Scintered powder metal shaped charges
US-9291039-B2 · Mar 22, 2016 · US
US10041769B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10041769-B2 |
| Application number | US-201615059273-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 2, 2016 |
| Priority date | Sep 10, 2009 |
| Publication date | Aug 7, 2018 |
| Grant date | Aug 7, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A shaped charge includes a casing defining an interior volume, wherein the casing is prepared by sintering a metal powder or a mixture of metal powders; a liner located in the interior volume; and an explosive between the liner and the casing. A method for manufacturing a shaped charge casing includes the steps of mixing a metal powder or a metal powder mixture with a binder to form a pre-mix; pressing the pre-mix in a mold to form a casing green body; heating the casing green body to a first temperature to vaporize the binder; raising the temperature to a second temperature in an inert or reducing atmosphere to sinter the metal powder or the metal powder mixture to produce the shaped charge casing.
Opening claim text (preview).
The invention claimed is: 1. A method for manufacturing a shaped charge casing, comprising: mixing a metal powder or a metal powder mixture with a binder to form a pre-mix; pressing the pre-mix in a mold to form a casing green body; heating the casing green body to a first temperature to vaporize the binder, wherein the first temperature is about 300-500° C.; raising the temperature to a second temperature in an inert or reducing atmosphere to sinter the metal powder or the metal powder mixture to produce the shaped charge casing. 2. The method of claim 1 , wherein the metal powder comprises steel powder. 3. The method of claim 1 , the metal powder mixture comprises steel powder and an additive. 4. The method of claim 3 , wherein the additive is carbon or graphite. 5. The method of claim 3 , wherein the additive is at least one selected from the group consisting of tin powder, zinc powder, brass powder, and bronze powder. 6. The method of claim 3 , wherein the steel powder comprise 80-90% by weight and the comprises 10-20% by weight. 7. The method of claim 3 , the additive comprises a mixture of tungsten and nickel or a mixture of tungsten and cobalt. 8. The method of claim 1 , further comprising steam treating the shaped charge casing with a coating of iron oxide. 9. The method of claim 1 , wherein the second temperature is about 1150° C.
Aspects linked to processes or compositions used in powder metallurgy · CPC title
characterised by lowering in vertical position and subsequent tilting to operating position · CPC title
Shaped-charge perforators (E21B43/118 takes precedence) · CPC title
Container manufacturing · CPC title
Processes characterised by the sequence of their steps · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.