Work management system, calibration work management server, and calibration work management method
US-2024249225-A1 · Jul 25, 2024 · US
US10489732B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10489732-B2 |
| Application number | US-201214425190-A |
| Country | US |
| Kind code | B2 |
| Filing date | Sep 3, 2012 |
| Priority date | Sep 3, 2012 |
| Publication date | Nov 26, 2019 |
| Grant date | Nov 26, 2019 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A production line management system that registers and manages distribution data for each of a plurality of production lines, and thus, manages work data in a unitary manner. The management system being constructed to manage production in a plurality of the production lines with a small amount of data and to simplify a system configuration. In particular, the distribution data is created by an identifier added to work data.
Opening claim text (preview).
The invention claimed is: 1. A management system for production lines producing products, the management system comprising: component mounting machines arranged on the production lines, at least one of the production lines manufacturing a substrate; and a management computer configured to: store configuration data of the component mounting machines that configures production and work data regarding work to produce the products, create distribution data for distributing the work data to the component mounting machines based on the configuration data such that a work time of each of the component mounting machines is made equal, register and manage the distribution data for each of the production lines, distribute the work data to the component mounting machines based upon the distribution data, the work data including a mounting position of each of a plurality of components expressed by a coordinate system of the substrate and not including a mounting position of any of the plurality of components expressed by a coordinate system of the component mounting machines, and convert the mounting position of each of the plurality of components expressed by the coordinate system of the substrate included in the work data to the mounting position of each of the plurality of components expressed by the coordinate system of the component mounting machines based on a sequence of mounting each of the plurality of components, wherein each of the plurality of components is mounted at the converted mounting position of each of the plurality of components expressed by the coordinate system of the component mounting machines. 2. A management system for production lines producing products, the management system comprising: component mounting machines arranged on the production lines, at least one of the production lines manufacturing a substrate; configuration data storage means for storing configuration data of working machines configuring the production lines; work data storage means for storing work data regarding work to produce the products; distribution data creation means for creating distribution data to distribute the work data to the working machines based on the configuration data such that a work time of each of the working machines is made equal; and registration management means for registering and managing the distribution data for each production line and distributing the work data to the working machines based upon the distribution data, the work data including a mounting position of each of a plurality of components expressed by a coordinate system of the substrate and not including a mounting position of any of the plurality of components expressed by a coordinate system of the working machines, wherein the mounting position of each of the plurality of components expressed by the coordinate system of the substrate included in the work data is converted to the mounting position of each of the plurality of components expressed by the coordinate system of the component mounting machines based on a sequence of mounting each of the plurality of components, and each of the plurality of components is mounted at the converted mounting position of each of the plurality of components expressed by the coordinate system of the component mounting machines. 3. The management system according to claim 2 , wherein the work data storage means stores the work data with an identifier added thereto, and the distribution data creation means creates the distribution data using the identifier. 4. The management system according to claim 2 , further comprising: work time calculation means for obtaining a work time of each of the working machines included in the production lines based on the distributed work data; and work time display means for classifying the obtained work time of each of the working machines for each of the production lines, selecting a maximum work time among the classified work times for each of the production lines, and displaying the maximum work time on a display device. 5. The management system according to claim 2 , further comprising: data display means for displaying the configuration data, the work data, and the distribution data on a display device; and data rearrangement means for rearranging the displayed distribution data according to a command to rearrange the distribution data, the command being input from the outside based on the displayed configuration data, work data, and distribution data. 6. The management system according to claim 2 , wherein the work data storage means stores the work data with an identifier added thereto, the distribution data creation means creates the distribution data using the identifier, and the management system further includes data display means for displaying the distribution data as a series of the identifiers without the work data. 7. The management system according to claim 5 , wherein the display means displays the rearrangement of the displayed distribution data as a drag and drop on the display device based upon the command. 8. The management system according to claim 5 , wherein the display means highlights a selected identifier of the work data and a corresponding component of a product based upon the command. 9. The management system according to claim 5 , wherein the command indicates rearranging identifier IDs of the work data when a defective component mounting occurs in one of the component mounting machines. 10. The management system according to claim 7 , wherein the display means displays the drag and drop of a selected identifier of the work data on the display device based upon the command. 11. A management system for production lines producing products, the management system comprising: component mounting machines arranged on the production lines, at least one of the production lines manufacturing a substrate; and circuitry configured to: store configuration data of working machines that configure the production lines in a memory; store work data regarding work to produce the products in the memory; create distribution data to distribute the work data to the working machines based on the configuration data such that a work time of each of the working machines is made equal; register and manage the distribution data for each production line, distribute the work data to the working machines based upon the distribution data, the work data including a mounting position of each of a plurality of components expressed by a coordinate system of the substrate and not including a mounting position of any of the plurality of components expressed by a coordinate system of the working machines, and convert the mounting position of each of the plurality of components expressed by the coordinate system of the substrate included in the work data to the mounting position of each of the plurality of components expressed by the coordinate system of the component mounting machines based on a sequence of mounting each of the plurality of components, wherein each of the plurality of components is mounted at the converted mounting position of each of the plurality of components expressed by the coordinate system of the component mounting machines. 12. The management system according to claim 11 , wherein the circuitry is configured to: store the work data with an identifier added thereto, and create the distribution data using the identifier. 13. The management system according to claim 11 , wherein the circuitry is configured to: obtain a work time of each of the working machines included in the production lines based on the distributed work data, classify the obtained
Sequencing of tasks or work · CPC title
Business management, production, document, asset, regulatory management, high level · CPC title
Resource planning, allocation, distributing or scheduling for enterprises or organisations · CPC title
Data management, shop management, memory management · CPC title
characterised by CIM planning or realisation · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.