Enhancing coexistence on unlicensed frequency bands using adaptive clear-to-send-to-self messages

US10136331B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10136331-B2
Application numberUS-201615235738-A
CountryUS
Kind codeB2
Filing dateAug 12, 2016
Priority dateAug 12, 2016
Publication dateNov 20, 2018
Grant dateNov 20, 2018

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A base station operates according to a first radio access technology (RAT) that requires synchronization on timing synchronization boundaries. The base station acquires a channel of an unlicensed frequency band and generates a clear-to-send message that is decodable by access points that operate according to a second RAT that does not require synchronization on the timing synchronization boundaries. The base station transmits the clear-to-send message during a time interval between acquisition of the channel and a subsequent timing synchronization boundary.

First claim

Opening claim text (preview).

What is claimed is: 1. A method for implementation by a base station that operates according to a first radio access technology (RAT) that requires synchronization on timing synchronization boundaries, the method comprising: acquiring a channel of an unlicensed frequency band at an acquisition time; generating a clear-to-send message that is decodable by access points that operate according to a second RAT that does not require synchronization on the timing synchronization boundaries; and transmitting the clear-to-send message during a first time interval between the acquisition time and a first timing synchronization boundary, wherein the clear-to-send message includes information indicating a duration of a channel reservation for the acquired channel, and wherein the duration is equal to the first time interval plus a second time interval between the first timing synchronization boundary and a second timing synchronization boundary. 2. The method of claim 1 , wherein the second timing synchronization boundary is separated from the first timing synchronization boundary by at least one third timing synchronization boundary. 3. The method of claim 1 , wherein the timing synchronization boundaries include at least one of a frame boundary, a subframe boundary, and a partial subframe boundary. 4. The method of claim 1 , further comprising: measuring a signal strength of a beacon signal received from an access point that operates according to the second RAT; and transmitting the clear-to-send message in response to the measured signal strength exceeding a threshold signal strength. 5. The method of claim 1 , further comprising: determining a transmission power for the clear-to-send message based on signals received from access points on the channel of the unlicensed frequency band, and wherein transmitting the clear-to-send message comprises transmitting the clear-to-send message at the transmission power. 6. The method of claim 5 , further comprising: determining path losses to the access points based on the received signals, and wherein determining the transmission power comprises determining the transmission power based on the path losses. 7. The method of claim 6 , wherein determining the transmission power comprises: identifying a first subset of the access points that have path losses below a threshold and a second subset of the access points that have path losses above the threshold; and determining the transmission power so that the first subset of access points receives the clear-to-send message at a signal strength above a minimum signal strength for decoding and the second subset of access points receives the clear-to-send message at a signal strength below the minimum signal strength for decoding. 8. The method of claim 1 , wherein transmitting the clear-to-send message comprises transmitting the clear-to-send message as part of a preamble that is generated in accordance with the first RAT and is not decodable by the access point that operates according to the second RAT. 9. The method of claim 1 , wherein transmitting the clear-to-send message comprises transmitting the clear-to-send message towards user equipment that are configured to forward the clear-to-send message. 10. A base station that operates according to a first radio access technology (RAT) that requires synchronization on timing synchronization boundaries, the base station comprising: a transceiver configured to operate using a channel of an unlicensed frequency band; and a processor configured to generate a clear-to-send message that is decodable by access points that operate according to a second RAT that does not require synchronization on the timing synchronization boundaries, wherein the transceiver is configured to transmit the clear-to-send message during a first time interval between an acquisition time of the channel and a first timing synchronization boundary, wherein the clear-to-send message includes information indicating a duration of a channel reservation for the acquired channel, and wherein the duration is equal to the first time interval plus a second time interval between the first timing synchronization boundary and a second timing synchronization boundary. 11. The base station of claim 10 , wherein the second timing synchronization boundary is separated from the first timing synchronization boundary by at least one third timing synchronization boundary. 12. The base station of claim 10 , wherein the timing synchronization boundaries include at least one of a frame boundary, a subframe boundary, and a partial subframe boundary. 13. The base station of claim 10 , wherein the transceiver is further configured to: measure a signal strength of a beacon signal received from an access point that operates according to the second RAT; and transmit the clear-to-send message in response to the measured signal strength exceeding a threshold signal strength. 14. The base station of claim 10 , wherein the processor is further configured to: determine a transmission power for the clear-to-send message based on signals received from access points on the channel of the unlicensed frequency band, and wherein the transceiver is configured to transmit the clear-to-send message at the transmission power. 15. The base station of claim 14 , wherein the processor is further configured to: determine path losses to the access points based on the received signals and determine the transmission power based on the path losses. 16. The base station of claim 15 , wherein the processor is further configured to identify a first subset of the access points that have path losses below a threshold and a second subset of the access points that have path losses above the threshold, and wherein the processor is further configured to determine the transmission power so that the first subset of access points receives the clear-to-send message at a signal strength above a minimum signal strength for decoding and the second subset of access points receives the clear-to-send message at a signal strength below the minimum signal strength for decoding. 17. The base station of claim 10 , wherein the transceiver is configured to transmit the clear-to-send message as part of a preamble that is generated in accordance with the first RAT and is not decodable by the access point that operates according to the second RAT. 18. The base station of claim 10 , wherein the transceiver is configured to transmit the clear-to-send message towards user equipment that are configured to forward the clear-to-send message. 19. A method for implementation by a base station that operates according to a first radio access technology (RAT) that requires synchronization on timing synchronization boundaries, the method comprising: acquiring a channel of an unlicensed frequency band at an acquisition time; determining a first time interval between the acquisition time and a first timing synchronization boundary; and sequentially transmitting one or more clear-to-send messages during the time interval, wherein the one or more clear-to-send messages are decodable by access points that operate according to a second RAT that does not require synchronization on the timing synchronization boundaries, wherein the one or more clear-to-send messages include information indicating a duration of a channel reservation for the acquired channel, and wherein the duration is equal to the first time interval plus a second time interval between the first timing synchronization boundary and a second timing synchron

Assignees

Inventors

Classifications

  • at the moment of starting communication in a multiple access environment · CPC title

  • using the level of interference · CPC title

  • taking into account received signal strength · CPC title

  • taking into account path loss · CPC title

  • with collision avoidance · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10136331B2 cover?
A base station operates according to a first radio access technology (RAT) that requires synchronization on timing synchronization boundaries. The base station acquires a channel of an unlicensed frequency band and generates a clear-to-send message that is decodable by access points that operate according to a second RAT that does not require synchronization on the timing synchronization bounda…
Who is the assignee on this patent?
Alcatel Lucent
What technology area does this patent fall under?
Primary CPC classification H04W16/14. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Nov 20 2018 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 3 related publications on this page (citations in our corpus or others sharing the same primary CPC).