System and methods for managing changes to a product in a manufacturing environment including an anytime design check

US10162342B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10162342-B2
Application numberUS-201614991126-A
CountryUS
Kind codeB2
Filing dateJan 8, 2016
Priority dateJan 8, 2016
Publication dateDec 25, 2018
Grant dateDec 25, 2018

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A manufacturing process management (MPM) computer device is provided. The MPM computer device includes a processor and at least one memory device. The MPM computer device is configured to receive a first engineering design for a first configuration of a product to be assembled including an engineering bill of materials and a plurality of requirements, receive a first manufacturing process plan for the first configuration of the product including a plurality of operations, compare the plurality of operations with the plurality of requirements to determine whether each requirement of the plurality of requirements is met by at least one of the plurality of operations, associate each requirement with one or more of the plurality of operations based on the comparison, receive a notification from a user indicating that a first operation is complete, and store an indication that one or more requirements associated with the first operation are complete.

First claim

Opening claim text (preview).

What is claimed is: 1. A manufacturing process management (MPM) computer device comprising a processor and at least one memory device, wherein said processor is in communication with said at least one memory device, said MPM computer device configured to: receive a first engineering design for a first configuration of a product to be assembled including an engineering bill of materials and a plurality of requirements; receive a first manufacturing process plan for the first configuration of the product including a plurality of operations; store, in a database in the at least one memory device, the first engineering design and the first manufacturing process plan; compare the plurality of operations with the plurality of requirements to determine whether each requirement of the plurality of requirements is met by at least one of the plurality of operations; associate each requirement with one or more of the plurality of operations based on the comparison, by linking, in the database, the one or more operations with the corresponding requirement; receive, from a user, a notification indicating that a first operation is complete; and store, in the database, an indication that one or more requirements associated with the first operation are complete, wherein the indication is linked to the first operation in the database and the corresponding one or more requirements. 2. The MPM computer device in accordance with claim 1 , wherein the engineering design includes a first part to be installed at a first location and a substitute part for the first part, and wherein the MPM computer device is further configured to: receive a user input indicating that the substitute part was installed at the first location; and store an indication that the first part was installed. 3. The MPM computer device in accordance with claim 2 further configured to receive, from the user, a selection of the substitute part in a manufacturing bill of materials. 4. The MPM computer device in accordance with claim 1 , wherein the first engineering design and the first manufacturing process plan further include a disassembly plan, and wherein the MPM computer device is further configured to: receive, from the user, a first indication that a first part was installed; store the first indication; mark the product as complete based on the first indication and the first manufacturing process plan; receive, from the user, a second indication that the first part was removed; store the second indication; and mark the product as incomplete based on the second indication. 5. The MPM computer device in accordance with claim 1 further configured to assign a relationship between a first part in the engineering bill of materials and a second part in a manufacturing bill of materials, wherein the relationship is at least one of an issue, a remove, a rework, a restructure, and a reference. 6. The MPM computer device in accordance with claim 1 , wherein the engineering bill of materials includes a plurality of parts, and wherein the MPM computer device is further configured to: determine at least one part of the plurality of parts associated with a requirement of the plurality of requirements; add an item to the first manufacturing process plan associated with the at least one part to indicate the determined requirement; and display the determined requirement to the user prior to the user installing the at least one part. 7. The MPM computer device in accordance with claim 1 further configured to: receive an accountability check request from the user; compare the engineering bill of materials with a manufacturing bill of materials for the first configuration; generate a report based on the comparison; and provide the report to the user. 8. The MPM computer device in accordance with claim 1 , wherein the engineering bill of materials includes an installation that includes plurality of parts, and wherein the MPM computer device is further configured to: receive, from the user, assignment of one or more of the plurality of parts; receive, from the user, a request to approve the installation; determine whether all of the plurality of parts are assigned; and if the determination is that at least one of the plurality of parts is not assigned, prevent the user from approving the installation and approving the first manufacturing process plan. 9. The MPM computer device in accordance with claim 1 further configured to: receive, from the user, a restructured part comprising a plurality of parts; and associate the restructured part in the first manufacturing process plan with the plurality of parts in the engineering design. 10. The MPM computer device in accordance with claim 1 , wherein the product is an aircraft. 11. A computer implemented method for managing changes to a product in a manufacturing environment, said method implemented using a manufacturing process management (MPM) computer device in communication with a memory, said method comprising: receiving, by the MPM computer device, a first engineering design for a first configuration of a product to be assembled including an engineering bill of materials and a plurality of requirements; receiving, by the MPM computer device, a first manufacturing process plan for the first configuration of the product including a plurality of operations; storing, in a database in the at least one memory device, the first engineering design and the first manufacturing process plan; comparing, by the MPM computer device, the plurality of operations with the plurality of requirements to determine whether each requirement of the plurality of requirements is met by at least one of the plurality of operations; associating, by the MPM computer device, each requirement with one or more of the plurality of operations based on the comparison, by linking, in the database, the one or more operations with the corresponding requirement; receiving, from a user at the MPM computer device, a notification indicating that a first operation is complete; and storing, in the database an indication that one or more requirements associated with the first operation are complete, wherein the indication is linked to the first operation in the database and the corresponding one or more requirements. 12. The method in accordance with claim 11 , wherein receiving a first manufacturing process plan for the first configuration further comprises: displaying, to the user, a plurality of parts associated with the first engineering design; receiving, from the user, an approval of one or more parts of the plurality of parts; and generating the first manufacturing process plan based on the one or more approved parts. 13. The method in accordance with claim 12 further comprising: receiving, from the user, a second approval of one or more additional parts of the plurality of parts; and updating the first manufacturing process plan to include the one or more additional parts. 14. The method in accordance with claim 12 further comprising: determining a remaining plurality of parts based on the plurality of parts and the one or more approved parts; determining a number of remaining parts to be approved; and displaying the determined number and a list of the remaining plurality of parts. 15. The method in accordance with claim 11 , wherein the engineering design includes a first part to be installed at a first location and a substitute part for the first part, and wherein the method further comprises: receiving a user input indicating that the substitute part was installed at the first location; and stori

Assignees

Inventors

Classifications

  • Send article design, needed material, packaging and shipping info to manufacturer · CPC title

  • Cross-Sectional Technologies · mapped topic

  • Cross-Sectional Technologies · mapped topic

  • characterised by job scheduling, process planning, material flow · CPC title

  • Planing, material requiring planning MRP, request · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10162342B2 cover?
A manufacturing process management (MPM) computer device is provided. The MPM computer device includes a processor and at least one memory device. The MPM computer device is configured to receive a first engineering design for a first configuration of a product to be assembled including an engineering bill of materials and a plurality of requirements, receive a first manufacturing process plan …
Who is the assignee on this patent?
Boeing Co
What technology area does this patent fall under?
Primary CPC classification G05B19/41865. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Dec 25 2018 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 4 related publications on this page (citations in our corpus or others sharing the same primary CPC).