Method for operating a steam power plant and steam power plant for conducting said method

US10208630B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10208630-B2
Application numberUS-201715402254-A
CountryUS
Kind codeB2
Filing dateJan 10, 2017
Priority dateJan 13, 2016
Publication dateFeb 19, 2019
Grant dateFeb 19, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A steam power plant and method for operation the steam power plant is provided, that comprises: a main water-steam-cycle with a high pressure (HP) steam turbine, an intermediate pressure (IP) steam turbine and a low pressure (LP) steam turbine, a condenser, and a feed water tank, wherein low pressure heaters are arranged between said condenser and said feed water tank and wherein a plurality of high pressure heaters are arranged downstream of said feed water tank, whereby said low pressure heaters, said feed water tank and said plurality of high pressure heaters are supplied with steam from a plurality of extractions at said steam turbines.

First claim

Opening claim text (preview).

What is claimed is: 1. A method for operating a steam power plant, said steam power plant comprising: a main water steam cycle with a high pressure steam turbine, an intermediate pressure steam turbine and a low pressure steam turbine; a condenser; and a feed water tank, wherein a plurality of low pressure heaters are arranged between said condenser and said feed water tank and wherein a plurality of high pressure heaters are arranged downstream of said feed water tank, whereby said low pressure heaters, said feed water tank and said plurality of high pressure heaters are supplied with steam from a plurality of extractions of said steam turbines, said method comprising the steps of: providing a steam storage tank within said steam power plant; storing, during a first operation period of said steam power plant, steam in said steam storage tank; discharging, during a second operation period of said steam power plant, steam stored in said steam storage tank, during said first operation period, into the main water steam cycle to save steam extracted from said plurality of extractions at said steam turbines; and wherein during said first operation period: steam extracted from said high pressure steam turbine is stored in said steam storage tank; a first of said plurality of high pressure heaters is supplied with steam extracted from said intermediate pressure steam turbine; steam is discharged into said first of said plurality of high pressure heaters from said steam storage tank during said second operation period of said steam power plant; and wherein said steam discharged from said steam storage tank into said first of said plurality of high pressure heaters during said second operation period is superheated with a steam extracted from said high pressure (HP) steam turbine. 2. The method of claim 1 , wherein said steam discharged from said steam storage tank into said first of said plurality of high pressure heaters during said second operation period is superheated with a hot reheat steam, which is available at an inlet of said intermediate pressure steam turbine. 3. The method of claim 1 , wherein said steam discharged from said steam storage tank into said first of said plurality of high pressure heaters during said second operation period is superheated with steam, which is extracted from said intermediate pressure steam turbine for supplying said first of said plurality of high pressure heaters. 4. The method of claim 1 , wherein during said first operation period steam extracted from said high pressure steam turbine is stored in said steam storage tank, said feed water tank is supplied with steam extracted from said intermediate pressure steam turbine, and steam is discharged into said feed water tank from said steam storage tank during said second operation period of said steam power plant. 5. The method of claim 4 , wherein said steam discharged from said steam storage tank into said feed water tank is superheated with a steam extracted from said high pressure steam turbine. 6. The method of claim 4 , wherein said steam discharged from said steam storage tank into said feed water tank is superheated with a hot reheat steam, which is available at an inlet of said intermediate pressure steam turbine. 7. The method of claim 4 , wherein a first of said plurality of high pressure heaters is supplied with steam extracted from said intermediate pressure steam turbine, and said steam discharged from said steam storage tank into said feed water tank is superheated with a steam, which is extracted from said intermediate pressure (IP) steam turbine for supplying said first of said plurality of high pressure heaters. 8. The method of claim 4 , wherein said steam discharged from said steam storage tank into said feed water tank is superheated with steam extracted from said intermediate pressure steam turbine for being supplied to said feed water tank. 9. A steam power plant, comprising: a steam-water-cycle with a high pressure steam turbine, an intermediate pressure steam turbine, and a low pressure steam turbine; a condenser; a feed water tank; a plurality of low pressure heaters arranged between said condenser and said feed water tank; a first and a second high pressure heater, wherein the first and the second high pressure heaters are arranged downstream of said feed water tank, whereby said low pressure heaters, said feed water tank and said first and second high pressure heaters are supplied with steam from a plurality of extractions at said steam turbines; a steam storage tank configured to input and output steam within the steam power plant, wherein said steam storage tank is operationally connected to a steam extraction at said high pressure steam turbine and said steam storage tank is configured to feed output steam to said first high pressure heater or said feed water tank and is operationally connected to said feed water tank; wherein steam extracted from said steam storage tank is superheated with steam extracted from said high pressure steam turbine, or hot reheat steam, which is available at an inlet of said intermediate pressure steam turbine, or steam extracted from said intermediate pressure steam turbine for supplying said first high pressure heater; and wherein steam extracted from said steam storage tank is superheated with steam extracted from said intermediate pressure steam turbine for supplying said feed water tank. 10. A method for superheating steam in a steam power plant, the method comprising: providing a steam storage tank within said steam power plant; extracting steam from a plurality of high pressure, intermediate pressure, and low pressure steam turbines within the steam power plant; storing the extracted steam in said steam storage tank during a first period of operation; supplying a first of a plurality of high pressure heaters located in the steam power plant with the extracted steam from said intermediate pressure steam turbines; discharging steam from said steam storage tank into said first of said plurality of high pressure heaters during a second period of operation; and superheating said steam discharged from said steam storage tank. 11. The method of claim 10 , wherein the steam discharged from the steam storage tank is superheated with cold reheat steam from the exit of said high pressure steam turbine. 12. The method of claim 10 , wherein the steam discharged from the steam storage tank is superheated with hot reheat steam supplied to the inlet of said intermediate pressure steam turbine. 13. The method of claim 10 , wherein the steam discharged from the steam storage tank is superheated with steam from extraction at said intermediate pressure steam turbine being supplied to said first of said plurality of high pressure heaters. 14. The method of claim 10 , further comprising integrating the steam from the steam storage tank at a feed water tank, wherein the pressure at the feed water tank is about 10 bars. 15. The method of claim 14 , wherein the steam discharged from the steam storage tank is superheated with steam extracted from said feed water tank.

Assignees

Inventors

Classifications

  • Use of steam for feed-water heating and another purpose · CPC title

  • Use of two or more feed-water heaters in series · CPC title

  • F01K3/26Primary

    with heating by steam · CPC title

  • having both steam accumulator and heater, e.g. superheating accumulator (steam superheaters per se F22G) · CPC title

  • F01K3/06Primary

    the engine being of extraction or non-condensing type {(F01K3/004 takes precedence)} · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10208630B2 cover?
A steam power plant and method for operation the steam power plant is provided, that comprises: a main water-steam-cycle with a high pressure (HP) steam turbine, an intermediate pressure (IP) steam turbine and a low pressure (LP) steam turbine, a condenser, and a feed water tank, wherein low pressure heaters are arranged between said condenser and said feed water tank and wherein a plurality of…
Who is the assignee on this patent?
General Electric Technology Gmbh, Gen Electric
What technology area does this patent fall under?
Primary CPC classification F01K3/26. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Feb 19 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).