Reinforced building wall

US10480178B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10480178-B2
Application numberUS-201715843992-A
CountryUS
Kind codeB2
Filing dateDec 15, 2017
Priority dateMay 23, 2013
Publication dateNov 19, 2019
Grant dateNov 19, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A reinforced building wall comprises a foundation; an anchor rod extending from the foundation; a first stud wall disposed above the foundation, the first stud wall including a first bottom plate and a first top place; a second stud wall disposed above the first stud wall, the second stud wall including a second bottom plate and a second top plate; the first tie rod including first and second threaded end portions, the first end portion is operably connected to the anchor rod; a second tie rod including third and fourth threaded end portions, the third end portion is operably connected to the second end portion of the first tie rod; the second tie rod including an outer end portion operably attached to the second stud wall; an intermediate portion of the first tie rod is unthreaded and comprises at least about 75% of the length of the first tie rod; and an intermediate portion of the second tie rod is unthreaded and comprises at least about 75% of the length of the second tie rod.

First claim

Opening claim text (preview).

I claim: 1. A reinforced building wall, comprising: a) a first stud wall including a bottom plate and a top plate; b) a first threaded rod extending through the bottom plate, the first threaded rod having a first end operably anchored to a foundation and a second end; c) a first tie rod having a first end with a first threaded bore and a second end with a second threaded bore, the first tie rod being one piece including a solid first portion extending between the first threaded bore and the second threaded bore, the solid first portion having a length longer than a length of the first threaded bore or the second threaded bore, the solid first portion having a cross-sectional size equal to a cross-sectional size of the first end and the second end, the first threaded bore is threaded to the second end of the first threaded rod; d) a second tie rod having a third end with a third threaded bore and fourth end with a fourth threaded bore, the second tie rod being one piece including a solid second portion extending between the third threaded bore and the fourth threaded bore, the solid second portion having a length longer than a length of the third threaded bore or the fourth threaded bore, the solid second portion having a cross-sectional size equal to a cross-sectional size of the third end and fourth end; e) a second threaded rod threaded to the second threaded bore and the third threaded bore to attach the first tie rod to the second tie rod; and f) a third threaded rod threaded to the fourth threaded bore, the third threaded rod extending through the top plate. 2. A reinforced building wall as in claim 1 , wherein inspection openings are associated with one of the first, second, third and fourth threaded bores. 3. A reinforced building wall as in claim 1 , wherein one of the first, second, third and fourth threaded bores are multi-diameter bores. 4. A reinforced building wall as in claim 1 , wherein an intermediate portion of the first and second tie rods has a larger diameter than the diameter of the first, second, third and fourth bores. 5. A reinforced building wall as in claim 1 , wherein the first and second threaded bores together constitute about 25% or less of the length of the first tie rod. 6. A reinforced building wall as in claim 1 , wherein the third and fourth threaded bores together constitute about 25% or less of the length of the second tie rod. 7. A reinforced building wall as in claim 1 , wherein the first and second tie rods are hexagonal, circular or square in cross-section. 8. A reinforced building wall as in claim 1 , wherein the third threaded rod is operably attached to the top plate. 9. A reinforced building wall as in claim 1 , and further comprising: a) a second stud wall disposed above the first stud wall; and b) the third threaded rod is operably attached to the second stud wall. 10. A reinforced building wall as in claim 8 , and further comprising: a) a bearing plate disposed on the top plate; b) the third threaded rod extends through the bearing plate; and c) the third threaded rod is attached to the bearing plate with a nut. 11. A reinforced building wall as in claim 9 , and further comprising: a) a bearing plate disposed on a top plate of the second stud wall; b) the third threaded rod extends through the top plate of the second stud wall and the bearing plate; and c) the third threaded rod is attached to the bearing plate with a nut. 12. A reinforced building wall as in claim 9 , and further comprising: a) a cross member operably attached to the second stud wall; b) a bearing plate disposed on the cross member; c) the third threaded rod extends through the cross member and the bearing plate; and d) the third threaded rod is attached to the bearing plate with a nut. 13. A reinforced building wall as in claim 1 , wherein: a) the third threaded rod includes a distal threaded end portion and an unthreaded intermediate portion; and b) the distal threaded end portion is not disposed with the top plate. 14. A reinforced building wall as in claim 12 , wherein: a) the third threaded rod includes a distal threaded end portion and an unthreaded intermediate portion; and b) the distal threaded end portion is not disposed with the cross member. 15. A reinforced building wall as in claim 9 , and further comprising: a) a bearing plate disposed on a bottom plate of the second stud wall; b) the third threaded rod extends through the bottom plate of the second stud wall and the bearing plate; and c) the third threaded rod is attached to the bearing plate with a nut. 16. A reinforced building wall as in claim 15 , wherein: a) the third threaded rod includes a distal threaded end portion and an unthreaded intermediate portion; and b) the distal threaded end portion is not disposed with the top plate of the first stud wall and the bottom plate of the second stud wall.

Assignees

Inventors

Classifications

  • with metal connectors · CPC title

  • using permanent tensioning means, e.g. cables or rods, to assemble or rigidify structures (not pre- or poststressing concrete), e.g. by tying them around the structure · CPC title

  • E04B1/26Primary

    the supporting parts consisting of wood · CPC title

  • self adjusting, e.g. for compensation of shrinkage · CPC title

  • E04B1/4157Primary

    Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10480178B2 cover?
A reinforced building wall comprises a foundation; an anchor rod extending from the foundation; a first stud wall disposed above the foundation, the first stud wall including a first bottom plate and a first top place; a second stud wall disposed above the first stud wall, the second stud wall including a second bottom plate and a second top plate; the first tie rod including first and second t…
Who is the assignee on this patent?
Cetres Holdings Llc
What technology area does this patent fall under?
Primary CPC classification E04B1/26. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Nov 19 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).