Management of revisions on revisions of orders

US10387944B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10387944-B2
Application numberUS-201514877603-A
CountryUS
Kind codeB2
Filing dateOct 7, 2015
Priority dateOct 7, 2015
Publication dateAug 20, 2019
Grant dateAug 20, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method for managing a current revision on prior revision of an order is described. A modified set of compensations tasks for addressing amendments indicated in the current revision are determined. The modified set of compensation tasks may be determined by carrying over one or more compensation tasks, associated with the prior revision, that have not yet been completed. Alternatively or additionally, the modified set of compensation tasks may be determined by adding new compensation tasks based on the current revision.

First claim

Opening claim text (preview).

What is claimed is: 1. A non-transitory computer readable medium comprising instructions, which when executed by one or more hardware processors, causes performance of operations comprising: storing, by an order management system, a first orchestration plan comprising a first plurality of compensation tasks associated with a first revision of a set of order attributes for an order; wherein the first orchestration plan comprises a first metadata-driven executable orchestration process that comprises at least the first plurality of compensation tasks for fulfilling the order; wherein the first orchestration plan manages fulfillment of the order by one or more fulfillment providers that interface with the order management system using a computer network; prior to completing at least a subset of compensation tasks in the first plurality of compensation tasks, electronically receiving a request for a second revision of the set of order attributes; suspending the first orchestration plan; generating a second orchestration plan comprising a second plurality of compensation tasks associated with the second revision, wherein generating the second orchestration plan comprises: identifying a first compensation task of the subset of compensation tasks that are not completed; identifying a first order attribute, of the set of order attributes, that is used by the first compensation task; determining that a first value to be configured for the first order attribute is indicated by the first revision; determining that any value to be configured for the first order attribute is not indicated by the second revision; carrying over the first compensation task from the first orchestration plan into the second orchestration plan; wherein the second orchestration plan comprises a second metadata-driven executable orchestration process that comprises at least the second plurality of compensation tasks for fulfilling the order; wherein the second orchestration plan manages fulfillment of the order by the one or more fulfillment providers that interface with the order management system using the computer network; and executing the second orchestration plan at least by transmitting a command from the order management system to the one or more fulfillment providers via the computer network. 2. The medium of claim 1 , wherein the second plurality of compensation tasks is completed instead of the subset of compensation tasks that is not yet completed. 3. The medium of claim 1 , wherein generating the second orchestration plan further comprises: identifying a first set of compensation tasks, in the first plurality of compensation tasks, that have been completed, wherein the first set of compensation tasks comprises a first set of tasks completed for the first revision; identifying one or more values specified by the second revision for one or more of the set of order attributes; identifying a second set of candidate tasks for the second revision, wherein the second set of candidate tasks for the second revision comprises a second set of tasks to be completed for a second order that specifies the one or more values for the one or more of the set of order attributes; determining that a particular task is not included in the first set of tasks but is included in the second set of tasks; including the particular task in the second orchestration plan. 4. The medium of claim 3 , wherein generating the second orchestration plan further comprises: responsive to determining that the particular task is not included in the first set of tasks but is included in the second set of tasks: selecting an AMEND DO or DO execution mode for the particular task, in the second orchestration plan. 5. The medium of claim 1 , wherein generating the second orchestration plan further comprises: identifying a first set of compensation tasks, in the first plurality of compensation tasks, that have been completed, wherein the first set of compensation tasks comprises a first set of tasks completed for the first revision; identifying one or more values specified by the second revision for one or more of the set of order attributes; identifying a second set of candidate tasks for the second revision, wherein the second set of candidate tasks for the second revision comprises a second set of tasks to be completed for a second order that specifies the one or more values for the one or more of the set of order attributes; determining that a particular task is included in both the first set of tasks and the second set of tasks; determining that a first set of values for a subset of the set of order attributes associated with the particular task in the first set of tasks are same as a second set of values for the subset of the set of order attributes associated with the particular task in the second set of tasks; refraining from including the particular task in the second orchestration plan. 6. The medium of claim 1 , wherein generating the second orchestration plan further comprises: identifying a first set of compensation tasks, in the first plurality of compensation tasks, that have been completed, wherein the first set of compensation tasks comprises a first set of tasks completed for the first revision; identifying one or more values specified by the second revision for one or more of the set of order attributes; identifying a second set of candidate tasks for the second revision, wherein the second set of candidate tasks for the second revision comprises a second set of tasks to be completed for a second order that specifies the one or more values for the one or more of the set of order attributes; determining that a particular task is included in the first set of tasks but is not included in the second set of tasks; including the particular task in the second orchestration plan. 7. The medium of claim 6 , wherein generating the second orchestration plan further comprises: responsive to determining that the particular task is included in the first set but is not included in the second set: selecting an UNDO execution mode for the particular task, in the second orchestration plan. 8. The medium of claim 1 , wherein generating the second orchestration plan further comprises: identifying a first set of compensation tasks, in the first plurality of compensation tasks, that have been completed, wherein the first set of compensation tasks comprises a first set of tasks completed for the first revision; identifying one or more values specified by the second revision for one or more of the set of order attributes; identifying a second set of candidate tasks for the second revision, wherein the second set of candidate tasks for the second revision comprises a second set of tasks to be completed for a second order that specifies the one or more values for the one or more of the set of order attributes; determining that a particular task is included in both the first set of tasks and the second set of tasks; determining that a first value for at least one of the set of order attributes associated with the particular task in the first set of tasks is different from a second value for the at least one of the set of order attributes associated with the particular task in the second set of tasks; including the particular task in the second orchestration plan. 9. The medium of claim 8 , wherein generating the second orchestration plan further comprises: responsive to determining that a first value for at least one of the set of order attributes associated with the particular task in the first set of tasks is different from a second value for the at least one of the set of order attributes associated with the particular task in the second set of tasks: selecting a

Assignees

Inventors

Classifications

  • Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling · CPC title

  • replenishment orders; recurring orders · CPC title

  • Status monitoring or status determination for a person or group · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10387944B2 cover?
A method for managing a current revision on prior revision of an order is described. A modified set of compensations tasks for addressing amendments indicated in the current revision are determined. The modified set of compensation tasks may be determined by carrying over one or more compensation tasks, associated with the prior revision, that have not yet been completed. Alternatively or addit…
Who is the assignee on this patent?
Oracle Int Corp
What technology area does this patent fall under?
Primary CPC classification G06Q30/0635. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Aug 20 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).