Fluidic systems, devices and methods for inducing anisotropy in polymeric materials
US-12103216-B2 · Oct 1, 2024 · US
US10207448B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10207448-B2 |
| Application number | US-201314763854-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 29, 2013 |
| Priority date | Jan 28, 2013 |
| Publication date | Feb 19, 2019 |
| Grant date | Feb 19, 2019 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The invention relates to a method for the changing of material from a starting material to a subsequent material with an extrusion device ( 10 ) for the production of extrusion products ( 100 ) comprising the following steps: recognition of a change of material requirement, performance of at least one preparation step for the change of material, performance of the change of material after termination of at least one of the preparation steps.
Opening claim text (preview).
What is claimed is: 1. A method for the changing of material from a starting material to a subsequent material with an extrusion device for the production of extrusion products comprising the following steps: obtaining a parameter indicative of a time period required for at least emptying, cleaning and filling a storage tank which is connected by a downpipe to a storage scale feeding an extruder, performing a recognition of a requirement to a change of material, by monitoring a formulation amount and based on a prognosis of a still to be performed extrusion amount, based on said prognosis and said parameter, in response to the recognition and during a performance of a production of an extrusion product with a starting material by the extruder, calculating a time point in which a change of material preparation process needs to be started, at said calculated time point starting: driving at least one storage flap mechanically assembled to said downpipe connecting between said storage tank and said storage scale for emptying the starting material from the storage tank, cleaning of the storage tank from the starting material, and driving the at least one storage flap to a close state and filling the storagetank with the subsequent material. 2. The method according to claim 1 , further comprising at least emptying of the storage scale or the downpipe as a preparation step. 3. The method according to claim 1 , wherein the storage tank is a second smaller storage tank; further comprising switching from a first big storage tank with the starting material to the second smaller storage tank with the starting material and subsequently emptying of the first big storage tank and filling of the first big storage tank with the subsequent material as a preparation step. 4. The method according to claim 1 , wherein the cleaning comprises: activation of at least one knocking unit for releasing remaining parts of the starting material, activation of a purge system, reversing of the direction of rotation of a dosing screw, production of an air vortex, a cyclone-like air vortex, and production of a pressure wave or a negative pressure wave. 5. The method according to claim 1 , wherein the cleaning is performed with intermediate material. 6. The method according to claim 1 , further comprising requesting installation of necessary tanks, and correcting positioning of the material pipes. 7. An extrusion plant for the production of an extrusion product with at least one extrusion device, comprising: an extruder; a storage scale for feeding the extruder; at least one storage tank for feeding the storage scale; at least one downpipe connecting between said at least one storage tank and said storage scale; at least one sensor device for determining a filling level of at least one of the at least one storage tank and the storage scale; and a control unit that executes code instructions for: obtaining a parameter indicative of a time period required for at least emptying, cleaning and filling said at least one storage tank, performing a recognition of a requirement to a change of material, by monitoring a formulation amount and based on a prognosis of a still to be performed extrusion amount, based on said prognosis and said parameter, in response to the recognition and during a performance of a production of an extrusion product with a starting material by the extruder, calculating a time point in which a change of material preparation process needs to be started, at said calculated time point starting: driving at least one storage flap mechanically assembled to said at least one downpipe for emptying the starting material from said at least one storage tank, cleaning of the storage tank from the starting material; and driving the at least one storage flap to a close state and filling the storage tank with the subsequent material. 8. Extrusion plant according to claim 7 , wherein the at least one sensor device comprises at least one member of a group consisting of: ultrasound sensor infrared sensor optic sensor laser sensor load cell capacitive sensor inductive sensor rotor sensor swim sensor. 9. Extrusion plant according to claim 7 , wherein the cleaning is performed by at least one of the following configurations: knocking unit purge unit flexible tank wall porous screw cylinder hinged screw cylinder rotatable screw cylinder. 10. A method for the changing of material from a starting material to a subsequent material with an extrusion device for the production of extrusion products comprising: obtaining a parameter indicative of a time period required for at least emptying, cleaning and filling a storage tank which is connected by a downpipe to a storage scale feeding an extruder; in response to a recognition of a requirement to a change of material from a starting material to a subsequent material, calculating a time point in which a change of material preparation process needs to be started, based on an obtained parameter indicative of a time period required for said change of material preparation process; at said calculated time point; driving at least one storage flap mechanically assembled to said downpipe, to stop a feeding of the starting material to the storage scale; emptying the storage tank from the starting material; driving the at least one storage flap to a close state; and filling the storage tank with the subsequent material; wherein the recognition of the requirement, the emptying of the staring material and the filling of the subsequent material are conducted in parallel to a continuous feeding of the extruder by the storage scale with the starting material and a continuous production of an extrusion product with the starting material. 11. An extrusion plant for the production of an extrusion product with at least one extrusion device, comprising: an extruder; a storage scale for feeding the extruder; at least one storage tank for feeding the storage scale; at least one downpipe connecting between said at least one storage tank and said storage scale; at least one sensor device for determining a filling level of at least one of the at least one storage tank and the storage scale; and a control unit that executes code instructions for: in response to a recognition of a requirement to a change of material from a starting material to a subsequent material, calculating a time point in which a change of material preparation process needs to be started, based on an obtained parameter indicative of a time period required for said change of material preparation process; at said calculated time point; driving at least one storage flap mechanically assembled to said downpipe, to stop a feeding of the starting material to the storage scale; emptying the storage tank from the starting material; driving the at least one storage flap to a close state; and filling the storage tank with the subsequent material; wherein the recognition of the requirement, the emptying of the staring material and the filling of the subsequent material are conducted in parallel to a continuous feeding of the extruder by the storage scale with the starting material and a continuous production of an extrusion product with the starting material. 12. The method of claim 10 , further comprising a cleaning of the storage tank, conducted after the emptying of the storage tank from the starting material and before the filling of the storage tank with the subsequent material, said cleaning is conducted in parallel to the continuous feeding of the extruder by the storage scale with the starting material and the continuous producti
of feeding units · CPC title
Measuring, controlling or regulating · CPC title
Start-up, shut-down or parameter setting phase; Emergency shut-down; Material change; Test or laboratory equipment or studies · CPC title
Material change · CPC title
Raw material dosing · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.