Control device, control method, and computer-readable recording medium

US10425879B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10425879-B2
Application numberUS-201715649109-A
CountryUS
Kind codeB2
Filing dateJul 13, 2017
Priority dateJan 15, 2015
Publication dateSep 24, 2019
Grant dateSep 24, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A control device includes: a processor configured to: control a multihop communication path in a wireless network that includes a node group; when a first power storage speed of a target relay node in the node group is negative, calculate a first estimated time that is needed to reach a target power-storage value in a case where the target relay node is in a non-relay operating state; and in accordance with a length of the first estimated time calculated, change a state of the target relay node into the non-relay operating state or a stop state and change a state of another node, which is in the non-relay operating state, into a relay operating state.

First claim

Opening claim text (preview).

What is claimed is: 1. A control device comprising: a processor configured to: control a multihop communication path in a wireless network that includes a node group; when a first power storage speed of a target relay node in the node group is negative, calculate a first estimated time that is needed to reach a target power-storage value in a case where the target relay node is in a non-relay operating state; and in accordance with a length of the first estimated time calculated, change a state of the target relay node into the non-relay operating state or a stop state and change a state of another node, which is in the non-relay operating state, into a relay operating state, wherein when the first estimated time that is needed to reach the target power-storage value in the case where the target relay node is in the non-relay operating state is calculated to be more than a predetermined length of time, the target relay node is dedicated to power generation and power storage to promptly return to a desirable power state. 2. The control device according to claim 1 , wherein the processor is further configured to: acquire a plurality of first power storage speeds that correspond to a plurality of periods with regard to the target relay node and a plurality of power generation speeds that correspond to the plurality of periods with regard to the target relay node; in accordance with a power generation speed that is acquired in a target period included in the plurality of periods, calculate a second power storage speed in a case where the target relay node is in the non-relay operating state; divide a difference value between the target power-storage value and an amount of stored power of the target relay node in the target period by the second power storage speed calculated and, in accordance with a division result, calculates a second estimated time; and calculate the first estimated time by multiplying the second estimated time calculated by a weight coefficient that corresponds to a likelihood of the power generation speed that is acquired in the target period. 3. The control device according to claim 2 , wherein when a variance of the plurality of power generation speeds, acquired up to the target period, is more than a predetermined value, the processor is further configured to multiply the second estimated time calculated by the weight coefficient that corresponds to the likelihood of the power generation speed that is acquired in the target period, to calculate the first estimated time. 4. The control device according to claim 3 , wherein the processor is further configured to: calculate a time interval during which the variance of the plurality of power generation speeds, acquired up to the target period, is determined to be more than the predetermined value; and when the first estimated time calculated is more than the time interval calculated, set the target relay node to the stop state, and when the first estimated time calculated is equal to or less than the time interval calculated, set the target relay node to the non-relay operating state. 5. A control method comprising: controlling a multihop communication path in a wireless network that includes a node group, by a processor; when a first power storage speed of a target relay node in the node group is negative, calculating a first estimated time that is needed to reach a target power-storage value in a case where the target relay node is in a non-relay operating state, by the processor; and in accordance with a length of the first estimated time calculated, changing a state of the target relay node into the non-relay operating state or a stop state and changing a state of another node, which is in the non-relay operating state, into a relay operating state, by the processor, wherein when the first estimated time that is needed to reach the target power-storage value in the case where the target relay node is in the non-relay operating state is calculated to be more than a predetermined length of time, the target relay node is dedicated to power generation and power storage to promptly return to a desirable power state. 6. A non-transitory computer-readable recording medium storing therein a control program that causes a computer to execute a process comprising: controlling a multihop communication path in a wireless network that includes a node group; when a first power storage speed of a target relay node in the node group is negative, calculating a first estimated time that is needed to reach a target power-storage value in a case where the target relay node is in a non-relay operating state; and in accordance with a length of the first estimated time calculated, changing a state of the target relay node into the non-relay operating state or a stop state and changing a state of another node, which is in the non-relay operating state, into a relay operating state, wherein when the first estimated time that is needed to reach the target power-storage value in the case where the target relay node is in the non-relay operating state is calculated to be more than a predetermined length of time, the target relay node is dedicated to power generation and power storage to promptly return to a desirable power state.

Assignees

Inventors

Classifications

  • Power saving arrangements · CPC title

  • Self-organising networks, e.g. ad-hoc networks or sensor networks · CPC title

  • managing power supply demand, e.g. depending on battery level · CPC title

  • H04W40/10Primary

    based on available power or energy · CPC title

  • Cross-Sectional Technologies · mapped topic

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10425879B2 cover?
A control device includes: a processor configured to: control a multihop communication path in a wireless network that includes a node group; when a first power storage speed of a target relay node in the node group is negative, calculate a first estimated time that is needed to reach a target power-storage value in a case where the target relay node is in a non-relay operating state; and in ac…
Who is the assignee on this patent?
Fujitsu Ltd
What technology area does this patent fall under?
Primary CPC classification H04W40/10. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Sep 24 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).