System and method for predicting and managing life consumption of gas turbine parts
US-2016160762-A1 · Jun 9, 2016 · US
US10033317B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-10033317-B2 |
| Application number | US-201615294057-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 14, 2016 |
| Priority date | Oct 14, 2016 |
| Publication date | Jul 24, 2018 |
| Grant date | Jul 24, 2018 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
In the context of electric power generation facilities, a system and method that enable control of maximum sustained rate of change in output to accommodate changing load conditions and to facilitate efficient use of system resources are disclosed. In accordance with aspects of the disclosed subject matter, a ramp rate for an electric generator source may be set, operating parameters may be monitored, rates of change or discrepancies of the operating parameters over time may be computed; and output signals may then be used selectively to control certain system components.
Opening claim text (preview).
What is claimed is: 1. A method comprising: setting a ramp rate for an electric source; monitoring operating parameters at components of the source including one or more of a boiler, a steam turbine, an electric generator, and a stack; computing rates of change or discrepancies of the operating parameters over time; and providing output signals as a result of said monitoring and said computing selectively to control one of the boiler, the turbine, or the generator, wherein said setting a ramp rate comprises utilizing the output signals selectively to vary the ramp rate based on the operating parameters, wherein said setting a ramp rate further comprises utilizing input from a distributed control system component remote from the electric source, and wherein said setting a ramp rate further comprises utilizing input from a solar generator source having a solar unit controller in communication with the distributed control system component. 2. The method of claim 1 wherein the operating parameters include throttle pressure at the boiler, first stage metal temperature at the turbine, megawatt error at the generator, and opacity at the stack. 3. The method of claim 2 wherein said providing output signals comprises selectively transmitting the output signals to ones of the boiler, turbine, generator, and stack to control the operating parameters. 4. An electric power generation system comprising: a generator source including a boiler, a steam turbine, an electric generator, and a stack, each of said boiler, turbine, generator, and stack comprising an associated control component; a unit controller in communication with the associated control component at each of said boiler, turbine, generator, and stack; said unit controller configured and operative to perform a method comprising: setting a ramp rate for said generator source, the ramp rate indicative of a change in output level of said generator; receiving data representative of operating parameters from the associated control component at one or more of said boiler, turbine, generator, and stack; computing rates of change or discrepancies of the operating parameters over time; and providing output signals as a result of the receiving and the computing selectively to control one of said boiler, turbine, or generator; an additional generator source, an additional unit controller, and a distributed control system component in communication with said unit controller and said additional unit controller; and a solar generator source having a solar unit controller, wherein said distributed control system component is in communication with said solar unit controller, and setting a ramp rate comprises utilizing input from said solar unit controller. 5. The system of claim 4 wherein the operating parameters include throttle pressure at said boiler, first stage metal temperature at said turbine, megawatt error at said generator, and opacity at said stack. 6. The system of claim 5 wherein providing output signals comprises selectively transmitting the output signals to the associated control component at ones of said boiler, turbine, generator, and stack to control the operating parameters. 7. The system of claim 4 wherein setting a ramp rate comprises utilizing the output signals selectively to vary the ramp rate based on the operating parameters. 8. The system of claim 4 wherein, for each of said unit controller and said additional unit controller, setting a ramp rate comprises utilizing input from said distributed control system component. 9. The system of claim 8 wherein the setting a ramp rate further comprises utilizing, at said distributed control system component, the output signals from said unit controller selectively to vary the ramp rate at said additional generator source. 10. A method of utilizing resources at an electric power generation facility, said method comprising: employing a plurality of electric power sources, each of the plurality of power sources including a boiler, a steam turbine, an electric generator, a stack, and a unit controller; providing a distributed control system component remote from the electrical power sources and in communication with the unit controller at each of the plurality of power sources; for each of the of power sources: setting a ramp rate, the ramp rate indicative of a change in output level of said generator; monitoring operating parameters of one or more of the boiler, turbine, generator, and stack; computing rates of change or discrepancies of the operating parameters over time; and providing output signals as a result of said monitoring and said computing selectively to control one of the boiler, the turbine, or the generator, wherein said setting a ramp rate comprises utilizing the output signals selectively to vary the ramp rate based on the operating parameters, wherein said setting a ramp rate further comprises utilizing input from the distributed control system component, and wherein said setting a ramp rate further comprises utilizing input from a solar generator source having a solar unit controller in communication with the distributed control system component; and receiving, at the distributed control system component, responsive to said monitoring, said computing, and said providing, data representative of the operating parameters at each of the plurality of power sources. 11. The method of claim 10 wherein the operating parameters include throttle pressure at the boiler, first stage metal temperature at the turbine, megawatt error at the generator, and opacity at the stack. 12. The method of claim 11 wherein said providing output signals comprises selectively transmitting the output signals to ones of the boiler, the turbine, the generator, and the stack to control the operating parameters. 13. The method of claim 10 wherein said setting a ramp rate comprises utilizing the output signals selectively to vary the ramp rate based on the operating parameters. 14. The method of claim 13 wherein said setting a ramp rate further comprises utilizing input from the distributed control system component. 15. The method of claim 14 wherein said setting a ramp rate for each of the plurality of power sources comprises utilizing the operating parameters from each of the others of the plurality of power sources. 16. The method of claim 15 wherein said setting a ramp rate further comprises maximizing ramp rate for a number of the plurality of power sources necessary to satisfy a steady state load.
Photovoltaics · CPC title
the engines being turbines · CPC title
wherein the generator is controlled by the requirements of the prime mover · CPC title
Control effected upon non-electric prime mover and dependent upon electric output value of the generator · CPC title
Controlling, e.g. stopping or starting · CPC title