Power demand control device, power demand control method, power demand control system, and recording medium

US10175710B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10175710-B2
Application numberUS-201515122293-A
CountryUS
Kind codeB2
Filing dateFeb 4, 2015
Priority dateMar 5, 2014
Publication dateJan 8, 2019
Grant dateJan 8, 2019

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

An electric power demand control system selects a presswork device as a target of electric power demand control in a case where the ratio of the total time length of a non-working state of the presswork device within a time period to the total time length of a working state of the presswork device within the time period is larger than a threshold. This makes it possible to alleviate, for example, (i) a decrease in production efficiency caused by electric power demand control at a facility at which production lines are installed and (ii) environmental deterioration due to electric power demand control.

First claim

Opening claim text (preview).

The invention claimed is: 1. An electric power demand control device, comprising a processor configured with a program to implement: a necessity determining section configured to determine whether electric power demand control is necessary for a facility in which a plurality of loads are installed; an inquiry section configured to, for each of the plurality of loads, when the necessity determining section has determined that the electric power demand control is necessary, inquire whether one of the plurality of loads is selectable as a target of the electric power demand control; a generating section configured to generate, for each of the plurality of loads, (i) a total time length of a working state of one of the plurality of loads within a time period and (ii) a total time length of a non-working state of the one of the plurality of loads-within the time period; a determining section configured to determine, for each of the plurality of loads, based on a ratio of the total time length of the non-working state to the total time length of the working state and a threshold for the ratio, whether to select the one of the plurality of loads as a target of electric power demand control; an instructing section configured to, for each of the plurality of loads, when the instructing section has received from the notifying section a notification that the one of the plurality of loads is selected as the target of the electric power demand control, instruct the one of the plurality of loads to shift to the non-working state; and a notifying section configured to, when the notifying section has been inquired of by the inquiry section, notify the instructing section of a result of the determination by the determining section. 2. The electric power demand control device according to claim 1 , wherein the generating section generates the total time length of the working state and the total time length of the non-working state based on (i) electric power consumed by the one of the plurality of loads in the working state and (ii) electric power consumed by the one of the plurality of loads in the non-working state. 3. The electric power demand control device according to claim 1 , wherein the determining section determines to select the one of the plurality of loads as the target of the electric power demand control when the ratio is larger than the threshold. 4. A non-transitory computer-readable recording medium in which a program is stored, wherein the program is configured to cause a computer to function as the electric power demand control device according to claim 1 . 5. An electric power demand control system, comprising: a determining device; and an instructing device, the instructing device comprising a processor configured with a program to implement: a necessity determining section configured to determine whether electric power demand control is necessary for a facility in which a plurality of loads are installed; an inquiry section configured to, for each of the plurality of loads, when the necessity determining section has determined that the electric power demand control is necessary, inquire of the determining device whether one of the plurality of loads is selectable as a target of the electric power demand control; and an instructing section configured to, when the instructing section has received from the determining device a notification that the one of the plurality of loads is selected as the target of the electric power demand control, instruct the one of the plurality of loads to shift to a non-working state, the determining device comprising a processor configured with a program to implement: a generating section configured to generate, for each of the plurality of loads, (i) a total time length of a working state of the one of the plurality of loads within a time period and (ii) a total time length of the non-working state of the one of the plurality of loads within the time period; a determining section configured to determine, based on a ratio of the total time length of the non-working state to the total time length of the working state and a threshold for the ratio, whether to select the one of the plurality of loads as the target of the electric power demand control; and a notifying section configured to, when the notifying section has been inquired of by the instructing device, notify the instructing device of a result of the determination by the determining section. 6. The electric power demand control system according to claim 5 , wherein the determining section determines to select the one of the plurality of loads as the target of the electric power demand control when the ratio is larger than the threshold. 7. The electric power demand control system according to claim 6 , wherein the instructing device further comprises a providing section configured to provide the determining device with the threshold for use by the determining device. 8. The electric power demand control system according to claim 7 , wherein the necessity determining section, when total electric power consumed at the facility within a time period is larger than a target electric power consumption, determines that the electric power demand control is necessary. 9. The electric power demand control system according to claim 7 , wherein: the processor is configured with the program to implement the necessity determining section such that: the necessity determining section, after the instructing section has instructed the one of the plurality of loads to shift to the non-working state, determines again whether the electric power demand control is necessary; and the providing section, when the necessity determining section has determined again that the electric power demand control is necessary, provides each of the plurality of loads with an updated threshold smaller than the threshold. 10. The electric power demand control system according to claim 5 , wherein the processor is further configured with the program to implement: an electric power consumption determining section configured to determine electric power consumed by the one of the plurality of loads after the one of the plurality of loads has shifted to the non-working state. 11. The electric power demand control system according to claim 5 , wherein: the one of the plurality of loads is connected to an other device that operates in conjunction with the one of the plurality of loads; the one of the plurality of loads, after the one of the plurality of loads has been instructed to shift to the non-working state, shifts to the non-working state and notifies the other device that electric power consumed by the one of the plurality of loads has decreased; and the other device shifts to the non-working state after the other device has been notified that the electric power consumed by the one of the plurality of loads has decreased. 12. The electric power demand control system according to claim 11 , wherein the other device is (i) an open-close valve for compressed air, (ii) a power supply device for an exhaust duct, (iii) a power supply device for air conditioning, or (iv) a control device for the air conditioning. 13. The electric power demand control system according to claim 5 , wherein the determining device is disposed in the one of the plurality of loads. 14. An electric power demand control method, comprising the steps of, for each load in a plurality of loads: (a) determining whether electric power demand control is necessary for a facility in which the plurality of loads are installed; (b) inquiring, for each of the plurality of loads, when i

Assignees

Inventors

Classifications

  • Demand response systems, e.g. load shedding, peak shaving · CPC title

  • Demand response systems, e.g. load shedding, peak shaving · CPC title

  • G05F1/66Primary

    Regulating electric power · CPC title

  • Power metrics, energy efficiency · CPC title

  • using digital processors (G05B19/05 takes precedence) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10175710B2 cover?
An electric power demand control system selects a presswork device as a target of electric power demand control in a case where the ratio of the total time length of a non-working state of the presswork device within a time period to the total time length of a working state of the presswork device within the time period is larger than a threshold. This makes it possible to alleviate, for exampl…
Who is the assignee on this patent?
Omron Tateisi Electronics Co
What technology area does this patent fall under?
Primary CPC classification G05F1/66. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Jan 08 2019 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).