Method of constructing a reinforced compound concrete beam containing demolished concrete lumps

US10273691B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10273691-B2
Application numberUS-201816056384-A
CountryUS
Kind codeB2
Filing dateAug 6, 2018
Priority dateOct 31, 2014
Publication dateApr 30, 2019
Grant dateApr 30, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method of construction process of a reinforced compound concrete beam containing demolished concrete lumps comprising following steps. Form an I-shaped steel member with a discontinuous top flange by welding a bottom flange plate, a web and two steel plates. Set up a bottom die of the reinforced compound concrete beam. After hoisting the I-shaped steel member with the discontinuous top flange in position, bind longitudinal bars, waist bars and stirrups, and finally set up a side die. (2) Wet the demolished concrete lumps, pour the fresh concrete with a thickness of 20-30 mm inside a cavity formed by the bottom die and the side die, and then put a layer of the wet demolished concrete lumps in a gap between the two steel plates. The two steel plates are two rectangle steel plates or two trapezoid steel plates. Stir artificially so that the demolished concrete lumps are uniformly distributed inside the cavity formed by the bottom die and the side die. Pour a layer of fresh concrete into the cavity and vibrate the demolished concrete lumps and the fresh concrete in the cavity, so that the demolished concrete lumps are uniformly distributed in the fresh concrete. Repeatedly and alternately pour the fresh concrete and the demolished concrete lumps until the cavity is filled.

First claim

Opening claim text (preview).

What is claimed: 1. A method of constructing a reinforced compound concrete beam containing demolished concrete lumps, the method comprising: (1) forming an I-shaped steel member with a discontinuous top flange by welding one bottom flange plate and two steel plates to a web, preparing a bottom die portion of a die for casting the reinforced compound concrete beam, then hoisting the I-shaped steel member with the discontinuous top flange in position on the bottom die portion, and then binding together longitudinal bars, waist bars and stirrups, and finally setting up a side die portion of the die for casting the reinforced compound concrete beam; (2) wetting the demolished concrete lumps, pouring the fresh concrete to a thickness of 20-30 mm inside a cavity formed by the bottom die and the side die, and then putting a layer of the wet demolished concrete lumps in a gap between the two steel plates, the two steel plates being two rectangle steel plates or two trapezoid steel plates, and stirring the wet demolished concrete lumps so that the wet demolished concrete lumps are uniformly distributed inside the cavity formed by the bottom die and the side die, then pouring a layer of fresh concrete into the cavity formed by the bottom die and the side die and vibrating the wet demolished concrete lumps and the fresh concrete in the cavity formed by the bottom die and the side die, so that the wet demolished concrete lumps are uniformly distributed in the fresh concrete; repeatedly and alternately pouring the fresh concrete and the wet demolished concrete lumps until the cavity formed by the bottom die and the side die is filled.

Assignees

Inventors

Classifications

  • E04C3/293Primary

    the materials being steel and concrete (concrete with internal reinforcements or tensioning members E04C3/20) · CPC title

  • with substantially solid, i.e. unapertured, web (E04C3/10, E04C3/11 take precedence {honeycomb girders E04C3/083}) · CPC title

  • Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work (conveying in general B65G; lifting devices B66; working stone-like materials B28D; measuring instruments G01) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10273691B2 cover?
A method of construction process of a reinforced compound concrete beam containing demolished concrete lumps comprising following steps. Form an I-shaped steel member with a discontinuous top flange by welding a bottom flange plate, a web and two steel plates. Set up a bottom die of the reinforced compound concrete beam. After hoisting the I-shaped steel member with the discontinuous top flange…
Who is the assignee on this patent?
Univ South China Tech
What technology area does this patent fall under?
Primary CPC classification E04C3/293. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Apr 30 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).