Production method for smelting clean steel from full-scrap steel using duplex electric arc furnaces
US-2018363077-A1 · Dec 20, 2018 · US
US10151007B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10151007-B2 |
| Application number | US-201314437903-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 24, 2013 |
| Priority date | Oct 24, 2012 |
| Publication date | Dec 11, 2018 |
| Grant date | Dec 11, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for supplying energy to a scrap metal pile ( 9 ) in an electric arc furnace ( 2 ). Energy is supplied by jets of hot gas in a first phase. Energy is supplied by electric arcs in a second phase after the first phase is completed. Hot gas is supplied via at least six jets. A device ( 1 ) for the method has an electric arc furnace ( 2 ), one or more blowing devices ( 6 a, 6 b, 6 c ), supply jets of reactant hot air into the chamber ( 7 ) of the electric arc furnace ( 8 ). The devices have a total of at least six nozzles ( 10 a, 10 b, 10 c, 10 d, 10 e, 10 f ) with nozzle openings. Fuel conducting devices ( 8 ) supply fuel to the jets of reactant hot air.
Opening claim text (preview).
The invention claimed is: 1. A method for supplying energy into a scrap metal pile in an electric arc furnace that includes a cover wall having a center and a plurality of blowing apparatuses, each blowing apparatus being arranged in a respective opening in the cover wall, and each opening in the cover wall being spaced from the other openings in the cover wall and spaced from the center of the cover wall, the method comprising: in a first phase, supplying energy by a plurality of…
Chemistry & Metallurgy · mapped topic
Mechanical Engineering · mapped topic
Mechanical Engineering · mapped topic
Mechanical Engineering · mapped topic
Cross-Sectional Technologies · mapped topic
Related publications grouped by family.
Free tools are coming soon. Tell us what you want to track and we'll notify you.
Answers are generated from the same data shown on this page.