. 2. The method as claimed in claim 1 , wherein the plurality of regulatory controllers includes one or more proportional integrative derivative (PID) controllers. 3. The method as claimed in claim 1 , wherein the predetermined correlation function is set in the remote supervisory controller. 4. A system for controlling a process using a plurality of field devices in a process plant, the system comprising: a plurality of regulatory controllers for regulating the plurality of field devices of the process plant, wherein the plurality of the regulatory controllers are connected to a process bus of a control network in the process plant; a remote supervisory controller connected to the plurality of regulatory controllers via a communication link for receiving information associated with one or more measured process variables, and for generating and transmitting one or more set points in relation to one or more control process variables, using a remote process model based on the information associated with the one or more measured process variables; and a local supervisory controller configured to provide one or more intermediate set points in relation to the one or more control process variables using a local process model, to the plurality of controllers for regulating the one or more field devices, upon an intermediate failure of the communication link from which the communication link recovers within a predetermined time period; and a configuration server connected to the remote supervisory controller and configured to (i) monitor transmission of the information associated with one or more measured process variables and the one or more set points in relation to one or more control process variables; (ii) determine one or more functional correlations between the one or more measured process variables and the one or more control process variables based on a predetermined correlation function; and (iii) configure the local process model based on the determined one or more functional correlations. 5. The system as claimed in claim 4 , wherein the plurality of regulatory controllers includes one or more proportional integrative derivative (PID) controllers. 6. The system as claimed in claim 4 , wherein the predetermined correlation function is set in the remote supervisory controller.

Assignees

Inventors

Classifications

  • G05B9/03Primary

    with multiple-channel loop, i.e. redundant control systems · CPC title

  • Safety, monitoring · CPC title

  • electric · CPC title

  • Redundancy · CPC title

  • characterised by fault tolerance, reliability of production system · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10503155B2 cover?
The present invention discloses a method for controlling a process using a plurality of regulatory controllers ( 160 ) connected to a remote supervisory controller ( 120 ) over a communication link ( 155 ) and to a local supervisory controller ( 130 ) over a process bus ( 170 ). The remote supervisory controller ( 120 ) controls the regulatory controllers ( 160 ) over the communication link ( 1…
Who is the assignee on this patent?
Abb Schweiz Ag
What technology area does this patent fall under?
Primary CPC classification G05B9/03. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Dec 10 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).