Control method and apparatus for continuous casting steel pouring

US10369624B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10369624-B2
Application numberUS-201214408873-A
CountryUS
Kind codeB2
Filing dateDec 10, 2012
Priority dateJun 29, 2012
Publication dateAug 6, 2019
Grant dateAug 6, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A control method and apparatus for continuous casting steel pouring are provided, wherein the amount of the molten steel flow of the ladle is controlled, thereby improving the yield of the molten steel and decreasing the production cost.

First claim

Opening claim text (preview).

The invention claimed is: 1. A control apparatus for continuous casting steel pouring, comprising: a steel ladle, a sliding nozzle, a steel ladle long nozzle, a tundish, a sliding nozzle driving cylinder, a cylinder driving unit, an inferential controller comprising a unit for receiving data, analyzing the received data, computing at least one value based on the analyzed data, and output a control function, and a PI controller, wherein the steel ladle long nozzle connects the steel ladle and the tundish; wherein further, the inferential controller is configured to: obtain a steel slag amount signal from a steel slag measurement sensor; determine that the steel slag amount signal is greater than a manually set steel slag amount value; in response to the steel slag amount signal being greater, determine a cylinder control signal; and send the cylinder control signal to the PI controller; wherein the PI controller is configured to determine a degree of opening of the sliding nozzle based on the cylinder control signal and outputs a second signal to the cylinder driving unit based on the determined degree of opening of the sliding nozzle; and wherein, upon receipt of the second signal, the cylinder driving unit is configured to adjust the degree of opening of the sliding nozzle based on the second signal by sending one or more third signals to the sliding nozzle driving cylinder. 2. The control apparatus of claim 1 , further comprising a steel slag measurement sensor, a steel slag measurement signal amplifier, a steel ladle position sensor, a cylinder piston position sensor, an alarm, and a steel pouring optimization control computer. 3. The control apparatus of claim 2 , wherein the steel ladle position sensor is installed on a turntable of the steel ladle, and wherein the steel ladle position sensor outputs a signal to an on-site process control computer. 4. The control apparatus of claim 3 , wherein the on-site process control computer outputs a steel ladle position signal to a process signal interface unit. 5. The control apparatus of claim 4 , wherein the process signal interface unit outputs the steel ladle position signal to the steel pouring optimization control computer. 6. The control apparatus of claim 2 , wherein the cylinder piston position sensor is installed on the sliding nozzle driving cylinder, and wherein the cylinder piston position sensor outputs a signal to the steel pouring optimization control computer. 7. The control apparatus of claim 6 , wherein computer connects with the cylinder driving unit and an alarm” with—an output of the steel pouring optimization control computer connects with the cylinder driving unit and the alarm.

Assignees

Inventors

Classifications

  • Supplying or treating molten metal (B22D41/00 takes precedence) · CPC title

  • Pouring-nozzles · CPC title

  • B22D11/18Primary

    for pouring (B22D11/20 takes precedence) · CPC title

  • Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like (B22D39/00, B22D43/00 take precedence) · CPC title

  • of specific alloys · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10369624B2 cover?
A control method and apparatus for continuous casting steel pouring are provided, wherein the amount of the molten steel flow of the ladle is controlled, thereby improving the yield of the molten steel and decreasing the production cost.
Who is the assignee on this patent?
Baoshan Iron & Steel
What technology area does this patent fall under?
Primary CPC classification B22D11/18. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Aug 06 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).