Method for manufacturing containers from preforms, allowing a systematic check on the conformity of the preforms

US10406741B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10406741-B2
Application numberUS-201515110313-A
CountryUS
Kind codeB2
Filing dateJan 23, 2015
Priority dateFeb 12, 2014
Publication dateSep 10, 2019
Grant dateSep 10, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Method of manufacturing containers by blow-molding preforms, comprising a phase of heating the preforms (3) followed by a phase of forming the containers (this phase comprising a pre-blowing step followed by a blowing step), this method comprising the operations consisting in: detecting a pressure spike during the pre-blowing and comparing it against a reference spike, if the pressure in the pressure spike is below the reference pressure, checking an event history to determine whether a heating instruction and/or a forming instruction has been modified; if the result of this check is positive, commanding at least one of the following actions: o generating an alert alarm, o stopping the supply of preforms to the oven, o ejecting the containers derived from the affected preforms.

First claim

Opening claim text (preview).

The invention claimed is: 1. A process for manufacturing containers ( 2 ) by blow molding from preforms ( 3 ) made of thermoplastic material, comprising: a cyclic phase for heating preforms ( 3 ) in a stream within a furnace ( 4 ), at a heating temperature and a speed of advance according to programmed heating instructions (CC), followed by a shaping phase for shaping preforms ( 3 ) within a shaping unit ( 6 ) with a plurality of molding stations ( 14 ), each of said molding stations equipped with a mold ( 15 ) bearing an imprint of a container ( 2 ), the shaping phase being cyclic and comprising a pre-blow-molding step that includes injecting into the preforms ( 3 ) a gas at a pre-blow-molding pressure (P) and a pre-blow-molding flow rate according to programmed shaping instructions (CF), followed by a blow-molding step that includes injecting into the preforms ( 3 ) a gas at a blow-molding pressure that exceeds the pre-blow-molding pressure, the process also comprising operations of: measuring, at every instant, a real value of the pressure prevailing in the preforms ( 3 ) within each mold ( 15 ), at least during the pre-blow-molding step; storing the real pressure values thus measured and associated measurement times; detecting among said real pressure values a maximum real value of the pressure; comparing said maximum real value of the pressure and the associated measurement time with, respectively, a predetermined maximum reference value of the pressure (P B1 ) and an associated reference time (t B1 ); verifying whether the following necessary conditions are fulfilled together over a period that is greater than or equal to a length of time of a heating cycle and for all of the molding stations ( 14 ): the measurement time associated with the maximum real value of the pressure coincides with the reference time (t B1 ), and the maximum real value of the pressure is less than the maximum reference value of the pressure (P B1 ), where the maximum real value of the pressure is determined to be less than the maximum reference value of the pressure (P B1 ) if the difference between the maximum real value of the pressure and the maximum reference value of the pressure (P B1 ) is greater than several hundred millibars; in the event said necessary conditions are fulfilled together, verifying in a chronology of events whether the heating instructions (CC) and the shaping instructions (CF) have undergone any modifications during a predetermined time interval preceding said measuring; and in the event the result of said verifying indicates that neither of the heating instructions (CC) nor the shaping instructions (CF) has undergone a modification during said predetermined time interval, determining the preforms ( 3 ) to be sub-standard and carrying out at least one of the following actions: generating an alert, stopping the supply of the furnace ( 4 ) with preforms ( 3 ), and ejecting the containers ( 2 ) produced from sub-standard preforms ( 3 ). 2. The process according to claim 1 , wherein the measurement time associated with the maximum real value is determined to be simultaneous with the reference time if the difference between them is less than or equal to approximately 10 ms. 3. The process according to claim 2 , wherein the measurement time associated with the maximum real value is determined to be simultaneous with the reference time if the difference between them is less than or equal to approximately 5 ms. 4. The process according to claim 1 , wherein the generation of an alert includes displaying a message on a graphic interface. 5. The process according to claim 1 , wherein with the furnace ( 4 ) and the heating unit ( 6 ) being directed respectively by dedicated slave control units ( 37 , 38 ), both attached to a master control unit ( 35 ), the verification operations are carried out by the master control unit ( 35 ). 6. An installation ( 1 ) for manufacturing containers ( 2 ) by blow molding from preforms ( 3 ) made of thermoplastic material, comprising: a furnace ( 4 ) in which the preforms ( 3 ) undergo a cyclic heating phase at a heating temperature and a speed of advance according to heating instructions (CC); a system ( 5 ) for supplying the furnace ( 4 ) with preforms ( 3 ); a shaping unit ( 6 ) comprising a number of molding stations ( 14 ), each of said molding stations equipped with a mold ( 15 ) bearing an imprint of a container ( 2 ), for the shaping of containers ( 2 ) by blow molding or stretch blow molding of the preforms ( 3 ) exiting the furnace ( 4 ), following a cyclic shaping phase comprising a pre-blow-molding step that includes injecting into the preforms ( 3 ) a gas at a pre-blow-molding pressure (P) and a pre-blow-molding flow rate according to shaping instructions (CF), followed by a blow-molding step consisting in injecting into the preforms ( 3 ) a gas at a blow-molding pressure that exceeds the pre-blow-molding pressure; a command system ( 34 ) including at least one memory ( 39 ) in which a chronology of events is stored, said chronology of events including at least the heating instructions (CC) and the shaping instructions (CF), together with a time from which either of a new heating instruction or a new shaping instruction is made active, with said system ( 34 ) being programmed for: measuring, at every instant, a real value of the pressure prevailing in the preforms ( 3 ) within each mold ( 15 ), at least during the pre-blow-molding step, storing the real pressure values thus measured and associated measurement times, detecting among said real pressure values a maximum real value of the pressure, and comparing said maximum real value of the pressure and the associated measurement time with, respectively, a predetermined maximum reference value of the pressure (P B1 ) and an associated reference time (t B1 ), wherein the command system ( 34 ) is programmed for: verifying if the following necessary conditions are fulfilled together over a period that is greater than or equal to a length of time of a heating cycle and for all of the molding stations ( 14 ): the measurement time associated with the maximum real value of the pressure coincides with the reference time (t B1 ), and the maximum real value of the pressure is less than the maximum reference value of the pressure (P B1 ), where the maximum real value of the pressure is determined to be less than the maximum reference value of the pressure (P B1 ) if the difference between the maximum real value of the pressure and the maximum reference value of the pressure (P m ) is greater than several hundred millibars; and in the event that said necessary conditions are fulfilled together, verifying in the chronology of events that no modification of the heating instructions (CC) and no modification of the shaping instructions (CF) has occurred during a predetermined time interval preceding said measuring, wherein the command system is further programmed to determine that the preforms ( 3 ) are sub-standard in the event that the verifying indicates that neither of the heating instructions (CC) nor the shaping instructions (CF) has undergone a modification during said predetermined time interval, wherein the installation further comprises an actuator controlled by the command system and structured for carrying out at least one of the following actions: generating an alert, stopping the supply of the furnace ( 4 ) with preforms ( 3 ), and ejecting the containers ( 2 ) produced from said sub-standard preforms ( 3 ). 7. A non-transitory computer-readable recording medium having recorded thereon a computer program executable by a computer processing unit integrated in a command system ( 34 ) of a container manufacturing installation ( 2 ), where said installat

Assignees

Inventors

Classifications

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10406741B2 cover?
Method of manufacturing containers by blow-molding preforms, comprising a phase of heating the preforms (3) followed by a phase of forming the containers (this phase comprising a pre-blowing step followed by a blowing step), this method comprising the operations consisting in: detecting a pressure spike during the pre-blowing and comparing it against a reference spike, if the pressure in the pr…
Who is the assignee on this patent?
Sidel Participations
What technology area does this patent fall under?
Primary CPC classification B29C49/78. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Sep 10 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).