Trigger-based wireless broadcasting for aerosol delivery devices
US-2024424234-A1 · Dec 26, 2024 · US
US10054915B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10054915-B2 |
| Application number | US-201314412399-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jun 26, 2013 |
| Priority date | Jul 5, 2012 |
| Publication date | Aug 21, 2018 |
| Grant date | Aug 21, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The obtainment unit obtains information indicative of a content of manual-operation performed by a user regarding control of an intended apparatus from a group of loads, and stores it as manual-operation information including an obtaining time. The identification unit identifies a type of control of the manual-operation information. The determination unit counts the number of times of obtaining the manual-operation information within a counting period equal to two days or more, for each type and for each time period, and determines whether the number of times of obtaining the same type of manual-operation information within the same time period is equal to a predetermined threshold or more. When the number of times of obtaining the same type of manual-operation information within the same time period is determined to be equal to the predetermined threshold or more, the schedule change unit changes a control schedule based on this manual-operation information.
Opening claim text (preview).
The invention claimed is: 1. A method for controlling apparatus for controlling an operation of an intended apparatus in accordance with a control schedule, the method comprising: storing, in a storage unit, a control schedule including multiple control commands each defining a pair of a control time and a control content, the control time and the control content being associated with each other; controlling an intended apparatus at a control time used in the control schedule stored in the schedule storage unit, in accordance with the control content associated with the control time; obtaining, within a counting period equal to or more than two days, manual-operation information indicative of a control content of a manual-operation conducted by a user and a time at which the manual-operation is conducted with regard to control on the intended apparatus; counting the number of times of a specific manual operation conducted by the user based on the manual-operation information within the counting period equal to or more than two days, for each of multiple time periods into which a day is divided; determining whether the number of times of the specific manual operation for the time periods is equal to or more than a predetermined threshold; after determining that the number of times of the specific manual operation in a given time period is equal to or more than the predetermined threshold, identifying a control command, in the given time period, having the same control content type as a control content of the specific manual operation; setting, as a determination period, a monitoring period based on the control schedule, the monitoring period being constituted by at least one of predetermined time periods prior to and subsequent to the control time in the control schedule corresponding to the identified control command; determining whether or not the given time period is included in the monitoring period, and after determining that the given time period is included in the monitoring period, changing the control time in the control schedule corresponding to the identified control command based on manual-operation information corresponding to the given time period. 2. An apparatus control device for controlling an operation of an intended apparatus in accordance with a control schedule, which consumes resources to operate, the apparatus control device comprising: a schedule storage unit configured to store a control schedule including multiple control commands each defining a pair of a control time and a control content, the control time and the control content being associated with each other; an execution unit configured to control the intended apparatus, at a control time defined in the control schedule stored in the schedule storage unit, in accordance with the control content associated with the control time; an obtainment unit configured to obtain, within a counting period equal to or more than two days, manual-operation information indicative of a control content of a manual-operation conducted by a user and a time at which the manual-operation is conducted with regard to control on the intended apparatus; a first determination unit configured to: count the number of times of a specific manual operation conducted by the user based on the manual-operation information within the counting period equal to or more than two days, for each of multiple time periods into which a day is divided, and determine whether the number of times of the specific manual operation for the time periods is equal to or more than a predetermined threshold; a schedule change unit configured to: when the number of times of the specific manual operation in a given time period is equal to or more than the predetermined threshold, identify a control command, in the given time period, having the same control content type as a control content of the specific manual operation; and a second determination unit configured to: set, as a determination period, a monitoring period based on the control schedule, the monitoring period being constituted by at least one of predetermined time periods prior to and subsequent to the control time in the control schedule corresponding to the identified control command; and determine whether or not the given time period is included in the monitoring period, wherein the schedule change unit is further configured to, when the given time period is included in the monitoring period, change the control time in the control schedule corresponding to the identified control command based on manual-operation information corresponding to the given time period. 3. The apparatus control device according to claim 2 , wherein the schedule change unit is configured to, when the given time period is included in the monitoring period, change the control time based on a content of manual-operation information which is obtained at a time which results in a smallest consumption of the resources. 4. The apparatus control device according to claim 2 , wherein: the first determination unit is configured to use different values as the threshold for two or more specific manual operations, and a value of the threshold for a first manual operation is lower than a value of the threshold for a second manual operation, the first manual operation being for decreasing a consumption of the resources and the second manual operation being for increasing a consumption of the resources. 5. The apparatus control device according to claim 2 , further comprising: a cost conversion unit configured to convert a consumption of the resources into a cost; and a display output unit configured to display at least one of the consumption of the resources in a case where the intended apparatus is controlled in accordance with the control schedule, and the cost obtained into which the consumption is converted by the cost conversion unit. 6. The apparatus control device according to claim 2 , wherein the schedule change unit is configured to present a candidate of a post-changed control schedule in a process of changing the control schedule, and to finally decide change to the control schedule in response to manual input from a user. 7. An apparatus control system for controlling operation of multiple intended apparatuses in accordance with a control schedule, the apparatus control system comprising: the apparatus control device according to claim 2 ; and multiple intended apparatuses, each of which corresponds to the intended apparatus, wherein the execution unit is configured to control operations of the multiple intended apparatuses. 8. The apparatus control device according to claim 2 , wherein the first determination unit has a function of setting lengths of the multiple time periods. 9. An apparatus control device for controlling an operation of an intended apparatus in accordance with a control schedule, which consumes resources to operate, the apparatus control device comprising: a schedule storage unit configured to store a control schedule including multiple control commands each defining a pair of a control time and a control content, the control time and the control content being associated with each other; an execution unit configured to control the intended apparatus, at a control time defined in the control schedule stored in the schedule storage unit, in accordance with the control content associated with the control time; an obtainment unit configured to obtain, within a counting period equal to or more than two days, manual-operation information indicative of a control content of a manual-operation conducted by a user and a time at which the manual-operation is conducted with regard to control on the intended apparatus; a
electric · CPC title
Scheduling · CPC title
Domotique, domestic, home control, automation, smart house · CPC title
Improving electric energy efficiency or saving · CPC title
Cross-Sectional Technologies · mapped topic
Related publications grouped by family.
Answers are generated from the same data shown on this page.