Method for renewal of a track

US10458072B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10458072-B2
Application numberUS-201515319024-A
CountryUS
Kind codeB2
Filing dateMay 22, 2015
Priority dateJun 24, 2014
Publication dateOct 29, 2019
Grant dateOct 29, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method for renewal of a track includes picking up a plurality of old track panels using a crane jib projecting over the track from a train end of a work train and depositing the old track panels on the work train, thus creating a renewal gap delimited by a gap beginning and a gap end. New ballast is introduced with the aid of the crane jib into the gap end of the renewal gap. Subsequently, a new track panel pre-deposited on the work train is placed by the crane jib on the graded ballast of the gap end. A work train for renewal of a track is also provided.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method for renewal of a track, the method comprising the following steps: a) pivotably mounting a crane jib on a gantry crane having a first end supported on a track by vertically adjustable supporting devices, picking up a plurality of old track panels by using the crane jib projecting over the track from a train end of an on-track work train, and placing the old track panels on the work train, to create a renewal gap delimited by a gap beginning and a gap end and to expose ballast; b) after the renewal gap has reached a desired maximum length, using the crane jib to introduce new ballast pre-deposited on the work train into the gap end of the renewal gap and grading the ballast; c) placing a new track panel pre-deposited on the work train upon the graded ballast at the gap end by using the crane jib; and d) moving the work train on the new track panel in a direction towards the renewal gap, and then repeating the introduction of ballast and the subsequent placement of a new track panel according to steps b) and c) until reaching the gap beginning. 2. The method according to claim 1 , which further comprises carrying out the step of introducing the new ballast using the crane jib by using containers to be emptied above the renewal gap. 3. A work train for renewal of a track, the work train comprising: loading areas on the work train for storing old and new track panels; crane rails disposed on the work train; a gantry crane being movable on said crane rails in a longitudinal direction of the work train for transporting the track panels, said gantry crane having first and second crane ends being spaced from one another in the longitudinal direction of the work train; a crane jib having a first end pivotably fastened to said first crane end and a second end spaced from said gantry crane in the longitudinal direction of the work train; a panel gripping device disposed at said second end of said crane jib for seizing track panels and for introducing new ballast pre-deposited on the work train onto the track; and vertically adjustable supporting devices disposed at said first crane end for supporting said gantry crane on the track. 4. The work train according to claim 3 , which further comprises counterweights disposed at said second crane end of said gantry crane. 5. The work train according to claim 3 , which further comprises rail gripping devices disposed at said second crane end of said gantry crane and being pivotable perpendicularly to the longitudinal direction of the work train, said rail gripping devices form-locking connecting said gantry crane to said crane rails in a vertical direction.

Assignees

Inventors

Classifications

  • Placing the ballast; Making ballastway; Redistributing ballasting material; Machines or devices therefor; Levelling means · CPC title

  • E01B29/02Primary

    Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings (E01B29/04 takes precedence) · CPC title

  • mounted on railway vehicles, e.g. breakdown cranes · CPC title

  • on the track to be treated · CPC title

  • combined with concurrent renewal of track components · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10458072B2 cover?
A method for renewal of a track includes picking up a plurality of old track panels using a crane jib projecting over the track from a train end of a work train and depositing the old track panels on the work train, thus creating a renewal gap delimited by a gap beginning and a gap end. New ballast is introduced with the aid of the crane jib into the gap end of the renewal gap. Subsequently, a …
Who is the assignee on this patent?
Plasser & Theurer Export Von Bahnbaumaschinen Gmbh
What technology area does this patent fall under?
Primary CPC classification E01B29/02. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Oct 29 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).