Wind turbine foundation and wind turbine
US-9670909-B2 · Jun 6, 2017 · US
US10260480B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10260480-B2 |
| Application number | US-201615553963-A |
| Country | US |
| Kind code | B2 |
| Filing date | Feb 23, 2016 |
| Priority date | Feb 27, 2015 |
| Publication date | Apr 16, 2019 |
| Grant date | Apr 16, 2019 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A wind power installation foundation having a cylindrical central unit, a plurality of steel carriers which are arranged radially around the central unit and which respectively have a first and a second end, and a plurality of foundation piles. The first ends of the steel carriers are fixed to the central unit so that the second ends of the steel carriers are in the form of free ends. The second free ends of the steel carriers are respectively placed on one of the foundation piles.
Opening claim text (preview).
The invention claimed is: 1. A wind power installation pile foundation, comprising: a cylindrical central unit; a plurality of steel carriers arranged radially around the central unit and having first and second ends, respectively, wherein the first ends of the plurality of steel carriers are fixed to the central unit and the second ends of the steel carriers are free ends; a plurality of foundation piles at least partially in a ground, wherein the second free ends of the steel carriers are respectively placed on the plurality of foundation piles; and a plurality of precast concrete parts between adjacent steel carriers so that the precast concrete parts and the adjacent steel carriers, respectively, form a trough configured to be filled with at least one of: concrete, gravel or earth. 2. The wind power installation foundation as set forth in claim 1 , further comprising: a plurality of leveling plates arranged on the plurality of foundation piles and after suitable leveling, receive the second free ends of the plurality of steel carriers. 3. The wind power installation foundation as set forth in claim 1 wherein the central unit has a first end and a second end, wherein a lower pylon segment of a wind power installation or a pylon section is configured to be placed on the second end of the central unit. 4. The wind power installation foundation as set forth in claim 1 wherein the plurality of steel carriers have reinforcing struts in a region of the second ends. 5. The wind power installation foundation as set forth in claim 1 further comprising a plurality of foundation anchors, wherein the plurality of foundation piles have upper end regions and the foundation anchors are at the upper end regions and configured to fix the second ends of the plurality of steel carriers, respectively. 6. The wind power installation foundation as set forth in claim 5 wherein the plurality of foundation piles have a first, second, and third portions, wherein a diameter of the third portion is larger than a diameter of the first portion or a diameter of the second portion. 7. The wind power installation foundation as set forth in claim 6 wherein the first, second, and third portions of the plurality of foundation piles are each a tube shape. 8. The wind power installation foundation as set forth in claim 6 wherein the plurality of foundation piles, respectively, have a plurality of struts or bars extending in the longitudinal direction and at least one coil. 9. The wind power installation foundation as set forth in claim 6 wherein the plurality of foundation piles are filled with concrete. 10. A wind power installation, comprising: a wind power installation foundation as set forth in claim 1 . 11. A method of producing a wind power installation pile foundation, the method comprising: providing a cylindrical central unit; placing a plurality of steel carriers radially around the central unit, wherein the plurality of steel carriers have first and second ends, wherein the first ends of the plurality of steel carriers are fixed to the central unit and the second ends free ends; placing a plurality of foundation piles at least partially in a ground, wherein the second free ends of the steel carriers are respectively placed on the ends, projecting out of the ground, of the foundation piles; placing a plurality of precast concrete parts between adjacent steel carriers of the plurality of steel carriers so that at least one respective trough is formed by the precast concrete parts and the adjacent steel carriers; and filling the at least one trough with at least one of concrete, gravel or earth. 12. Use of a wind power installation foundation as set forth in claim 1 in a permafrost ground.
made of concrete or reinforced concrete or made of steel and concrete {(E02D5/50 takes precedence; assembled from segments E02D5/523; prestressed concrete E02D5/58)} · CPC title
Cast, i.e. in situ or in a mold or other formwork · CPC title
Concrete · CPC title
specially adapted for wind motors masts (wind motors per se F03D1/00) · CPC title
Steel alloys · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.