Water supplying method

US10248138B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10248138-B2
Application numberUS-201615171949-A
CountryUS
Kind codeB2
Filing dateJun 2, 2016
Priority dateJun 2, 2015
Publication dateApr 2, 2019
Grant dateApr 2, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Some embodiments may include a water supply system for supplying water based on a predetermined planned daily supply amount of water. While the worries supplied, it may be determined whether a second time has reached after a predetermined time passed from a first time. When it is determined that the second time has reached, an accumulated amount of the supplied water may be measured. A difference between the measured accumulated amount of the supplied water and the planned daily supply amount of water may be calculated. The planned daily supply amount of water may be corrected by adding the calculated difference to the planned daily supply amount of water after the second time. Water may be supplied based on the corrected planned daily supply amount of water.

First claim

Opening claim text (preview).

What is claimed is: 1. A method for supplying water based on a predetermined planned daily supply amount of water, the method comprising: measuring an accumulated amount of actually supplied water in real time with a predetermined periodicity; acquiring record data about the accumulated amount of actually supplied water after the accumulated amount of actually supplied water is measured; calculating a predicted daily demand amount of water based on the accumulated amount of actually supplied water according to a predetermined prediction method after the record data about the accumulated amount of actually supplied water is acquired; setting a planned daily supply amount of water based on the predicted daily demand amount of water after the predicted daily demand amount of water is calculated; supplying water from a water supply based on at least the planned daily supply amount of water; determining whether a second time has been reached after a predetermined time passed from a first time while performing the supplying of the water; measuring, when it is determined that the second time has been reached, an accumulated amount of the supplied water; calculating a difference between the measured accumulated amount of the supplied water and the planned daily supply amount of water; correcting the planned daily supply amount of water by adding the calculated difference to the planned daily supply amount of water; and supplying water from the water supply based on the corrected planned daily supply amount of water, wherein the method is performed under control of a controller, and wherein the planned daily supply amount of water includes plan information about the amount of water to be supplied between a current time at which the planned daily supply amount of water is calculated and a midnight of a date including the current time. 2. The method according to claim 1 , wherein the correcting comprises: determining whether the difference is greater than or equal to a predetermined amount of water; and adding, when it is determined that the difference is greater than or equal to the predetermined amount of water, the calculated difference to the planned daily supply amount of water, and maintaining the predetermined planned daily supply amount of water when it is determined that the difference is less than the predetermined amount of water. 3. The method according to claim 1 , wherein the correcting comprises: determining whether the planned daily supply amount of water obtained through the adding is greater than or equal to a predetermined upper water amount limit; and changing, when it is determined that the planned daily supply amount of water obtained through the adding is greater than or equal to the predetermined upper water amount limit, the planned daily supply amount of water obtained through the adding to the upper water amount limit, and maintaining the planned daily supply amount of water obtained through the adding when it is determined that the planned daily supply amount of water obtained through the adding is less than the predetermined upper water amount limit. 4. The method according to claim 1 , wherein the correcting comprises: determining whether the planned daily supply amount of water obtained through the adding is less than or equal to a predetermined lower water amount limit; and changing, when it is determined that the planned daily supply amount of water obtained through the adding is less than or equal to the predetermined lower water amount limit, the planned daily supply amount of water obtained through the adding to the lower water amount limit, and maintaining the planned daily supply amount of water obtained through the adding when it is determined that the planned daily supply amount of water obtained through the adding is greater than the predetermined lower water amount limit. 5. The method according to claim 1 , further comprising: calculating a plurality of first predicted demand amounts of water according to a plurality of combinations of applying a weight to each of a plurality of demand predictions; and calculating the difference between the measured accumulated amount of the supplied water and each of the predicted demand amounts of water and selecting a combination for calculating a second predicted demand amount of water including a smallest difference from among the predicted demand amounts of water; and correcting the planned daily supply amount of water after the second time according to the selected combination.

Assignees

Inventors

Classifications

  • for public or like main supply {for industrial use} · CPC title

  • Arrangements for supervising or controlling working operations · CPC title

  • G05D7/0676Primary

    by action on flow sources (G05D7/0688, G05D7/0694 take precedence) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10248138B2 cover?
Some embodiments may include a water supply system for supplying water based on a predetermined planned daily supply amount of water. While the worries supplied, it may be determined whether a second time has reached after a predetermined time passed from a first time. When it is determined that the second time has reached, an accumulated amount of the supplied water may be measured. A differen…
Who is the assignee on this patent?
Lsis Co Ltd
What technology area does this patent fall under?
Primary CPC classification G05D7/0676. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Apr 02 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).