Vessel for operating on underwater wells and working methods of said vessel
US-9051783-B2 · Jun 9, 2015 · US
US10167063B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10167063-B2 |
| Application number | US-201815951134-A |
| Country | US |
| Kind code | B2 |
| Filing date | Apr 11, 2018 |
| Priority date | Apr 3, 2016 |
| Publication date | Jan 1, 2019 |
| Grant date | Jan 1, 2019 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
An underwater operation platform, including: a main body; two ducted propellers disposed at the tail end of the main body; a living building; pile legs; a tower crane; a submergence module; lifting devices; and a gantry crane. The main body includes a deck and a moonpool. The submergence module includes a support plate, a plurality of truss members, and a base plate. The living building disposed on the front end of the deck. The pile legs are disposed at the four corners of the main body, respectively. The deck includes two parallel pathways which are located at two sides of the moonpool, respectively, for supporting the gantry crane. The lifting devices are disposed on the deck and are close to four corners of the moonpool. The support plate and the base plate are integrated with the plurality of truss members.
Opening claim text (preview).
The invention claimed is: 1. An underwater operation platform, comprising: a main body, the main body comprising a deck and a moonpool; two ducted propellers disposed at a tail end of the main body; a living building disposed on a front end of the deck; pile legs; a tower crane; a submergence module, the submergence module comprising a support plate, a plurality of truss members, and a base plate; lifting devices, each lifting device comprising a steel cable; and a gantry crane; wherein the main body is rectangular and comprises four corners; the moonpool is rectangular and runs through a molded depth of the main body; the pile legs are disposed at the four corners of the main body, respectively; the tower crane sleeves one of the pile legs disposed at the tail end of the main body; the deck comprises two parallel pathways which are located at two sides of the moonpool, respectively, for supporting the gantry crane; the lifting devices are disposed on the deck and are close to four corners of the moonpool; a surface area of the submergence module is less than that of the moonpool; each lifting device is connected to one corner of the submergence module via the steel cable; the support plate and the base plate are integrated with the plurality of truss members; the main body further comprises inner side walls facing the moonpool, and the inner side walls are provided with watertight doors communicating with operation cabins of the main body. 2. The platform of claim 1 , wherein the tower crane comprises a suspension arm, a lifting hook, a control room, and a balance weight. 3. The platform of claim 1 , wherein the lifting devices each further comprise a winch, a bracket, and a pulley disposed on the bracket; the steel cable winds the pulley, one end of the steel cable is connected to a hub of the winch, and the other end of the steel cable is connected to a lifting lug of the submergence module. 4. A method for using the underwater operation platform of claim 1 , the method comprising: 1) withdrawing the pile legs and the leg sleeves in the main body; withdrawing the submergence module in the moonpool until the base plate of the submergence module aligns to a bottom of the main body; withdrawing the tower crane and the gantry crane in the deck; starting a dynamic positioning system of the underwater operation platform to control the ducted propellers to operate; and navigating the underwater operation platform to an oceanic operation area; 2) charging ballast tanks of the main body with water; descending the pile legs 6 and the leg sleeves until the leg sleeves land on the seabed; operating the tower crane and the gantry crane and laying out measuring equipment on the support plate of the submergence module; and lifting the main body out of water surface; 3) submerging the submergence module in the water using the lifting devices for underwater operations; 4) hoisting and withdrawing the submergence module in the moonpool using the lifting devices; 5) discharging water in the ballast tanks, withdrawing the pile legs and the leg sleeves in the main body; and 6) navigating the underwater operation platform to a next operation area.
Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices {(construction methods for floating offshore platforms B63B75/00)} · CPC title
Lifting devices specially adapted for particular uses not otherwise provided for (ground-engaging vehicle fittings for supporting, lifting or manoeuvring the vehicle B60S9/00) · CPC title
placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto · CPC title
Tools specially adapted for working underwater, not otherwise provided for · CPC title
Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries (B66C17/00 takes precedence; base supporting structures with legs B66C5/00; jib cranes B66C23/00) · CPC title