Methods and systems for pressure testing components of a hydrocarbon well system
US-9175539-B2 · Nov 3, 2015 · US
US10048673B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10048673-B2 |
| Application number | US-201514884563-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 15, 2015 |
| Priority date | Oct 17, 2014 |
| Publication date | Aug 14, 2018 |
| Grant date | Aug 14, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A BOP system for use in a high pressure subsea environment, including a BOP stack including a lower marine riser package and a lower stack portion, the lower stack portion having a plurality of BOP rams attached to a subsea wellhead. The system also includes a riser subsystem extending from a drilling vessel to the BOP stack and providing fluid communication therebetween, a ship board subsystem electronically, mechanically, and hydraulically connected to the BOP stack and the riser subsystem to control the functions of the BOP stack and the riser subsystem, and a safety instrumented system having a surface logic solver and at least one subsea logic solver, the safety instrumented system in communication with at least a portion of the BOP rams to act as a redundant control system in case of failure of the ship board subsystem.
Opening claim text (preview).
What is claimed is: 1. A blowout preventer (BOP) system for use in a high pressure subsea environment, comprising: a BOP stack including a lower marine riser package and a lower stack portion, the lower stack portion having a plurality of BOP rams attached to a subsea wellhead; a riser subsystem extending from a drilling vessel to the BOP stack and providing fluid communication therebetween; a ship board subsystem electronically, mechanically, and hydraulically connected to the BOP stack and the riser subsystem to control the functions of the BOP stack and the riser subsystem; and a safety instrumented system having a surface logic solver and at least one subsea logic solver, the safety instrumented system in communication with at least a portion of the BOP rams to act as a redundant control system in case of failure of the ship board subsystem by providing hydraulic control and communication to the BOP stack. 2. The BOP system of claim 1 , further comprising: an auxiliary stack test system for connection to the BOP stack to test the BOP stack prior to deployment in order to ensure compliance of the BOP stack with predetermined standards, the auxiliary stack test system having testing hardware and software designed to mimic control system software and hardware to be used during drilling operations in order to test the BOP stack. 3. The BOP system of claim 1 , further comprising: a data management subsystem in communication with the ship board subsystem that hosts applications for controlling drilling operations, and that acts as a portal for transmitting data to a cloud based data management system. 4. The BOP system of claim 3 , wherein the data management subsystem comprises a server that resides on a drilling vessel. 5. The BOP system of claim 3 , wherein the data management subsystem utilizes cloud based data management services to transmit operational data about drilling operations. 6. The BOP system of claim 1 , further comprising: an umbilical subsystem including power cables, hydraulic hoses, and communication cables between the ship board subsystem and the BOP stack, riser subsystem, and safety instrumented system. 7. The BOP system of claim 1 , wherein the BOP system is operable with wells having a pressure of up to at least approximately 20,000 pounds per square inch. 8. The BOP system of claim 1 , wherein the BOP system is operable with well fluids having a temperature of up to at least approximately 350 degrees Fahrenheit. 9. A blowout preventer (BOP) system for use in a high pressure subsea environment, comprising: a BOP stack connected to a drilling vessel, the BOP stack including a lower marine riser package and a lower stack portion, the lower stack portion having a plurality of BOP rams attached to a subsea wellhead; and an auxiliary stack test system for connection to the BOP stack to test the BOP stack on the deck of a drilling vessel prior to deployment in order to ensure compliance of the BOP stack with predetermined standards, the auxiliary stack test system having testing hardware and software designed to mimic control system software and hardware to be used during drilling operations in order to effectively test the BOP stack, the auxiliary stack test system comprising a safety integrity level rated system cabinet configured to test a safety instrumented system of the BOP system; and the auxiliary stack test system to test redundancy of the safety instrumented system in providing hydraulic control and communication to the BOP stack. 10. The BOP system of claim 9 , further comprising: a ship board subsystem electronically, mechanically, and hydraulically connected to the BOP stack to control the functions of the BOP stack; and wherein the safety instrumented system has a surface logic solver and at least one subsea logic solver, the safety instrumented system in communication with at least a portion of the BOP rams to act as a redundant control system in case of failure of the ship board subsystem. 11. The BOP system of claim 10 , further comprising: a data management subsystem in communication with the ship board subsystem that provides a framework for hosting applications, and that acts as a portal for transmitting data to a cloud based data management system. 12. The BOP system of claim 11 , wherein the data management subsystem comprises a server that resides on a drilling vessel. 13. The BOP system of claim 11 , wherein the data management subsystem utilizes cloud based data management services to transmit operational data about drilling operations. 14. The BOP system of claim 11 , further comprising: an umbilical subsystem including power cables, hydraulic hoses, and communication cables between the ship board subsystem and the BOP stack, riser subsystem, and safety instrumented system. 15. The BOP system of claim 9 , wherein the BOP system is operable with wells having a pressure of up to at least approximately 20,000 pounds per square inch. 16. The BOP system of claim 9 , wherein the BOP system is operable with well fluids having a temperature of up to at least approximately 350 degrees Fahrenheit. 17. A method of drilling for oil and gas in a high pressure subsea environment, the method comprising: attaching a BOP stack to a wellhead at the sea floor, the wellhead capping a well having a pressure of up to at least approximately 20,000 pounds per square inch; connecting the BOP stack to a drilling vessel using a subsea riser subsystem; controlling functions of the BOP stack with a ship board subsystem that is electronically, mechanically, and hydraulically connected to components of the BOP stack; connecting logic solvers associated with a safety instrumented system, and separate from the ship board subsystem, to components of the BOP stack, the safety instrumented system to act as a redundant control system for the BOP stack by providing hydraulic control and communication to the BOP stack. 18. The method of claim 17 , further comprising: transmitting operational data to the cloud via a data management subsystem to notify of pending equipment service and failure patterns. 19. The method of claim 17 , further comprising: connecting the BOP stack to an auxiliary stack test system to test the BOP stack prior to deployment in order to ensure compliance of the BOP stack with predetermined standards. 20. The method of claim 19 , further comprising: testing the BOP stack on the deck of a drilling vessel using hardware and software in the auxiliary stack test system that mimics control system hardware and software to be used during drilling operations.
Control means therefor being outside the borehole {(control systems for submerged well heads E21B33/0355)} · CPC title
characterised by monitoring or safety (G05B19/19 takes precedence) · CPC title
specially adapted for underwater well heads · CPC title
Pressure · CPC title
Control systems, e.g. hydraulic, pneumatic, electric, acoustic, for submerged well heads · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.