Fluid film bearing comprising bearing pads and method of replacing bearing pads
US-2024093673-A1 · Mar 21, 2024 · US
US10138865B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10138865-B2 |
| Application number | US-201314648016-A |
| Country | US |
| Kind code | B2 |
| Filing date | Nov 28, 2013 |
| Priority date | Nov 29, 2012 |
| Publication date | Nov 27, 2018 |
| Grant date | Nov 27, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method of removing a wind turbine component includes assembling a transport system having a track, one or more support frames, and a carriage movably coupled to the track, the transport system having a first end positioned inside the tower and a second end positioned outside of the tower such that the track extends through an opening in the tower; raising the wind turbine component off of a platform located within the tower and above the door; moving at least part of the platform to allow the component to pass; lowering the wind turbine component onto the carriage; moving the carriage along the track from inside the tower to outside the tower; and removing the wind turbine component from the carriage. A transport system having a track, one or more support frames, and a carriage is also disclosed.
Opening claim text (preview).
What is claimed is: 1. A method of removing a wind turbine component from a wind turbine having a tower with a door for closing off an opening through the tower, the method comprising: providing a transport system comprising a track having a first end and a second end, one or more support frames configured to support the track and a carriage configured to be movably coupled to the track; assembling the transport system, including positioning the first end inside the tower and positioning the second end outside of the tower such that the track extends through the opening in the tower; raising the wind turbine component off a section of a platform located within the tower and above the door; moving at least a part of the section of the platform to allow the wind turbine component to pass the platform; lowering the wind turbine component onto the carriage; moving the carriage along the track from inside the tower to outside the tower such that the wind turbine component is completely positioned outside the tower; and removing the wind turbine component from the carriage. 2. The method according to claim 1 , further comprising moving another wind turbine component into the wind turbine, comprising: positioning the another wind turbine component on the carriage; moving the carriage along the track from outside the tower to inside the tower; raising the another wind turbine component off of the carriage and above the platform; moving at least a part of the platform to prevent the another wind turbine component from passing the platform; lowering the another wind turbine component onto the platform; and disassembling the transport system. 3. The method according to claim 1 , wherein assembling the transport system further comprises: positioning a first end of a first rail inside the tower with a second end positioned outside the tower; positioning a first end of a second rail inside the tower with a second end positioned outside the tower, the second rail being positioned so as to be generally parallel to the first rail; and supporting the first and second rails outside the tower with a first support frame. 4. The method according to claim 3 , wherein positioning the first end of the first and second rails inside the tower further comprises coupling the first end of the first and second rails to an inner wall of the tower. 5. The method according to claim 4 , further comprising fixedly securing the first and second rails to at least one of the inner wall of the tower and the first support frame. 6. The method according to claim 4 , wherein positioning the first end of the first and second rails inside the tower further comprises coupling the first end of the first and second rails to the inner wall of the tower at or near locations along the inner wall opposite the opening. 7. The method according to claim 3 , further comprising adjusting the height of the first support frame. 8. The method according to claim 7 , wherein adjusting the height of the first support frame causes the first and second rails to be angled relative to horizontal. 9. The method according to claim 1 , wherein assembling the transport system further comprises coupling a plurality of transport segments in end-to-end fashion to form the transport system. 10. The method according to claim 9 , further comprising coupling adjacent transport segments in the region of the tower wall opening with frame spacers and rail spacers. 11. The method according to claim 1 , wherein moving the carriage along the track further comprises activating a powered drive device that moves the carriage along the track. 12. The method according to claim 11 , wherein activating a powered drive device further comprises activating a winch system that moves the carriage along the track. 13. The method according to claim 1 , wherein raising or lowering the wind turbine component further comprises actuating an internal winch system to raise or lower the wind turbine component. 14. The method according to claim 1 , wherein raising the wind turbine component off of the platform includes raising the wind turbine component along a vertical axis, and wherein lowering the wind turbine component onto the carriage includes lowering the wind turbine component along the vertical axis. 15. The method according to claim 1 , wherein raising the wind turbine component off of the platform includes raising the wind turbine component off of the at least part of the platform prior to moving the at least part of the platform to allow the wind turbine component to pass the platform. 16. A method of removing a wind turbine component from a wind turbine tower having an internal platform including a closure for closing off an opening through the platform, the method comprising: coupling a cable of a hoist system to the wind turbine component when the wind turbine component is supported by the closure; supporting the wind turbine component via the hoist system; moving at least a portion of the closure to allow the wind turbine component to pass the platform; and lowering the wind turbine component through the opening along a vertical axis via the hoist system.
Tramway or funicular systems with rigid track and cable traction (haulage clips B61B12/12) · CPC title
with provision for hoisting onto the structure · CPC title
Maintenance or repair · CPC title
Maintenance, repair or inspection of offshore constructions · CPC title
Offshore structures for wind turbines · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.