A method of manufacturing pseudo-conjugated precast concrete segments
US-2021277682-A1 · Sep 9, 2021 · US
US10494830B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10494830-B2 |
| Application number | US-201415522579-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 31, 2014 |
| Priority date | Oct 31, 2014 |
| Publication date | Dec 3, 2019 |
| Grant date | Dec 3, 2019 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The invention has for object a method for manufacturing concrete construction blocks ( 6 ) for a wind-generator tower made up of at least two consecutive blocks secured to one another by a contact surface of each of the two blocks, the manufacturing method comprising the following steps: pouring concrete into a first cage of reinforcements ( 10 - 1 ) so as to obtain the first concrete construction block comprising a first contact surface ( 9 ), and pouring concrete into a second cage of reinforcements ( 10 - 2 ) so as to obtain the second concrete construction block, the second cage of reinforcements being provided in a form ( 21 ) arranged such that the first contact surface ( 9 ) of the first block ( 6 - 1 ) makes up a wall for delimiting ( 26 ) the pouring of the concrete such as to form a contact surface ( 9 ) of the second block ( 6 - 2 ).
Opening claim text (preview).
The invention claimed is: 1. A method of manufacturing concrete construction blocks for a wind-generator tower comprised of at least a first block, a second block and a third block, the first block, second block, and third block being secured to one another by a contact surface of each of the first block, second block and third block, the method comprising the following consecutive steps: pouring concrete into a first cage of reinforcements so as to obtain the first block comprising a first contact surface; pouring concrete into a second cage of reinforcements so as to obtain the second block, the second cage of reinforcements being provided in a form, the first contact surface of the first block making up a wall for delimiting the pouring of the concrete to form a first contact surface of the second block, wherein a bottom surface of said form is spaced from a base of a system for manufacturing at a distance about a height of the first block in a direction orthogonal to the first contact surface; detaching the first block and the second block after moulding of the second block due to a releasing product coated on the first contact surface of the first block prior to the step of pouring of the concrete to form the second block; extracting the first block from said system for manufacturing; transporting the second block under said form; and pouring concrete into a third cage of reinforcements so as to obtain the third block, the third cage of reinforcements being provided in said form, a second contact surface of the second block making up a wall for delimiting the pouring of the concrete such as to form a first contact surface of the third block, the bottom surface of said form being spaced from the base of said system for manufacturing at a distance about a height of the second block in a direction orthogonal to the first contact surface, wherein each of the first block, second block and third block is hollow and comprises a lateral wall limited by a lower end and an upper end, said lower end forming the first contact surface of the block. 2. The method of claim 1 , wherein, during the step for pouring concrete in such a way as to obtain the second block, the first block is arranged facing the form such that the first block and the second cage of reinforcements are extensions of one another. 3. A method for assembling a wind-generator tower, comprising: a step of manufacturing at least a first block, a second block, and a third block obtained by the method of manufacturing according to claim 1 , and a step of transporting said first block, second block, and third block. 4. The method of claim 3 , further comprising: a step of lifting said first block, second block, and third block. 5. The method of claim 1 , further comprising: a step of geometric controlling of the form before the moulding of the first block, second block, third block and/or a step of controlling dimensions of each of the first block, second block, and third block.
with identical elements · CPC title
Onshore wind turbines · CPC title
Assembly methods · CPC title
on a tower · CPC title
Arrangements for mounting or supporting wind motors; Masts or towers for wind motors · CPC title