Control device for high-pressure pump

US10161342B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10161342-B2
Application numberUS-201615567367-A
CountryUS
Kind codeB2
Filing dateApr 4, 2016
Priority dateApr 24, 2015
Publication dateDec 25, 2018
Grant dateDec 25, 2018

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A control device for a high-pressure pump includes: a determination unit, an acquisition unit, and an electric power setting unit. The determination unit determines whether a movable portion of an electromagnetic valve has been moved to a closed position to close the electromagnetic valve when the electromagnetic valve is energized. The acquisition unit acquires, as an electromagnetic-valve response time, a period of time from a start of the energization of the electromagnetic valve until when it is determined that the electromagnetic valve has been closed. The electric power setting unit sets a supply power to the electromagnetic valve by repeating a process in which the supply power to the electromagnetic valve is reduced so as to be smaller than a previous value until the electromagnetic-valve response time reaches a predefined upper limit value.

First claim

Opening claim text (preview).

The invention claimed is: 1. A control device for a high-pressure pump including: a pump chamber having a suction port and a discharge port for fuel; a plunger configured to reciprocate in the pump chamber; a quantity control valve configured to open and close the suction port; and an electromagnetic valve configured to move the quantity control valve for opening and closing, the high-pressure pump being configured to energize the electromagnetic valve to move a movable portion of the electromagnetic valve to a closed position to close the quantity control valve, the control device comprising: a determination unit configured to determine whether the movable portion of the electromagnetic valve has been moved to the closed position to close the electromagnetic valve when the electromagnetic valve is energized; an acquisition unit configured to acquire, as an electromagnetic-valve response time, a period of time from a start of the energization of the electromagnetic valve until when it is determined that the electromagnetic valve has been closed; and an electric power setting unit configured to set a supply power to the electromagnetic valve by repeating a process in which the supply power to the electromagnetic valve is reduced so as to be smaller than a previous value until the electromagnetic-valve response time reaches a predefined upper limit value. 2. The control device for the high-pressure pump according to claim 1 , wherein, in case where the electromagnetic-valve response time is shorter than the upper limit value, the electric power setting unit performs the process in which the supply power to the electromagnetic valve is reduced so as to be smaller than the previous value each time when the number of times determining that the electromagnetic valve has been closed reaches a predefined determination count. 3. The control device for the high-pressure pump according to claim 2 , wherein the electric power setting unit increases the determination count as the electromagnetic-valve response time becomes longer, or increases the determination count as the supply power to the electromagnetic valve becomes smaller. 4. The control device for the high-pressure pump according to claim 1 , wherein the upper limit value is preset based on a characteristic of the electromagnetic valve to one of the electromagnetic-valve response time with which the supply power to the electromagnetic valve is a minimum supply power that is enough to close the electromagnetic valve and a value smaller than that by a predefined value. 5. The control device for the high-pressure pump according to claim 1 , further comprising: an information acquisition unit configured to acquire at least one of information related to temperature of the electromagnetic valve and a supply voltage to the electromagnetic valve; and a criterion-value setting unit configured to set a valve-closure criterion value on a basis of at least one of the information related to the temperature of the electromagnetic valve and the supply voltage to the electromagnetic valve, the valve-closure criterion value being for use when the determination unit determines whether the electromagnetic valve has been closed. 6. The control device for the high-pressure pump according to claim 5 , wherein the information acquisition unit estimates the temperature of the electromagnetic valve on a basis of at least one of cooling water temperature, lubricant temperature, and fuel temperature of an internal combustion engine. 7. The control device for the high-pressure pump according to claim 1 , further comprising: a learning unit configured to learn the supply power to the electromagnetic valve set by the electric power setting unit during operation of an internal combustion engine; a halt-time information acquisition unit configured to acquire halt-time information that is at least one of information related to temperature of the electromagnetic valve and a supply voltage to the electromagnetic valve when the internal combustion engine is stopped; a start-time information acquisition unit configured to acquire start-time information that is at least one of the information related to the temperature of the electromagnetic valve and the supply voltage to the electromagnetic valve when the internal combustion engine is started; and an initial value setting unit configured to correct a learned value of the supply power to the electromagnetic valve on a basis of the halt-time information and the start-time information to set an initial value of a forthcoming supply power to the electromagnetic valve when the internal combustion engine is started. 8. The control device for the high-pressure pump according to claim 7 , wherein the halt-time information acquisition unit and the start-time information acquisition unit estimate the temperature of the electromagnetic valve on a basis of at least one of cooling water temperature, lubricant temperature, and fuel temperature of the internal combustion engine. 9. A control device for a high-pressure pump including: a pump chamber having a suction port and a discharge port for fuel; a plunger configured to reciprocate in the pump chamber; a quantity control valve configured to open and close the suction port; and an electromagnetic valve configured to move the quantity control valve for opening and closing, the high-pressure pump being configured to energize the electromagnetic valve to move a movable portion of the electromagnetic valve to a closed position to close the quantity control valve, the control device comprising: a determination unit configured to determine whether the movable portion of the electromagnetic valve has been moved to the closed position to close the electromagnetic valve when the electromagnetic valve is energized; an acquisition unit configured to acquire, as an electromagnetic-valve response time, a period of time from a start of the energization of the electromagnetic valve until when it is determined that the electromagnetic valve has been closed; a target setting unit configured to set a target value of the electromagnetic-valve response time as a target electromagnetic-valve response time; and an electric power control unit configured to control a supply power to the electromagnetic valve such that the electromagnetic-valve response time becomes equal to the target electromagnetic-valve response time. 10. The control device for the high-pressure pump according to claim 9 , wherein the target setting unit sets the target electromagnetic-valve response time to restrict overheating of the electromagnetic valve. 11. The control device for the high-pressure pump according to claim 10 , wherein the target setting unit changes the target electromagnetic-valve response time in accordance with temperature of the electromagnetic valve.

Assignees

Inventors

Classifications

  • Fuel temperature · CPC title

  • Temperature of lubricating oil or working fluid · CPC title

  • by variably-timed valves controlling fuel passages {to pumping elements or overflow passages} · CPC title

  • Measuring or detecting injection-valve lift, e.g. to determine injection timing · CPC title

  • by controlling the flow into the common rail, e.g. the amount of fuel pumped · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10161342B2 cover?
A control device for a high-pressure pump includes: a determination unit, an acquisition unit, and an electric power setting unit. The determination unit determines whether a movable portion of an electromagnetic valve has been moved to a closed position to close the electromagnetic valve when the electromagnetic valve is energized. The acquisition unit acquires, as an electromagnetic-valve res…
Who is the assignee on this patent?
Denso Corp
What technology area does this patent fall under?
Primary CPC classification F02D41/2464. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Dec 25 2018 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 2 related publications on this page (citations in our corpus or others sharing the same primary CPC).