Oilfield tubular spin-in and spin-out detection for making-up and breaking-out tubular strings

US10329857B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10329857-B2
Application numberUS-201615186272-A
CountryUS
Kind codeB2
Filing dateJun 17, 2016
Priority dateSep 8, 2006
Publication dateJun 25, 2019
Grant dateJun 25, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Methods for making a threaded connection between an upper tubular and a lower tubular using an oilfield tubular spinner and a torque wrench, including holding the lower tubular with the torque wrench, frictionally engaging the upper tubular with the tubular spinner, operating a motor of the tubular spinner to spin-in and shoulder-up a tubular connection between the upper tubular and the lower tubular, establishing a threshold hydraulic system pressure that indicates a shouldered-up condition, monitoring, with a detection system, a hydraulic system pressure of the motor during spin-in and shoulder-up, and maintaining the threshold hydraulic system pressure to operate the motor for a selected period of time after the threshold hydraulic system pressure is reached. An oilfield tubular spinner for an oilfield tubular wrench is also provided.

First claim

Opening claim text (preview).

What is claimed is: 1. A method for making up a threaded connection between an upper tubular and a lower tubular using a low-torque oilfield tubular spinner and a high-torque torque wrench, the low-torque and high-torque being relative to each other, the method comprising: holding the lower tubular with the high-torque torque wrench; frictionally engaging the upper tubular with the low-torque tubular spinner; operating a motor of the low-torque tubular spinner to spin-in and shoulder-up a tubular connection between the upper tubular and the lower tubular; establishing a threshold hydraulic system pressure that indicates a shouldered-up condition, wherein the threshold hydraulic system pressure is substantially equal to a maximum hydraulic system pressure; monitoring, with a detection system, a hydraulic system pressure of the motor during spin-in and shoulder-up; detecting the shouldered-up condition, with the detection system, when the maximum hydraulic system pressure is substantially reached; and maintaining the threshold hydraulic system pressure to operate the motor for a selected period of time when the threshold hydraulic system pressure is reached. 2. The method of claim 1 , wherein the motor comprises a hydraulic system driving motor. 3. The method of claim 2 , wherein monitoring comprises comparing a measured hydraulic system pressure to the threshold hydraulic system pressure. 4. The method of claim 2 , wherein the hydraulic system pressure is monitored to detect a slip condition prior to shouldering-up. 5. The method of claim 4 , which further comprises shutting down the motor after the detection system determines that a hydraulic system pressure below the threshold hydraulic system pressure has been maintained for a selected period of time, indicating that a slip condition has occurred. 6. The method of claim 2 , wherein the motor comprises a plurality of spin motors associated with the rollers to reduce a load on each of the spin motors. 7. The method of claim 1 , which further comprises monitoring a period of time for operation of the motor suitable for substantially establishing a shouldered-up condition. 8. The method of claim 1 , which further comprises tightening the tubular connection with the high-torque torque wrench after spin-in and shoulder-up. 9. The method of claim 1 , wherein the high-torque torque wrench is selected to comprise tongs and the low-torque tubular spinner is selected to comprise a plurality of rollers. 10. The method of claim 1 , wherein the high-torque torque wrench is adapted to grip and rotate the lower tubular and the low-torque tubular spinner is selected to frictionally engage and rotate the upper tubular. 11. The method of claim 1 , wherein the hydraulic system pressure jumps to an initial operating pressure when the low-torque tubular spinner is engaged, and then gradually increases as the upper and lower tubulars are threaded together. 12. The method of claim 1 , wherein the threshold hydraulic system pressure comprises a plateau in the hydraulic system pressure.

Assignees

Inventors

Classifications

  • with straight threads · CPC title

  • motor actuated (E21B19/162 and E21B19/163 take precedence) · CPC title

  • Repairing or joining pipes on or under water · CPC title

  • E21B19/168Primary

    using a spinner with rollers or a belt adapted to engage a well pipe · CPC title

  • Control or monitoring arrangements therefor · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10329857B2 cover?
Methods for making a threaded connection between an upper tubular and a lower tubular using an oilfield tubular spinner and a torque wrench, including holding the lower tubular with the torque wrench, frictionally engaging the upper tubular with the tubular spinner, operating a motor of the tubular spinner to spin-in and shoulder-up a tubular connection between the upper tubular and the lower t…
Who is the assignee on this patent?
Canrig Drilling Tech Ltd, Nabors Drilling Tech Usa Inc
What technology area does this patent fall under?
Primary CPC classification E21B19/168. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Jun 25 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).