Inclined layered solid-filling mining method in ultrathick coal layer
US-2016102553-A1 · Apr 14, 2016 · US
US10036252B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10036252-B2 |
| Application number | US-201515319292-A |
| Country | US |
| Kind code | B2 |
| Filing date | May 13, 2015 |
| Priority date | Jun 25, 2014 |
| Publication date | Jul 31, 2018 |
| Grant date | Jul 31, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for removing a hydraulic support for solid filling coal mining includes digging a support removing channel ( 3 ) in a coal body ( 2 ) in front of the hydraulic support ( 1 ), and laying a support removing track ( 4 ), then removing the hydraulic support from a coal conveying gateway ( 11 ) to a track gateway ( 5 ), temporary supporting is carried out by matching a single supporting column with a n-type steel beam before each hydraulic support is removed. A supporting roof is reinforced in time by means of erecting a crib ( 13 ) and grouting after each hydraulic support is removed, three grouting pipelines ( 12 ) are laid after the supports of the whole work surface are removed, and grouting is carried out in the whole finishing cut space. The roof of the support removing space of the work surface is stable so that the hydraulic supports on the work surface of solid filling coal mining are ensured to be safely and efficiently removed.
Opening claim text (preview).
We claim: 1. A method for removing a plurality of filling coal mining hydraulic supports for solid filling coal mining, comprising the following steps: a. excavating a support removing channel along a working face in a coal body in front of a first filling coal mining hydraulic support, and supporting an exposed roof by a conventional anchor belt net and a cable plus single prop approach; b. laying support removing rails in the support removing channel, and installing a winch in a tail entry of the removing channel; c. removing a coal mining machine, and a first section of a scraper conveyor and a first section of a filling mining conveyor in front of the first filling coal mining hydraulic support; d. providing temporary supports within a roof control scope of the first filling coal mining hydraulic support, and then removing the first filling coal mining hydraulic support and transporting the removed first filling coal mining hydraulic support along the support removing channel via the support removing rails; e. repeating steps (a) through (d) until all of the plurality of filling coal mining hydraulic supports along the entire working face in the coal body are removed; f. providing a plurality of reinforced supports for supporting the exposed roof to form a pedestrian passageway, wherein, the distance between the reinforced supports is 2.0 m; and g. clearing the working face, laying grouting pipelines in the pedestrian passageway, and grouting into the grouting pipelines. 2. The method for removing a plurality of filling coal mining hydraulic supports according to claim 1 , wherein a width of the support removing channel is between 3 m and 4 m. 3. The method for removing a plurality of filling coal mining hydraulic supports according to claim 1 , wherein the temporary supports are pi-shaped (π-shaped) steel beams. 4. The method for removing a plurality of filling coal mining hydraulic supports according to claim 1 , wherein the plurality of reinforced supports are provided by erecting timber cribs, sealing the timber cribs with a bonding tape, and grouting concrete grout into the timber cribs with a grouting machine. 5. The method for removing a plurality of filling coal mining hydraulic supports according to claim 4 , wherein the dimensions of the timber cribs are 2.0 m×2.0 m. 6. The method for removing a plurality of filling coal mining hydraulic supports according to claim 1 , wherein the grouting pipelines are laid in the pedestrian passageway between two rows of the timber cribs, and three grouting pipelines are laid from a coal conveying gateway to the tail entry.
along the working face · CPC title
Supporting means, e.g. shuttering, for filling-up materials · CPC title
Filling-up mechanically · CPC title
Supports specially adapted for use in combination with the placing of filling-up materials (placing filling-up materials in underground workings per se E21F15/00) · CPC title
for mine roof support units for step-by-step movement · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.