Integrated drilling control system

US10113408B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10113408-B2
Application numberUS-201514874613-A
CountryUS
Kind codeB2
Filing dateOct 5, 2015
Priority dateOct 3, 2014
Publication dateOct 30, 2018
Grant dateOct 30, 2018

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A computerized control system performs controlled pressure drilling in a formation with a drilling system according to a plan. A setup of at least the plan, the formation, and the drilling system is configured in the control system, and the setup is integrated with the drilling system. Functioning of the set up can then be conducted using one of a plurality of control modes, including an operating mode and a simulating mode. The control system functions the setup according to the operating mode for operational interaction with the setup using the integration of the setup with the drilling system. The control system can switch from the operating mode to the simulating mode for simulated interaction with the setup. The control system simulates for at least a time period the functioning of the setup according to the simulating mode using the integration of the setup with the drilling system. Current operations continue as at least one simulated operation or event is projected in the future. Ultimately, results from the simulating mode can be used in the operating mode as further operations continue.

First claim

Opening claim text (preview).

What is claimed is: 1. A method of performing controlled pressure drilling of a borehole in a formation with a drilling system according to a drilling plan, the method comprising: configuring, with a computerized control system, a setup of at least the drilling plan, the formation, and the drilling system; performing the controlled pressure drilling of the borehole in the formation with the drilling system according to the drilling plan by: integrating the setup of the computerized control system with the drilling system, acquiring current data of at least the drilling system, and functioning the drilling system with the computerized control system using the acquired data in an operating mode for operational interaction with the drilling system; switching, at the computerized control system, from the operating mode to a simulating mode in response to an event anticipated in the drilling operation according to the drilling plan for simulated interaction with the drilling system while continuing the controlled pressure drilling with the drilling system; simulating the functioning of the drilling system with the computerized control system for a future time period using simulated data in the simulating mode; and using a result from the simulated interaction in the operational interaction with the drilling system. 2. The method of claim 1 , wherein configuring the setup comprises configuring information pertaining to the borehole, the formation, surface equipment, piping, wellsite data, casing, drillstring, drilling trajectory, and fluid properties. 3. The method of claim 1 , wherein simulating the functioning in the simulating mode comprises: simulating the functioning with at least one simulated operation projected over the future time period in the future. 4. The method of claim 3 , wherein simulating the functioning with the at least one simulated operation projected over the future time period in the future comprises setting a rate at which the future time period advances in the future for the at least one simulated operation. 5. The method of claim 3 , wherein simulating the functioning with the at least one simulated operation projected over the future time period in the future comprises modeling, with one or more algorithms of the computerized control system, the functioning of the at least one simulated operation to drill the borehole in the formation with the drilling system according to the drilling plan. 6. The method of claim 3 , wherein using the result from the simulated interaction in the operational interaction with the drilling system comprises: switching, at the computerized control system, from the simulating mode back to the operating mode; and providing, at the computerized control system, the result of the at least one simulated operation from the simulating mode within the operating mode. 7. The method of claim 6 , wherein the at least one simulated operation comprises the anticipated event; wherein the provided result comprises a modelled response for the anticipated event; and wherein the method further comprises: monitoring for the anticipated event; and at least partially implementing the modelled response. 8. The method of claim 1 , wherein functioning in the operating mode comprises functioning according to a first of a plurality of operations for operating the drilling system within the operating mode. 9. The method of claim 8 , wherein simulating the functioning in the simulated mode comprises simulating the functioning according to a second of the operations for operating the drilling system within the simulating mode. 10. The method of claim 8 , wherein the operations comprise one or more of: an in-casing test operation, a drilling operation of performing the controlled pressure drilling of the borehole, a connection operation of performing a connection of drillpipe, a tripping operation of tripping drillpipe out of the borehole, a circulation operation of circulating fluid in the borehole, a reaming operation of reaming the borehole, a well control operation of handling a kick or a loss while drilling the borehole, and an offline operation. 11. The method of claim 10 , wherein the operations comprise one or more controls selected from the group consisting of a proportional gain control, an integral time control, a choke control, a connection control, a Leak Off Test (LOT), a Formation Integrity Test (FIT), a cement control, a pill, a kick control, and a loss control. 12. The method of claim 1 , further comprising: a monitoring mode for monitoring current interaction with the drilling system; and a reviewing mode for replaying past interaction with the drilling system. 13. The method of claim 1 , the method further comprising: indicating, at the computerized control system, a selection of one of a plurality of control modes for interacting with the drilling system, the control modes at least including (i) the operating mode for the operational interaction with the drilling system and (ii) the simulating mode for the simulated interaction with the drilling system; indicating, at the computerized control system, a selection of one of a plurality of operations for operating the drilling system; and wherein the act of functioning comprises functioning the drilling system with the computerized control system according to the selected operation within the selected control mode. 14. The method of claim 1 , wherein functioning the drilling system using the acquired data in the operating mode for the operational interaction with the drilling system comprises using one or more automated controls automatically controlling the functioning of the drilling system and using one or more manual controls manually controlling the functioning of the drilling system. 15. The method of claim 1 , wherein simulating the functioning of the drilling system with the computerized control system for the future time period using the simulated data in the simulating mode comprises selecting a plurality of simulated operations for responding to the anticipated event, simulating the functioning of the drilling system by running the selected simulated operations; and determining one of the selected simulated operations based on simulated results from the simulated functioning. 16. The method of claim 15 , wherein using the result from the simulated interaction in the operational interaction with the drilling system comprises running the determined one of the selected simulated operations in response to an occurrence of the anticipated event in the drilling operation. 17. The method of claim 16 , further comprising comparing the simulated result to an actual result of running the determined one of the selected simulated operations; and refining at least the determined one of the selected simulated operations based on the comparison. 18. A programmable storage device having program instructions stored thereon for causing a programmable control device to perform a method of performing controlled pressure drilling of a borehole in a formation with a drilling system according to a drilling plan, the method comprising: configuring, with the programmable control device, a setup of at least the drilling plan, the formation, and the drilling system; performing the controlled pressure drilling of the borehole in the formation with the drilling system according to the drilling plan by: integrating the setup of the programmable control device with the drilling system, acquiring current data of at least the drilling system, and functioning the drilling system with

Assignees

Inventors

Classifications

  • electric · CPC title

  • E21B44/00Primary

    Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions · CPC title

  • E21B21/08Primary

    Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure (valve arrangements therefor E21B21/10) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10113408B2 cover?
A computerized control system performs controlled pressure drilling in a formation with a drilling system according to a plan. A setup of at least the plan, the formation, and the drilling system is configured in the control system, and the setup is integrated with the drilling system. Functioning of the set up can then be conducted using one of a plurality of control modes, including an operat…
Who is the assignee on this patent?
Weatherford Tech Holdings Llc
What technology area does this patent fall under?
Primary CPC classification E21B44/00. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Oct 30 2018 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).