Methods and systems for ultra-trace analysis of liquids
US-9341609-B2 · May 17, 2016 · US
US10399130B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10399130-B2 |
| Application number | US-201615744358-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jul 18, 2016 |
| Priority date | Jul 22, 2015 |
| Publication date | Sep 3, 2019 |
| Grant date | Sep 3, 2019 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for installing an in situ, low-permeability temporary horizontal barrier at depth for vertical containment of a soil mass including installing a low permeability vertical barrier having walls located to contain a predetermined soil volume, the vertical barrier having a horizontal surface area in a plane perpendicular to its walls; and injecting low permeability reagents capable of forming a temporary horizontal barrier in a pattern suitable for creating a horizontal subsurface barrier joined to all of the vertical barrier walls to form an in situ barrier.
Opening claim text (preview).
What is claimed is: 1. A method for installing an in situ, low-permeability temporary horizontal barrier at a depth for vertical containment of a soil mass, the method comprising: installing a low permeability vertical barrier having a plurality of walls located to contain a predetermined soil volume, the vertical barrier having a horizontal surface area in a plane perpendicular to its walls; injecting low permeability reagents capable of forming the in situ, low-permeability temporary horizontal barrier in a pattern suitable for creating a horizontal subsurface barrier joined to all of the vertical barrier walls to form the in situ low-permeability barrier; and removing the in situ, low-permeability temporary horizontal barrier through application of a solution capable of dissolving the barrier. 2. The method of claim 1 further comprising implementing quality assurance and validation procedures after installation of the in situ, low-permeability barrier. 3. The method of claim 1 further comprising implementing remediation procedures. 4. The method of claim 1 further comprising site monitoring. 5. The method of claim 1 wherein the horizontal barrier degrades in a predefined duration due to environmental conditions. 6. The method of claim 1 wherein the low permeability reagents capable of forming the in situ, low-permeability temporary horizontal barrier are selected from the group consisting of sodium bentonite, enzyme-induced calcite precipitation, biopolymers, guar, microorganisms, vegetable oil, polysaccharide polymers, and xanthan gum. 7. The method of claim 1 wherein installing the vertical barrier comprises horizontal or direction drilling. 8. A system for installing an in situ, low-permeability temporary horizontal barrier for vertical containment of soil contaminants, the system comprising: a low permeability vertical barrier having a plurality of walls located to contain a predetermined soil volume, the vertical barrier having a horizontal surface area in a plane perpendicular to its walls; an injection tool including an injection channel and a plurality of distribution ports for boring into the predetermined soil volume and injecting low permeability reagents capable of forming the in situ, low-permeability temporary horizontal barrier to create a horizontal subsurface barrier joined to all of the vertical barrier walls to form an in situ barrier; and removing the in situ, low-permeability temporary horizontal barrier through application of a solution capable of dissolving the barrier. 9. The system of claim 8 further comprising implementing quality assurance and validation procedures after installation of the in situ, low-permeability temporary horizontal barrier. 10. The system of claim 8 further comprising implementing remediation procedures including the injection and mixing of remediation agents in the treatment zone during placement and/or retrieval of the injection tool. 11. The system of claim 8 further comprising site monitoring. 12. The system of claim 8 wherein the horizontal barrier degrades due to environmental conditions. 13. The system of claim 8 wherein the low permeability reagents capable of forming the in situ, low-permeability temporary horizontal barrier are selected from the group consisting of sodium bentonite, enzyme-induced calcite precipitation, biopolymers, guar and xanthan gum. 14. The system of claim 13 wherein the reagent comprises sodium bentonite having a dosage in solution in the range of 10% w/v to 20% w/v. 15. The system of claim 13 wherein the reagent comprises xanthan gum having a dosage in solution in the range of 0.1% w/v to 1.0% w/v. 16. The system of claim 13 wherein the reagent comprises guar gum having a dosage in solution in the range of 0.5% w/v to 3.0% w/v.
Reclamation of contaminated soil · CPC title
comprising details of connection between elements · CPC title
Injection of material · CPC title
Xanthan, i.e. D-glucose, D-mannose and D-glucuronic acid units, saubstituted with acetate and pyruvate, with a main chain of (beta-1,4)-D-glucose units; Derivatives thereof · CPC title
Ground foundation measures for protecting the soil or subsoil water, e.g. preventing or counteracting oil pollution (not used, see subgroups and E02D31/00) · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.