Detector packages
US-2015369927-A1 · Dec 24, 2015 · US
US10358917B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10358917-B2 |
| Application number | US-201514741913-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jun 17, 2015 |
| Priority date | Jun 18, 2014 |
| Publication date | Jul 23, 2019 |
| Grant date | Jul 23, 2019 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
An apparatus is operated to obtain a model predicting data associated with a theoretical sampling operation to be performed by a downhole sampling tool, including predicted water-cut and pressure data relative to time elapsed during the theoretical sampling operation. The model predicts the water-cut and pressure data based on estimated relative permeability and capillary pressure related to different constituents of fluid theoretically obtained from a subterranean formation by the downhole sampling tool during the theoretical sampling operation. An actual sampling operation is performed with the downhole sampling tool to actually obtain fluid and data associated with the actually obtained fluid, including actual water-cut and drawdown pressure data. The apparatus is then operated to update the model utilizing the actual data water-cut and drawdown pressure data, thus obtaining actual relative permeability and capillary pressure data.
Opening claim text (preview).
What is claimed is: 1. A method, comprising: operating an apparatus to obtain a model predicting data associated with a theoretical sampling operation to be performed by a downhole sampling tool, wherein the predicted data comprises predicted water-cut and drawdown pressure data relative to time elapsed during the theoretical sampling operation, and wherein the model predicts the time-based water-cut and drawdown pressure data based on estimated relative permeability and capillary pressure related to different constituents of fluid theoretically obtained from a subterranean formation by the downhole sampling tool during the theoretical sampling operation; performing an actual sampling operation with the downhole sampling tool to actually obtain fluid from the subterranean formation and actual data associated with the actually obtained fluid, wherein the actual data comprises actual water-cut and drawdown pressure data relative to time elapsed during the actual sampling operation; and operating the apparatus to update the model utilizing the actual data water-cut and drawdown pressure data, thus obtaining actual relative permeability and capillary pressure related to different constituents of the actual fluid obtained during the actual sampling operation. 2. The method of claim 1 wherein updating the model comprises iteratively adjusting the estimated relative permeability and capillary pressure until the predicted water-cut and drawdown pressure data matches the actual water-cut and drawdown pressure data. 3. The method of claim 2 wherein updating the model utilizes gradient optimization, deterministic optimization, stochastic optimization, or a combination thereof. 4. The method of claim 1 wherein the actual sampling operation is performed with the downhole sampling tool disposed in a wellbore extending into the subterranean formation, and wherein performing the actual sampling operation comprises: isolating an interval of the wellbore by extending two packers of the downhole sampling tool into sealing contact with a perimeter of the wellbore; and reducing pressure within the isolated wellbore interval to draw fluid from the subterranean formation into the isolated wellbore interval. 5. The method of claim 4 wherein the model is a drift-flux model. 6. The method of claim 4 wherein inputs for the model include geometric data related to a dimension or volume of the isolated wellbore interval. 7. The method of claim 4 wherein the model accounts for a time delay associated with accumulation of the actually obtained fluid in the isolated wellbore interval before the actually obtained fluid is drawn into the downhole sampling tool. 8. The method of claim 1 wherein the actual sampling operation is performed with the downhole sampling tool disposed in a wellbore extending into the subterranean formation, and wherein performing the actual sampling operation comprises: establishing sealing contact between an inlet of a probe of the downhole sampling tool and a location on a perimeter of the wellbore; and reducing pressure within the probe inlet to draw fluid from the subterranean formation into the downhole sampling tool. 9. The method of claim 8 wherein the model is a homogenous model. 10. The method of claim 8 wherein inputs for the model include geometric data related to a dimension or volume of the probe inlet. 11. The method of claim 1 wherein: the fluid theoretically obtained during the theoretical sampling operation and the fluid actually obtained during the actual sampling operation comprise two immiscible fluids, including a first fluid comprising water and a second fluid comprising hydrocarbons; the wellbore was formed in the subterranean formation by a drilling operation utilizing water-based drilling fluid; during early stages of the theoretical and actual sampling operations, the theoretically and actually obtained fluids comprise more of the first fluid than the second fluid; and during late stages of the theoretical and actual sampling operations, the theoretically and actually obtained fluids comprise more of the second fluid than the first fluid. 12. The method of claim 1 wherein: the fluid theoretically obtained during the theoretical sampling operation and the fluid actually obtained during the actual sampling operation comprise two immiscible fluids, including a first fluid comprising oil and a second fluid comprising water; the wellbore was formed in the subterranean formation by a drilling operation utilizing oil-based drilling fluid; during early stages of the theoretical and actual sampling operations, the theoretically and actually obtained fluids comprise more of the first fluid than the second fluid; and during late stages of the theoretical and actual sampling operations, the theoretically and actually obtained fluids comprise more of the second fluid than the first fluid. 13. A system, comprising: a downhole sampling tool operable within a wellbore extending from a wellsite surface into a subterranean formation, wherein the downhole sampling tool is operable to perform an actual sampling operation to actually obtain fluid from the subterranean formation and actual data associated with the actually obtained fluid, wherein the actual data comprises actual water-cut and drawdown pressure data relative to time elapsed during the actual sampling operation; and an apparatus operable to update a model utilizing the actual data water-cut and drawdown pressure data, wherein: the model predicts data associated with a theoretical sampling operation to be performed by the downhole sampling tool; the predicted data comprises predicted water-cut and drawdown pressure data, relative to time elapsed during the theoretical sampling operation, based on estimated relative permeability and capillary pressure related to different constituents of fluid theoretically obtained from the subterranean formation by the downhole sampling tool during the theoretical sampling operation; and updating the model by iteratively adjusting the estimated relative permeability and capillary pressure until the predicted water-cut and drawdown pressure data matches the actual water-cut and drawdown pressure data, thus obtaining actual relative permeability and capillary pressure related to different constituents of the actual fluid obtained during the actual sampling operation. 14. The system of claim 13 wherein: the downhole sampling tool comprises a dual-packer module utilized to perform the actual sampling operation; the model is a drift-flux model; inputs for the drift-flux model include geometric data related to a dimension or volume of a wellbore interval isolated by the dual-packer module during the actual sampling operation; and the drift-flux model accounts for a time delay associated with accumulation of the actually obtained fluid in the isolated wellbore interval before the actually obtained fluid is drawn into the downhole sampling tool. 15. The system of claim 13 wherein: the downhole sampling tool comprises a probe utilized to perform the actual sampling operation; the model is a homogeneous model; and inputs for the homogeneous model include geometric data related to a dimension or volume of an inlet of the probe. 16. A method, comprising: operating an apparatus to obtain a model predicting data associated with a theoretical sampling operation to be performed by a downhole sampling tool, wherein the predicted data comprises predicted water-cut and drawdown pressure data relative to time elapsed during the theoretical sampling operation, and wherein the mode
combined with sampling · CPC title
Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells · CPC title
and measuring fluid flow rate, i.e. permeation rate or pressure change · CPC title
Obtaining fluid samples or testing fluids, in boreholes or wells · CPC title
using side-wall fluid samplers or testers · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.