Interstrand short circuit testing of stator winding bars of electric machines
US-2017299646-A1 · Oct 19, 2017 · US
US10317453B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10317453-B2 |
| Application number | US-201816006880-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jun 13, 2018 |
| Priority date | Nov 3, 2014 |
| Publication date | Jun 11, 2019 |
| Grant date | Jun 11, 2019 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
An apparatus and method of detecting movement of a plunger of the solenoid includes detecting a peak (IPEAK) in a current signal applied to a coil of the solenoid. A predetermined threshold is added to the current signal applied to the coil of the solenoid to generate a level shifted signal. The level shifted signal and the peak signal are compared to detect movement of a plunger of the solenoid.
Opening claim text (preview).
The invention claimed is: 1. A method of detecting movement of a plunger of a solenoid comprising: detecting a peak (I PEAK ) in a current signal applied to a coil of the solenoid; detecting a valley in the current signal applied to the coil of the solenoid to generate a valley signal (I VALLEY ); adding a predetermined threshold to the current signal applied to the coil of the solenoid to generate a level shifted signal; comparing the level shifted signal and the peak signal to detect movement of a plunger of the solenoid; wherein the threshold is related to an absolute value of the difference between I PEAK and I VALLEY . 2. The method of claim 1 within the threshold is determined by measuring characteristics of the solenoid. 3. A method of detecting movement of a plunger of a solenoid comprising: detecting a peak (I PEAK ) in a current signal applied to a coil of the solenoid; detecting a valley in the current signal applied to the coil of the solenoid to generate a valley signal (I VALLEY ); adding a predetermined threshold to the current signal applied to the coil of the solenoid to generate a level shifted signal; comparing the level shifted signal and the peak signal to detect movement of a plunger of the solenoid; wherein if the current signal does not have a dip at least equal to the predetermined threshold, a fault signal is generated. 4. A method of detecting movement of a plunger of a solenoid comprising: detecting a peak (I PEAK ) in a current signal applied to a coil of the solenoid; detecting a valley in the current signal applied to the coil of the solenoid to generate a valley signal (I VALLEY ); adding a predetermined threshold to the current signal applied to the coil of the solenoid to generate a level shifted signal; comparing the level shifted signal and the peak signal to detect movement of a plunger of the solenoid; wherein if the current signal has a dip at least equal to the predetermined threshold, current to the solenoid is reduced to its hold value. 5. The method of claim 4 wherein the threshold is added to a voltage representing coil current which is compared with an output of an active peak detector, if the level shifted voltage matches the output of the active peak detector, complete solenoid movement has been detected. 6. The method of claim 3 wherein a dip less than the threshold indicates an unacceptably slower plunger movement. 7. In a system for operating a solenoid, a circuit to detect complete movement of a plunger of a solenoid, comprising: a device for measuring current through the solenoid and generating a first current signal; an active peak detector circuit receiving the first current signal for detecting a peak thereof and generating a peak detection signal; a level shifter circuit coupled in parallel with the active peak detector and receiving the first current signal, the level shifter circuit adding a threshold voltage to the first current signal to generate a level shifted signal; and a comparator comparing the peak detection signal with the level shifted signal, whereby if the level shifted signal matches the peak detection signal, complete movement of the solenoid is detected; wherein the threshold is related to an absolute value of the difference between a current peak and a current valley. 8. In a system for operating a solenoid, a circuit to detect complete movement of a plunger of a solenoid, comprising: a device for measuring current through the solenoid and generating a first current signal; an active peak detector circuit receiving the first current signal for detecting a peak thereof and generating a peak detection signal; a level shifter circuit coupled in parallel with the active peak detector and receiving the first current signal, the level shifter circuit adding a threshold voltage to the first current signal to generate a level shifted signal; and a comparator comparing the peak detection signal with the level shifted signal, whereby if the level shifted signal matches the peak detection signal, complete movement of the solenoid is detected; wherein the threshold is determined by measuring characteristics of the solenoid. 9. In a system for operating a solenoid, a circuit to detect complete movement of a plunger of the solenoid, comprising: a device for measuring current through the solenoid and generating a first current signal; an active peak detector circuit receiving the first current signal for detecting a peak thereof and generating a peak detection signal; a level shifter circuit coupled in parallel with the active peak detector and receiving the first current signal, the level shifter circuit adding a threshold voltage to the first current signal to generate a level shifted signal; and a comparator comparing the peak detection signal with the level shifted signal, whereby if the level shifted signal matches the peak detection signal, complete movement of the solenoid is detected; wherein if the first current signal does not have a dip at least equal to the predetermined threshold, a fault signal is generated. 10. In a system for operating a solenoid, a circuit to detect complete movement of a plunger of the solenoid, comprising: a device for measuring current through the solenoid and generating a first current signal; an active peak detector circuit receiving the first current signal for detecting a peak thereof and generating a peak detection signal; a level shifter circuit coupled in parallel with the active peak detector and receiving the first current signal, the level shifter circuit adding a threshold voltage to the first current signal to generate a level shifted signal; and a comparator comparing the peak detection signal with the level shifted signal, whereby if the level shifted signal matches the peak detection signal, complete movement of the solenoid is detected; wherein if the first current signal does not have a dip at least equal to the predetermined threshold, the solenoid current controller continues to drive the solenoid at its nominal current. 11. In a system for operating a solenoid, a circuit to detect complete movement of a plunger of the solenoid, comprising: a device for measuring current through the solenoid and generating a first current signal; an active peak detector circuit receiving the first current signal for detecting a peak thereof and generating a peak detection signal; a level shifter circuit coupled in parallel with the active peak detector and receiving the first current signal, the level shifter circuit adding a threshold voltage to the first current signal to generate a level shifted signal; and a comparator comparing the peak detection signal with the level shifted signal, whereby if the level shifted signal matches the peak detection signal, complete movement of the solenoid is detected; wherein if the first current signal has a dip at least equal to the predetermined threshold, current to the solenoid is reduced to its hold value. 12. In a system for operating a solenoid, a circuit to detect complete movement of a plunger of the solenoid, comprising: a device for measuring current through the solenoid and generating a first current signal; an active peak detector circuit receiving the first current signal for detecting a peak thereof and generating a peak detection signal; a level shifter circuit coupled in parallel with the active peak detector and receiving the first current signal, the level shifter circuit adding a threshold voltage to the first current signal to generate a level shifted signal; and a comparator comparing the peak detection signal with the level shifted signal, whereby if the level s
Monitoring or fail-safe circuits (for relays H01H47/002) · CPC title
with armature position measurement · CPC title
Testing of circuits in sensor or actuator systems (testing of apparatus for measuring electric or magnetic variables G01R35/00; testing of indicating or recording apparatus G01D; in airbag systems B60R21/0173; checking gas analysers G01N33/007; monitoring or fail-safe circuits for electromagnets H01F7/1844) · CPC title
Physics · mapped topic
by influencing the self-induction of one or more coils (G01D5/22 takes precedence) · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.