Method for forming a support wall in the ground and support wall
US-2024417945-A1 · Dec 19, 2024 · US
US10100481B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10100481-B2 |
| Application number | US-201715583840-A |
| Country | US |
| Kind code | B2 |
| Filing date | May 1, 2017 |
| Priority date | May 17, 2016 |
| Publication date | Oct 16, 2018 |
| Grant date | Oct 16, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The invention relates to a ground-working machine and a method for producing wall panels, with the ground-working machine having at least two elongate drilling and mixing tools arranged parallel to each other, which comprise a rod-form base body, on which a first screw conveyor and at least one second screw conveyor are arranged, the second screw conveyor being axially spaced apart from the first screw conveyor. According to the invention it is provided that at least on one drilling and mixing tool at a lower end the first screw conveyor is formed with an outer diameter that is greater than an outer diameter of the second screw conveyor which is arranged above the first screw conveyor.
Opening claim text (preview).
The invention claimed is: 1. A ground-working machine having at least two elongate drilling and mixing tools arranged parallel to each other, which comprise a rod-form base body, on which a lower first screw conveyor and at least one upper second screw conveyor are arranged, the at least one upper second screw conveyor being axially spaced apart from the lower first screw conveyor, wherein on at least one of the at least two elongate drilling and mixing tools, at a lower end of the lower first screw conveyor, the lower first screw conveyor is formed with an outer diameter that is greater than an outer diameter of the at least one upper second screw conveyor, which is arranged above the lower first screw conveyor, a first transverse yoke and a second transverse yoke are arranged between the lower first screw conveyor and the at least one upper second screw conveyor, the first transverse yoke and the second transverse yoke connecting the at least two elongate drilling and mixing tools to each other, between the at least two elongate drilling and mixing tools, a rod-form intermediate element is arranged, which has a third screw conveyor in an upper area of the rod-form intermediate element, the intermediate element has, at least in a lower area of the intermediate element, a smaller outer diameter than an outer diameter of the neighboring at least two elongate drilling and mixing tools, in a space between the first transverse yoke and the second transverse yoke, the at least two elongate drilling and mixing tools comprise a fourth screw conveyor, the intermediate element does not comprise a screw conveyor in the space between the first transverse yoke and the second transverse yoke, and the fourth screw conveyor has a diameter greater than that of the at least one upper second screw conveyor, and the lower area of the intermediate element is connected via the first transverse yoke and forms an exchangeable unit, which is releasably connected by an axial shaft connector. 2. The ground-working machine according to claim 1 , wherein the lower first screw conveyor has a half to two spiral rotations. 3. The ground-working machine according to claim 2 , wherein the lower first screw conveyor has a single spiral rotation. 4. The ground-working machine according to claim 1 , wherein the at least two elongate drilling and mixing tools are rotatably mounted in the first transverse yoke and the second transverse yoke. 5. The ground-working machine according to claim 1 , wherein at least in an area of the at least one upper second screw conveyor, mixing elements, agitating elements, or a combination of mixing elements and agitating elements are additionally arranged. 6. The ground-working machine according to claim 1 , wherein a removal means for removing ground material is attached to a lower tip of the at least two elongate drilling and mixing tools. 7. The ground-working machine according to claim 1 , wherein a mast is provided, along which a carriage is movably guided, and the at least two elongate drilling and mixing tools are rotatably mounted to the mast via the carriage. 8. The ground-working machine according to claim 7 , wherein at least one rotary drive is arranged on the carriage for driving in rotation the at least two elongate drilling and mixing tools. 9. The ground-working machine according to claim 1 , wherein a drivable carrier unit is provided. 10. A method for producing a wall panel in a ground with the ground-working machine according to claim 1 , having the at least two elongate drilling and mixing tools arranged parallel to each other, which have the lower first screw conveyor and the at least one upper second screw conveyor, wherein the method comprises: driving the at least two elongate drilling and mixing tools in rotation and sinking the at least two elongate drilling and mixing tools into the ground, removing ground material mixing the removed ground material with an added binder suspension and forming a ground mortar, and setting the ground mortar to form the wall panel after the at least two elongate drilling and mixing tools have been pulled out of the ground, wherein via the use of the lower first screw conveyor on at least one of the elongate drilling and mixing tools, a bore diameter is produced that is greater than an outer diameter of the at least one upper second screw conveyor, wherein the at least one upper second screw conveyor is spaced apart from a bore wall. 11. The ground-working machine according to claim 1 , wherein the axial shaft connector comprises spline groove teething.
the bulkheads or walls being made continuously, e.g. excavating and constructing bulkheads or walls in the same process, without joints · CPC title
Foundation slots {or slits}; Implements for making these slots {or slits} · CPC title
and mixing by rotating blades · CPC title
Bulkheads or similar walls made solely of concrete in situ {(moulds therefor E02D5/68; making foundation slots E02D17/13; sealing diaphragms other than those made of concrete E02D19/18)} · CPC title