Method and apparatus of transmitting control information in wireless communication systems
US-2016212737-A1 · Jul 21, 2016 · US
US10142155B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10142155-B2 |
| Application number | US-201715675631-A |
| Country | US |
| Kind code | B2 |
| Filing date | Aug 11, 2017 |
| Priority date | Aug 12, 2016 |
| Publication date | Nov 27, 2018 |
| Grant date | Nov 27, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The present disclosure relates to a pre-5 th -Generation (5G) or 5G communication system to be provided for supporting higher data rates of Beyond 4 th -Generation (4G) communication system such as Long Term Evolution (LTE). A method for operating a base station in a wireless communication system includes transmitting, to a first terminal, a frequency-quadrature amplitude modulation (FQAM) symbol through a plurality resource units that comprises an active resource unit and at least one inactive resource unit. The method further comprises transmitting, to a second terminal, at least one modulation symbol through the at least one inactive resource unit.
Opening claim text (preview).
What is claimed is: 1. A method for operating a base station in a wireless communication system, the method comprising: transmitting, on a first resource unit, a first symbol generated based on frequency-quadrature amplitude modulation (FQAM) using a plurality of resource units that comprises the first resource unit and a second resource unit to a first terminal; and transmitting, on the second resource unit, a second symbol generated based on a modulation scheme different from the FQAM to a second terminal. 2. The method of claim 1 , wherein the plurality of resource units comprises resources allocated in one of a frequency domain, a time domain or a spatial domain. 3. The method of claim 1 , wherein the plurality of resource units comprises one of a plurality of subcarriers, a plurality of symbols, a plurality of timeslots, or a plurality of antennas. 4. The method of claim 1 , wherein the second symbol is generated based on amplitude shift keying (ASK), phase shift keying (PSK), amplitude-phase shift keying (APSK), continuous phase modulation (CPM), frequency shift keying (FSK) or the FQAM. 5. The method of claim 1 , further comprising: wherein the first symbol is transmitted to the first terminal with a first transmission power, wherein the second symbol is transmitted to the second terminal with a second transmission power, and wherein the second transmission power is smaller than the first transmission power. 6. The method of claim 5 , wherein relative levels of the first transmission power and the second transmission power are determined to allow a signal separation of signal received at the first terminal and the second terminal. 7. The method of claim 5 , wherein the second transmission power is determined based on a path loss in a channel between the base station and the first terminal. 8. The method of claim 5 , further comprising: performing precoding on the first symbol or the second symbol in order to eliminate the second symbol at the first terminal. 9. The method of claim 1 , wherein the first terminal or the second terminal is a machine type communications (MTC) user equipment (UE). 10. A base station in a wireless communication system, the base station comprising: a transceiver; and at least one processor coupled to the transceiver, wherein the transceiver is configured to: transmit, on a first resource unit, a first symbol generated based on frequency-quadrature amplitude modulation (FQAM) using a plurality of resource units that comprises the first resource unit and a second resource unit to a first terminal; and transmit, on the second resource unit, a second symbol generated based on a modulation scheme different from the FQAM to a second terminal. 11. The base station of claim 10 , wherein the plurality of resource units comprises resources allocated in one of a frequency domain, a time domain or a spatial domain. 12. The base station of claim 10 , wherein the plurality of resource units comprises one of a plurality of subcarriers, a plurality of symbols, a plurality of timeslots, or a plurality of antennas. 13. The base station of claim 10 , wherein the second symbol is generated based on amplitude shift keying (ASK), phase shift keying (PSK), amplitude-phase shift keying (APSK), continuous phase modulation (CPM), frequency shift keying (FSK) or the FQAM. 14. The base station of claim 10 , wherein the first symbol is transmitted to the first terminal with a first transmission power, wherein the second symbol is transmitted to the second terminal with a second transmission power, and wherein the second transmission power is smaller than the first transmission power. 15. The base station of claim 14 , wherein relative levels of the first transmission power and the second transmission power are determined to allow a signal separation of signal received at the first terminal and the second terminal. 16. The base station of claim 14 , wherein the second transmission power is determined based on a path loss in a channel between the base station and the first terminal. 17. The base station of claim 14 , wherein the at least one processor is configured to: perform precoding on the first symbol or the second symbol in order to eliminate the second symbol at the first terminal. 18. The base station of claim 10 , wherein the first terminal or the second terminal is a machine type communications (MTC) user equipment (UE).
Amplitude-modulated carrier systems, e.g. using on-off keying; Single sideband or vestigial sideband modulation (H04L27/32 takes precedence) · CPC title
Modulator circuits; Transmitter circuits · CPC title
for continuous phase modulation (frequency shift keying H04L27/10) · CPC title
Modulation using more than one carrier, e.g. with quadrature carriers, separately amplitude modulated (H04L27/366 takes precedence) · CPC title
for offset or staggered quadrature phase shift keying · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.