Detection of plunger movement in DC solenoids through current sense technique

US10317453B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10317453-B2
Application numberUS-201816006880-A
CountryUS
Kind codeB2
Filing dateJun 13, 2018
Priority dateNov 3, 2014
Publication dateJun 11, 2019
Grant dateJun 11, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

An apparatus and method of detecting movement of a plunger of the solenoid includes detecting a peak (IPEAK) in a current signal applied to a coil of the solenoid. A predetermined threshold is added to the current signal applied to the coil of the solenoid to generate a level shifted signal. The level shifted signal and the peak signal are compared to detect movement of a plunger of the solenoid.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method of detecting movement of a plunger of a solenoid comprising: detecting a peak (I PEAK ) in a current signal applied to a coil of the solenoid; detecting a valley in the current signal applied to the coil of the solenoid to generate a valley signal (I VALLEY ); adding a predetermined threshold to the current signal applied to the coil of the solenoid to generate a level shifted signal; comparing the level shifted signal and the peak signal to detect movement of a plunger of the solenoid; wherein the threshold is related to an absolute value of the difference between I PEAK and I VALLEY . 2. The method of claim 1 within the threshold is determined by measuring characteristics of the solenoid. 3. A method of detecting movement of a plunger of a solenoid comprising: detecting a peak (I PEAK ) in a current signal applied to a coil of the solenoid; detecting a valley in the current signal applied to the coil of the solenoid to generate a valley signal (I VALLEY ); adding a predetermined threshold to the current signal applied to the coil of the solenoid to generate a level shifted signal; comparing the level shifted signal and the peak signal to detect movement of a plunger of the solenoid; wherein if the current signal does not have a dip at least equal to the predetermined threshold, a fault signal is generated. 4. A method of detecting movement of a plunger of a solenoid comprising: detecting a peak (I PEAK ) in a current signal applied to a coil of the solenoid; detecting a valley in the current signal applied to the coil of the solenoid to generate a valley signal (I VALLEY ); adding a predetermined threshold to the current signal applied to the coil of the solenoid to generate a level shifted signal; comparing the level shifted signal and the peak signal to detect movement of a plunger of the solenoid; wherein if the current signal has a dip at least equal to the predetermined threshold, current to the solenoid is reduced to its hold value. 5. The method of claim 4 wherein the threshold is added to a voltage representing coil current which is compared with an output of an active peak detector, if the level shifted voltage matches the output of the active peak detector, complete solenoid movement has been detected. 6. The method of claim 3 wherein a dip less than the threshold indicates an unacceptably slower plunger movement. 7. In a system for operating a solenoid, a circuit to detect complete movement of a plunger of a solenoid, comprising: a device for measuring current through the solenoid and generating a first current signal; an active peak detector circuit receiving the first current signal for detecting a peak thereof and generating a peak detection signal; a level shifter circuit coupled in parallel with the active peak detector and receiving the first current signal, the level shifter circuit adding a threshold voltage to the first current signal to generate a level shifted signal; and a comparator comparing the peak detection signal with the level shifted signal, whereby if the level shifted signal matches the peak detection signal, complete movement of the solenoid is detected; wherein the threshold is related to an absolute value of the difference between a current peak and a current valley. 8. In a system for operating a solenoid, a circuit to detect complete movement of a plunger of a solenoid, comprising: a device for measuring current through the solenoid and generating a first current signal; an active peak detector circuit receiving the first current signal for detecting a peak thereof and generating a peak detection signal; a level shifter circuit coupled in parallel with the active peak detector and receiving the first current signal, the level shifter circuit adding a threshold voltage to the first current signal to generate a level shifted signal; and a comparator comparing the peak detection signal with the level shifted signal, whereby if the level shifted signal matches the peak detection signal, complete movement of the solenoid is detected; wherein the threshold is determined by measuring characteristics of the solenoid. 9. In a system for operating a solenoid, a circuit to detect complete movement of a plunger of the solenoid, comprising: a device for measuring current through the solenoid and generating a first current signal; an active peak detector circuit receiving the first current signal for detecting a peak thereof and generating a peak detection signal; a level shifter circuit coupled in parallel with the active peak detector and receiving the first current signal, the level shifter circuit adding a threshold voltage to the first current signal to generate a level shifted signal; and a comparator comparing the peak detection signal with the level shifted signal, whereby if the level shifted signal matches the peak detection signal, complete movement of the solenoid is detected; wherein if the first current signal does not have a dip at least equal to the predetermined threshold, a fault signal is generated. 10. In a system for operating a solenoid, a circuit to detect complete movement of a plunger of the solenoid, comprising: a device for measuring current through the solenoid and generating a first current signal; an active peak detector circuit receiving the first current signal for detecting a peak thereof and generating a peak detection signal; a level shifter circuit coupled in parallel with the active peak detector and receiving the first current signal, the level shifter circuit adding a threshold voltage to the first current signal to generate a level shifted signal; and a comparator comparing the peak detection signal with the level shifted signal, whereby if the level shifted signal matches the peak detection signal, complete movement of the solenoid is detected; wherein if the first current signal does not have a dip at least equal to the predetermined threshold, the solenoid current controller continues to drive the solenoid at its nominal current. 11. In a system for operating a solenoid, a circuit to detect complete movement of a plunger of the solenoid, comprising: a device for measuring current through the solenoid and generating a first current signal; an active peak detector circuit receiving the first current signal for detecting a peak thereof and generating a peak detection signal; a level shifter circuit coupled in parallel with the active peak detector and receiving the first current signal, the level shifter circuit adding a threshold voltage to the first current signal to generate a level shifted signal; and a comparator comparing the peak detection signal with the level shifted signal, whereby if the level shifted signal matches the peak detection signal, complete movement of the solenoid is detected; wherein if the first current signal has a dip at least equal to the predetermined threshold, current to the solenoid is reduced to its hold value. 12. In a system for operating a solenoid, a circuit to detect complete movement of a plunger of the solenoid, comprising: a device for measuring current through the solenoid and generating a first current signal; an active peak detector circuit receiving the first current signal for detecting a peak thereof and generating a peak detection signal; a level shifter circuit coupled in parallel with the active peak detector and receiving the first current signal, the level shifter circuit adding a threshold voltage to the first current signal to generate a level shifted signal; and a comparator comparing the peak detection signal with the level shifted signal, whereby if the level s

Assignees

Inventors

Classifications

  • Monitoring or fail-safe circuits (for relays H01H47/002) · CPC title

  • with armature position measurement · CPC title

  • Testing of circuits in sensor or actuator systems (testing of apparatus for measuring electric or magnetic variables G01R35/00; testing of indicating or recording apparatus G01D; in airbag systems B60R21/0173; checking gas analysers G01N33/007; monitoring or fail-safe circuits for electromagnets H01F7/1844) · CPC title

  • G01R31/06Primary

    Physics · mapped topic

  • G01D5/2006Primary

    by influencing the self-induction of one or more coils (G01D5/22 takes precedence) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10317453B2 cover?
An apparatus and method of detecting movement of a plunger of the solenoid includes detecting a peak (IPEAK) in a current signal applied to a coil of the solenoid. A predetermined threshold is added to the current signal applied to the coil of the solenoid to generate a level shifted signal. The level shifted signal and the peak signal are compared to detect movement of a plunger of the solenoid.
Who is the assignee on this patent?
Texas Instruments Inc
What technology area does this patent fall under?
Primary CPC classification G01R31/06. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Jun 11 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).