Drainage system for gas turbine

US10054010B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-10054010-B2
Application numberUS-201414762949-A
CountryUS
Kind codeB2
Filing dateFeb 12, 2014
Priority dateFeb 22, 2013
Publication dateAug 21, 2018
Grant dateAug 21, 2018

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A drainage system includes at least one inflow pipe, a first outflow pipe, and a pressure vessel connected to the inflow pipe and the first outflow pipe separately. A throttle orifice plate and at least one switching valve are connected in series on each inflow pipe, and a throttle orifice plate and at least one switching valve are connected in series on the outflow pipe. The drainage system further includes a pressure release device, a check valve is also connected in series on each said inflow pipe, and a pressure measurement device is also connected to the pressure vessel. The pressure release device is an automatic pressure control valve connected to the pressure vessel. The drainage system for a gas turbine can remove condensate during operation of the gas turbine, thereby ensuring safe operation.

First claim

Opening claim text (preview).

The invention claimed is: 1. A drainage system for a gas turbine, comprising: at least one inflow pipe; a first outflow pipe; a pressure vessel, separately connected to the inflow pipe and the first outflow pipe, a throttle orifice plate and at least one switching valve being connected in series on each said at least one inflow pipe, and a throttle orifice plate and at least one switching valve being connected in series on the first outflow pipe; and a pressure release device, a check valve being also connected in series on each said at least one inflow pipe and a pressure measurement device being connected to the pressure vessel, wherein the pressure release device is an automatic pressure control valve connected to the pressure vessel. 2. The drainage system of claim 1 , further comprising another pressure release device, the another pressure release device being a safety valve with a manual function connected to the pressure vessel. 3. The drainage system of claim 2 , wherein a water injection pipe is also connected to the pressure vessel and wherein a switching valve is connected between the safety valve with a manual function and the pressure vessel, between the pressure measurement device and the pressure vessel, and on the water injection pipe, respectively. 4. A gas turbine comprising the drainage system of claim 3 . 5. The drainage system of claim 2 , wherein a liquid level measurement device is also connected to the pressure vessel. 6. The drainage system of claim 5 , wherein the pressure vessel further comprises a baffle, the baffle being perpendicular to a base plate of pressure vessel, and including an opening which allows condensate to pass through the baffle. 7. The drainage system of claim 2 , further comprising: a second outflow pipe, a throttle orifice plate and at least one switching valve being connected in series on the second outflow pipe; an inlet of the first outflow pipe being relatively higher than a base plate of the pressure vessel, and an inlet of the second outflow pipe being at the same height as the base plate of the pressure vessel, and the first outflow pipe and the second outflow pipe share a throttle orifice plate. 8. The drainage system of claim 7 , wherein a water injection pipe is also connected to the pressure vessel. 9. The drainage system of claim 7 , wherein a switching valve is connected between the safety valve with a manual function and the pressure vessel, between the pressure measurement device and the pressure vessel, and on the water injection pipe, respectively. 10. A gas turbine comprising the drainage system of claim 9 . 11. A gas turbine comprising the drainage system of claim 7 . 12. The drainage system of claim 1 , wherein a liquid level measurement device is also connected to the pressure vessel. 13. The drainage system of claim 12 , wherein the pressure vessel further comprises a baffle, the baffle being perpendicular to a base plate of the pressure vessel, and including an opening which allows condensate to pass through the baffle. 14. The drainage system of claim 12 , wherein a temperature measurement device is also connected to the pressure vessel. 15. The drainage system of claim 14 , wherein two switching valves are connected in series on each said at least one inflow pipe, the switching valves being electrical switching valves. 16. The drainage system of claim 15 , wherein said at least one inflow pipe includes five inflow pipes. 17. The drainage system of claim 1 , further comprising: a second outflow pipe, a throttle orifice plate and at least one switching valve being connected in series on the second outflow pipe; an inlet of the first outflow pipe being relatively higher than a base plate of the pressure vessel, and an inlet of the second outflow pipe being at the same height as the base plate of the pressure vessel, and the first outflow pipe and the second outflow pipe share a throttle orifice plate. 18. A gas turbine comprising the drainage system of claim 17 . 19. The drainage system of claim 1 , wherein a water injection pipe is also connected to the pressure vessel. 20. A gas turbine comprising the drainage system of claim 1 .

Assignees

Inventors

Classifications

  • F16T1/12Primary

    with valves controlled by excess or release of pressure · CPC title

  • F01D25/32Primary

    Collecting of condensation water; Drainage {; Removing solid particles} · CPC title

  • Fuel valves {(control of fuel supply by means of fuel metering valves F02C9/263)}; Draining valves or systems (valves in general F16K) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US10054010B2 cover?
A drainage system includes at least one inflow pipe, a first outflow pipe, and a pressure vessel connected to the inflow pipe and the first outflow pipe separately. A throttle orifice plate and at least one switching valve are connected in series on each inflow pipe, and a throttle orifice plate and at least one switching valve are connected in series on the outflow pipe. The drainage system fu…
Who is the assignee on this patent?
Siemens Ag
What technology area does this patent fall under?
Primary CPC classification F16T1/12. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Aug 21 2018 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).