Method and filling system for filling containers

US10179725B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10179725-B2
Application numberUS-201314775804-A
CountryUS
Kind codeB2
Filing dateSep 28, 2013
Priority dateMar 14, 2013
Publication dateJan 15, 2019
Grant dateJan 15, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

An apparatus for processing a container that contains liquid filling-material includes a source of inert gas at a treatment pressure that is higher than a fill pressure that is used to fill said container, and filling elements. A typical filling element includes a housing, and a first controlled gas path that selectively connects the source to the container.

First claim

Opening claim text (preview).

Having described the invention, and a preferred embodiment thereof, what is claimed as new, and secured by Letters Patent is: 1. A method for processing a container that has been pre-tensioned, said container being in a sealed position against a filling element, said method comprising: pressure-filling said container with liquid filling-material, said container being maintained at a filling pressure; upon completion of said pressure-filling, while said container is in said sealed position, carrying out a pressure-treatment of said liquid filling-material; and relieving pressure in said container to ambient pressure; wherein carrying out said pressure treatment comprises raising internal pressure within an interior of said container to a treatment pressure that is higher than said filling pressure, wherein raising said internal pressure comprises introducing gas into a head space of said container, and wherein, after having raised said internal pressure, testing said container for leaks, wherein testing said container for leaks comprises connecting, wherein connecting comprises connecting said interior to a gas source, allowing said gas source to fill said interior until a pressure within said interior reaches said treatment pressure, disconnecting said source from said interior, and, during the course of a testing interval, monitoring for evidence of leakage from said container. 2. The method of claim 1 , wherein carrying out said pressure treatment comprises carrying out said pressure treatment for an interval that is shorter than a time required for completion of said pressure-filling. 3. The method of claim 1 , wherein carrying out said pressure treatment comprises carrying out said pressure treatment for an interval that is between 0.5 seconds and 3 seconds. 4. The method of claim 1 , further comprising maintaining said treatment pressure to be between 1.5 times said filling pressure and 2.5 times said filling pressure. 5. The method of claim 1 , wherein carrying out pressure treatment comprises causing a pressure rise within said interior, wherein said pressure rise is between 0.5 bar and 3.0 bar. 6. The method of claim 1 , further comprising, prior to pressure-filling said container with liquid filling-material, causing gas to pass into said container from a gas reservoir, and, after causing said gas to pass into said container, returning gas that is in said container to said gas reservoir. 7. The method of claim 1 , wherein introducing gas into said head space comprises introducing a gas selected from the group consisting of carbon dioxide, nitrogen, and sterile air. 8. The method of claim 1 , wherein monitoring for evidence of leakage comprises monitoring a rate of change of pressure within said container. 9. The method of claim 1 , wherein monitoring for evidence of leakage comprises inspecting an outer surface of said container. 10. The method of claim 9 , further comprising using a camera for inspecting said outer surface. 11. The method of claim 1 , wherein monitoring for evidence of leakage comprises, using a pressure sensor, monitoring pressure in said container. 12. The method of claim 1 , wherein testing said container for leaks occurs with said container arranged in said sealed position against said filling element. 13. The method of claim 1 , wherein said treatment pressure is greater than said filling pressure used in pressure-filling said container. 14. The method of claim 13 , wherein said treatment pressure is between 1.5 times said filling pressure and 2.5 times said filling pressure. 15. The method of claim 1 , wherein connecting comprises connecting said interior to a channel that transports a treatment gas at said treatment pressure. 16. The method of claim 1 , wherein said designated level is selected such that filling is completed prior to testing said container for leaks. 17. The method of claim 1 , further comprising determining that no leak is present, and resuming filling of said container. 18. An apparatus that has been specifically designed for carrying out a process of processing a container that has been pre-tensioned, said container being in a sealed position against a filling element, wherein processing said container comprises pressure-filling said container with liquid filling-material, said container being maintained at a filling pressure, upon completion of said pressure-filling, while said container is in said sealed position, carrying out a pressure-treatment of said liquid filling-material, and relieving pressure in said container to ambient pressure, wherein carrying out said pressure treatment comprises raising internal pressure in said container to a treatment pressure that is higher than said filling pressure, and wherein raising said internal pressure comprises introducing gas into a head space of said container, and wherein, after having raised said internal pressure, testing said container for leaks, wherein testing said container for leaks comprises connecting, wherein connecting comprises connecting said interior to a gas source, allowing said gas source to fill said interior until a pressure within said interior reaches said treatment pressure, disconnecting said source from said interior, and, during the course of a testing interval, monitoring for evidence of leakage from said container, wherein said apparatus comprises a source of said gas at said filling pressure, wherein said filling element is one of a plurality of filling elements, wherein a first filling element from said plurality of filling elements comprises a housing and a first controlled gas path, wherein said filling element provides controlled dispensing of liquid filling-material into said container, wherein said first controlled gas path is formed in said housing, and wherein said first controlled gas path selectively connects said source with said container, wherein said apparatus further comprises means for testing said container for leaks by connecting said interior to a gas source, said means for testing said container comprising means for allowing said gas source to fill said interior until a pressure within said interior reaches said treatment pressure, means for disconnecting said source from said interior, and means for monitoring for evidence of leakage from said container during a testing interval. 19. The apparatus of claim 18 , wherein said source comprises a joint channel that connects to each filling element in said plurality of filling elements. 20. The apparatus of claim 18 , further comprising a second controlled gas path, and a collection chamber, wherein said collection chamber is connected to all filling elements in said plurality of filling elements, wherein said second controlled gas path is selectively connected to said collection chamber such that an interior of said container can be selectively connected to said collection chamber, wherein said second controlled gas path is configured to permit escape of gases used in rinsing and pre-tensioning of said containers.

Assignees

Inventors

Classifications

  • B67C3/2614Primary

    specially adapted for counter-pressure filling · CPC title

  • Pressure-control devices · CPC title

  • for verifying the internal pressure of closed containers · CPC title

  • without electrodes · CPC title

  • Means for preventing foaming of the liquid · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10179725B2 cover?
An apparatus for processing a container that contains liquid filling-material includes a source of inert gas at a treatment pressure that is higher than a fill pressure that is used to fill said container, and filling elements. A typical filling element includes a housing, and a first controlled gas path that selectively connects the source to the container.
Who is the assignee on this patent?
Khs Gmbh
What technology area does this patent fall under?
Primary CPC classification B67C3/2614. Mapped technology areas include Operations & Transport.
When was this patent published?
Publication date Tue Jan 15 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).