Real-Time Predictive Systems for Intelligent Energy Monitoring and Management of Electrical Electrical Power Networks
US-2015057821-A1 · Feb 26, 2015 · US
US10343630B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10343630-B2 |
| Application number | US-201715410451-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jan 19, 2017 |
| Priority date | Sep 6, 2016 |
| Publication date | Jul 9, 2019 |
| Grant date | Jul 9, 2019 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The present application discloses a monitoring method and apparatus. A specific implementation of the method comprises: reading information about monitoring data acquisition methods of monitored objects, the monitoring data acquisition method comprising an active acquisition method and a passive acquisition method; executing following steps for each of the monitored objects having the active acquisition method as the monitoring data acquisition method: generating a monitoring data acquisition task of the monitored object; determining a monitoring data acquisition frequency of the monitored object; and adding the monitoring data acquisition task to to-be-executed monitoring data acquisition task sets in a defined period corresponding to the monitoring data acquisition frequency; executing, in successive defined periods, monitoring data acquisition tasks in the corresponding to-be-executed monitoring data acquisition task sets; and parsing acquired monitoring data of the monitored objects to generate a monitoring result. The implementation solves the problem of high system resource occupation and waste of system resources during the monitoring process.
Opening claim text (preview).
What is claimed is: 1. A monitoring method, comprising: reading information about monitoring data acquisition methods of monitored objects, the monitoring data acquisition method comprising an active acquisition method and a passive acquisition method; executing following steps for each of the monitored objects having the active acquisition method as the monitoring data acquisition method: generating a monitoring data acquisition task of the monitored object; determining a monitoring data acquisition frequency of the monitored object; and adding the monitoring data acquisition task to to-be-executed monitoring data acquisition task sets in a defined period corresponding to the monitoring data acquisition frequency; executing, in successive defined periods, monitoring data acquisition tasks in the corresponding to-be-executed monitoring data acquisition task sets; and parsing acquired monitoring data of the monitored objects to generate a monitoring result. 2. The monitoring method according to claim 1 , further comprising: for each of the monitored objects having the passive acquisition method as the monitoring data acquisition method, detecting a monitoring data transmission request of the monitored object; and acquiring monitoring data of the monitored object in response to positively detecting the monitoring data transmission request of the monitored object. 3. The monitoring method according to claim 1 , wherein the parsing acquired monitoring data of the monitored objects to generate a monitoring result comprises: parsing acquired monitoring data of each of the monitored objects, to generate a monitoring sub-result of the monitored object; grouping the monitored objects according to a preset grouping method; analyzing monitoring sub-results of each group of monitored objects, to generate a group monitoring result of the group; and analyzing group monitoring results to generate the monitoring result. 4. The monitoring method according to claim 3 , wherein the parsing acquired monitoring data of the monitored objects to generate a monitoring result further comprises: for a preset monitored object in the monitored objects, in response to a monitoring sub-result of the preset monitored object indicating that monitoring data of the preset monitored object is abnormal, storing the abnormal monitoring data into a log file of the preset monitored object. 5. The monitoring method according to claim 1 , further comprising: outputting the monitoring result at a preset output time interval. 6. A monitoring apparatus, comprising: a reading unit, configured to read information about monitoring data acquisition methods of monitored objects, the monitoring data acquisition method comprising an active acquisition method and a passive acquisition method; a task processing unit, configured to execute following steps for each of the monitored objects having the active acquisition method as the monitoring data acquisition method: generating a monitoring data acquisition task of the monitored object; determining a monitoring data acquisition frequency of the monitored object; and adding the monitoring data acquisition task to to-be-monitored monitoring data acquisition task sets in a defined period corresponding to the monitoring data acquisition frequency; an execution unit, configured to execute, in successive defined periods, monitoring data acquisition tasks in the corresponding to-be-executed monitoring data acquisition task sets; and a parsing unit, configured to parse acquired monitoring data of the monitored objects to generate a monitoring result. 7. The monitoring apparatus according to claim 6 , further comprising: a detecting unit, configured to: for each of the monitored objects having the passive acquisition method as the monitoring data acquisition method, detect a monitoring data transmission request of the monitored object; and acquire monitoring data of the monitored object in response to positively detecting the monitoring data transmission request of the monitored object. 8. The monitoring apparatus according to claim 6 , wherein the parsing unit comprises: a parsing module, configured to parse acquired monitoring data of each of the monitored objects, to generate a monitoring sub-result of the monitored object; a first analyzing module, configured to group the monitored objects according to a preset grouping method, and analyze monitoring sub-results of each group of monitored objects, to generate a group monitoring result of the group; and a second analyzing module, configured to analyze group monitoring results to generate the monitoring result. 9. The monitoring apparatus according to claim 8 , wherein the parsing module is further configured to: for a preset monitored object in the monitored objects, in response to a monitoring sub-result of the preset monitored object indicating that monitoring data of the preset monitored object is abnormal, store the abnormal monitoring data into a log file of the preset monitored object. 10. The monitoring apparatus according to claim 6 , further comprising: an outputting unit, configured to output the monitoring result at a preset output time interval. 11. A non-transitory storage medium storing one or more programs, the one or more programs when executed by a device, causing the device to perform a monitoring method, the monitoring method comprising: reading information about monitoring data acquisition methods of monitored objects, the monitoring data acquisition method comprising an active acquisition method and a passive acquisition method; executing following steps for each of the monitored objects having the active acquisition method as the monitoring data acquisition method: generating a monitoring data acquisition task of the monitored object; determining a monitoring data acquisition frequency of the monitored object; and adding the monitoring data acquisition task to to-be-executed monitoring data acquisition task sets in a defined period corresponding to the monitoring data acquisition frequency; executing, in successive defined periods, monitoring data acquisition tasks in the corresponding to-be-executed monitoring data acquisition task sets; and parsing acquired monitoring data of the monitored objects to generate a monitoring result.
communicating information to a remotely located station (transmission systems for measured values G08C) · CPC title
Checking intermittently signalling or alarm systems · CPC title
Registering performance data (recording measured values G01D; information storage G11B) · CPC title
for measuring vehicle parameters and indicating critical, abnormal or dangerous conditions · CPC title
characterized by the autonomous decision making process, e.g. artificial intelligence, predefined behaviours (using knowledge based models G06N5/00) · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.