Process for constructing a volume mesh for modeling geological structures

US10254440B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10254440-B2
Application numberUS-201514603444-A
CountryUS
Kind codeB2
Filing dateJan 23, 2015
Priority dateJan 28, 2014
Publication dateApr 9, 2019
Grant dateApr 9, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Application in particular to exploration and to exploitation of oilfields.

First claim

Opening claim text (preview).

The invention claimed is: 1. A process for exploiting a subsurface formation to produce hydrocarbons comprising at least one sedimentary layer in at least one of a basin and a reservoir, the at least one sedimentary layer being limited vertically by two geological horizons and traversed by at least one fault, the at least one fault being based on a mathematical representation in a closed geometric domain of horizons and on the at least one fault in a Wheeler parametric space before deformation and rupture, wherein the Wheeler parametric space is a 3D parametric space in which any point has spatial coordinates and a time coordinate and with time being geological time comprising: a) determining curves by computing intersections between the mathematical representations of the horizons and of the at least one fault taken pairwise and between each of the mathematical representations of the horizons and boundaries of the closed domain, and vertically projecting the determined curves onto a reference surface; b) constructing a surface mesh including nodes and which is constrained by projection of the curves onto the reference surface; c) defining at each node of the surface mesh a vertical polygonal line of the node including at least one vertical segment delimited by intersections of the vertical line passing through the node, the representations of the horizons or the at least one fault; d) constructing a volume mesh by providing a vertical extension of the surface mesh along each vertical line; e) simulating at least one of the basin and the reservoir based on the volume mesh; f) determining a scheme for exploiting at least one of the basin and the reservoir based on at least one of the simulating the basin and simulating the reservoir and production forecasts from the reservoir; and g) exploiting the reservoir with the determined scheme by drilling at least one of a production well and an injector well to facilitate as part of production producing hydrocarbons from the reservoir. 2. A process according to claim 1 , wherein the reference surface is a horizontal plane in the Wheeler parametric space. 3. A process according to claim 1 , wherein the reference surface is a surface situated at ordinate t=0 in the Wheeler parametric space with t being time. 4. A process according to claim 1 , wherein the volume mesh is transposed into a geological space by a transformation method relating the Wheeler parametric space and the geological space. 5. A process according to claim 3 , wherein the volume mesh is transposed into a geological space via a transformation method relating the Wheeler parametric space and the geological space of the at least one sedimentary layer. 6. A process according to claim 1 , comprising: relocating nodes in the volume mesh. 7. A process according to claim 1 , wherein the surface mesh is a quad dominate mesh. 8. A process according to claim 1 , wherein the surface mesh is obtained by generating a triangular mesh constrained by the projections onto the reference surface and pairing adjacent triangles to form quadrilaterals. 9. A process according to claim 8 , comprising using an advancing front method to provide the triangular mesh. 10. A process according to claim 1 , wherein the vertical lines include at least one vertical segment limited by an intersection of a vertical line passing through one of the nodes with representations of horizons or the at least one fault. 11. A process according to claim 1 comprising: extruding vertically a surface element by simultaneously traversing vertical lines associated with the surface element, laterally linking ends of the vertical lines of a level and linking ends of the vertical lines at consecutive vertical levels to form volume elements, and for each volume element, if some nodes of one level do not belong to one fault or to a one fault on a same horizon, cutting each volume element according to at least one transverse plane passing through two consecutive levels. 12. A process according to claim 1 , comprising between steps a) and b): matching curves and points resulting from projection of boundaries by merging at least one of the curves and the points which have a spacing less than a predetermined threshold or addition of points at a level of intersections between curves.

Assignees

Inventors

Classifications

  • Geographic models · CPC title

  • Physics · mapped topic

  • G01V11/00Primary

    Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00 · CPC title

  • G01V1/28Primary

    Processing seismic data, e.g. for interpretation or for event detection (G01V1/48 takes precedence) · CPC title

  • Finite element generation, e.g. wire-frame surface description, {tesselation} · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10254440B2 cover?
Application in particular to exploration and to exploitation of oilfields.
Who is the assignee on this patent?
Ifp Energies Now
What technology area does this patent fall under?
Primary CPC classification G01V11/00. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Apr 09 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).