Valve protection and tube management device
US-2023182058-A1 · Jun 15, 2023 · US
US10053267B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10053267-B2 |
| Application number | US-201414772906-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 6, 2014 |
| Priority date | Mar 7, 2013 |
| Publication date | Aug 21, 2018 |
| Grant date | Aug 21, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method including the following steps: placing a rear locking collar (62) around an outer ply (25), placing a first shaping guide (82) for shaping the folding of the end segments (32) of the outer ply (25); folding the end segments (32) of the outer ply (25) rearwards, folding the end segments (32) of an inner ply (24) rearwards. Before the step for folding the end segments (32) of the inner ply (24) rearwards, a second shaping guide (84) is placed for shaping the folding of the end segments (32) of the inner ply (24), a second shaping guide (84) being separate from the first shaping guide (82), the end segments (32) of the inner ply (24) bearing on the second shaping guide (84) after the folding step.
Opening claim text (preview).
What is claimed is: 1. A method for assembling an end-piece of a flexible pipe, the flexible pipe including an inner tubular structure having a central axis, an inner ply of tensile armors positioned around the inner tubular structure and an outer ply of tensile armors positioned around the inner ply, the method comprising the following steps: placing a rear locking collar of the armor plies around the outer ply; placing a first shaping guide for shaping the folding of the end segments of the outer ply; folding the end segments of the outer ply rearwards while forming a bend in front of the locking collar, the end segments of the outer ply pressing on the first guide; folding the end segments of the inner ply rearwards; the method including, before the step for folding the end segments of the inner ply rearwards, placing a second shaping guide for shaping the folding of the end segments of the inner ply, wherein the placing of the second shaping guide is carried out after the rearward folding of the end segments of the outer ply around the first shaping guide and before the rearward folding of the end segments toward the inner ply, the second shaping guide being separate from the first shaping guide, the end segments of the inner ply bearing on the second shaping guide after the folding step, wherein the placing of the second shaping guide includes arranging, around the inner ply, of a front locking collar of the inner ply, the second shaping guide being placed on the front locking collar the method including, after the folding steps, the following steps: inserting a front sealing assembly around the inner tubular structure; placing a vault of the end-piece in the end of the inner tubular structure; folding the end segments of the inner ply forward to place them around the vault; removing the second shaping guide; folding the end segments of the outer ply forward to place them outwardly at the end segments of the inner ply; removing the first shaping guide; and fastening an outer cover of the end-piece on the vault, the vault and the outer cover delimiting a chamber between them for receiving the end segments of the inner ply and the outer ply. 2. The method according to claim 1 , wherein after the folding steps, the end segments of the outer ply separate from the inner ply in a first axial position along the central axis, the end segments of the inner ply separating from the inner tubular structure in a second axial position, axially offset from the first axial position. 3. The method according to claim 1 , wherein the second shaping guide is positioned in front of the bend formed by the end segments of the outer ply during its placement. 4. The method according to claim 1 , including, after the folding of the end segments of the outer ply, and before the placement of the second shaping guide, cutting an anti-wear strip positioned between the inner ply and the outer ply. 5. The method according to claim 1 , including a step for removing the front collar, after having removed the second shaping guide and before folding the end segments of the inner ply forward to place them around the vault. 6. The method according to claim 1 , including a second step for removing the rear collar, after having removed the first shaping guide and before folding the end segments of the inner ply forward to place them outside the end segments of the inner ply. 7. The method according to claim 1 , including inserting a filler material able to solidify in the receiving chamber. 8. The method according to claim 1 , wherein the first guide and the second guide each have a convex front surface, with the convex side oriented forward, the respective end segments of the outer ply and the inner ply each bearing on a respective front surface of the first guide and the second guide.
Related publications grouped by family.
Answers are generated from the same data shown on this page.