Electric vehicle battery test

US10421367B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10421367-B2
Application numberUS-201615336034-A
CountryUS
Kind codeB2
Filing dateOct 27, 2016
Priority dateOct 30, 2015
Publication dateSep 24, 2019
Grant dateSep 24, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

An adaptive and adjustable isolation fault testing of a multi-string battery of an electric vehicle is disclosed. The isolation fault testing can be performed in an adjustable or predetermined loop having dedicated time windows for respective battery strings in compliance with the system requirements, specification, and regulatory regime.

First claim

Opening claim text (preview).

What is claimed is: 1. An electric vehicle comprising: a motor coupled to one or more wheels of the electric vehicle; an inverter coupled to the motor; a first power bus coupled to the inverter; and a first battery string having an output that is coupled to the first power bus through a first switch, a second battery string different from the first battery string having an output that is coupled to the first power bus through a second switch different from the first switch; for each of the first and second battery string: a first test load with a known impedance connected to a positive node of the respective battery string and a second test load with a known impedance connected to a negative node of the respective battery string; and a battery management circuit coupled to at least the first switch and the second switch, the battery management circuit configured to selectively and independently control the open or closed state of the first switch and the second switch, the battery management circuit further configured to perform isolation fault testing by: performing testing steps including: during a first predetermined time window of a timeframe, determining an isolation status of the first battery string, during a second predetermined time window of the timeframe, determining an isolation status of the second battery string, calculating a new time window value based on the isolation status of the first battery string, and setting the first predetermined time window to the new time window value; and repeating the testing steps; wherein the isolation status of each of the first and second battery strings is determined by: comparing a first voltage measurement across the first test load between the positive node and a chassis ground of the electric vehicle with a first expected voltage based on the impedance of the first test load; and comparing a second voltage measurement across the second test load between the negative node and the chassis ground of the electric vehicle with a second expected voltage based on the impedance of the second test load. 2. The electric vehicle of claim 1 , wherein the battery management circuit is configured to perform isolation fault testing while the inverter is drawing current from the first power bus. 3. The electric vehicle of claim 2 , wherein the battery management circuit is configured to determine an isolation status of a battery pack including the first battery string and the second battery string, the isolation status of the battery pack being determined based at least in part on the isolation status of the first battery string and the isolation status of the second battery string. 4. The electric vehicle of claim 1 , further comprising at least one test current path coupled to each battery string and switchably connected to a chassis of the electric vehicle, each test current path comprising a test load. 5. The electric vehicle of claim 4 , further comprising current detection circuitry coupled to the battery management circuit and configured to measure a current flowing through a test current path, wherein the current detection circuitry is configured to send measured current information to the battery management circuit. 6. The electric vehicle of claim 5 , wherein the isolation fault testing comprises comparing the measured current information to at least one of predetermined information associated with a normal condition and predetermined information associated with a fault condition. 7. The electric vehicle of claim 1 , wherein the battery management circuit is configured to perform the isolation fault testing for each battery string during one of a plurality of predetermined dedicated testing time windows including the first and second predetermined time windows. 8. The electric vehicle of claim 7 , wherein the battery management circuit is further configured to implement an intentional delay time window between consecutive testing time windows. 9. A method of testing a plurality of battery strings in an electric vehicle comprising: performing a battery test, the battery test steps comprising: disconnecting a first battery string from a power bus of the electric vehicle; during a first predetermined time window within a timeframe, determining an isolation status of the first battery string by performing an isolation fault test on the first battery string; reconnecting the first battery string to the power bus; while the first battery string remains connected to the power bus, disconnecting a second battery string from the power bus of the electric vehicle; during a second predetermined time window within the timeframe, determining an isolation status of the second battery string by performing an isolation fault test on the second battery string; calculating a new time window value different from the first predetermined time window based on the isolation status of the first battery string; setting the first predetermined time window to the new time window value; and repeating the steps of the battery test; wherein performing the isolation fault test on each tested battery string comprises: comparing a first voltage measurement across a first test load between a positive node of the tested battery string and a chassis ground of the electric vehicle with a first expected voltage based on a known impedance of the first test load; comparing a second voltage measurement across a second test load between a negative node of the tested battery string and the chassis ground of the electric vehicle with a second expected voltage based on a known impedance of the second test load. 10. The method of claim 9 , wherein the isolation fault tests are performed during operation of the electric vehicle. 11. The method of claim 9 , further comprising determining an isolation status of a battery pack including the first battery string and the second battery string, the isolation status of the battery pack being determined based at least in part on the isolation status of the first battery string and the isolation status of the second battery string. 12. The method of claim 9 , wherein at least one additional battery string is connected to the power bus while the first battery string is disconnected. 13. The method of claim 9 , wherein the isolation fault test is performed on each tested battery string during one of a plurality of a-predetermined dedicated testing time windows including the first and second predetermined time windows. 14. The method of claim 13 , wherein consecutive testing time windows are separated by an intentional delay time window. 15. The method of claim 9 , wherein, upon repeating the steps of the battery test, the second predetermined time window is not changed. 16. The method of claim 9 , wherein the battery test steps further comprise: calculating a second new time window value based on the new time window value, and setting the second predetermined time window to the second new time window value. 17. The method of claim 16 , wherein, upon repeating the battery test steps, the order of determining an isolation status of the first battery string and determining the isolation status of the second battery string are reversed.

Assignees

Inventors

Classifications

  • using microprocessors or computers · CPC title

  • responding to state of charge [SoC] · CPC title

  • having the same nominal voltage · CPC title

  • of two or more battery modules · CPC title

  • of the electric storage means for propulsion · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10421367B2 cover?
An adaptive and adjustable isolation fault testing of a multi-string battery of an electric vehicle is disclosed. The isolation fault testing can be performed in an adjustable or predetermined loop having dedicated time windows for respective battery strings in compliance with the system requirements, specification, and regulatory regime.
Who is the assignee on this patent?
Faraday & Future Inc
What technology area does this patent fall under?
Primary CPC classification B60L3/0046. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Sep 24 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 6 related publications on this page (citations in our corpus or others sharing the same primary CPC).